Date FiledSummaryPages
10/05/2001Memo closing this case of record.2
07/07/1999ICN #0067 Notification that construction of the Riverview- Elkem 138 kV Transmission Line was completed on September 28, 1998 and the line was energized on October 30, 1998, filed on behalf of applicant by T. Zitterbart. (1 pg.)1
12/31/1998ICN #0066 Mandate, judgment entry, and appeal from the Ohio Power Siting Board, filed on behalf of The Supreme Court of Ohio. (2 pgs.)2
12/01/1998ICN #0065 Application for dismissal of its appeal, filed on behalf of applicant by C. Schraff. (4 pgs.)4
11/23/1998ICN #0064 Entry ordering that the Board finds that since all outstanding issues have been resolved, there is no longer a need for the Board Staff to file a report in this docket; the Board finds that the proposed project will be consistent with plans for expansion of the regional power grid and will serve the interest of electric systems econ- omy and reliability; further, the Board finds that to the extent that the agreement requires any additional constru- ction, Monongahela shall comply with the conditions of the certificate issued in this case. (3 pgs.)3
11/19/1998ICN #0063 Joint stipulation for dismissal filed on behalf of applicant by G. Jack; Elkem Metals by F. King; and AMP- Ohio by J. Bentine. (1 pg.)1
10/30/1998ICN #0062 Notice of Appeal filed on behalf of applicant by C. Schraff. (7 pgs.)7
09/29/1998ICN #0061 Study proposal submitted to Allegheny Power by ABB, filed on behalf of applicant by G. Jack. (23 pgs.)23
09/18/1998ICN #0060 Cost estimates for the four options depicted in the ABB Report, filed on behalf of applicant by G. Jack. (5 pgs.)5
09/01/1998ICN #0059 Reliability Study of Sectionalizing Equipment for Gorsuch Power Station filed. (52 pgs.) (FILED 8/31/98)52
08/31/1998ICN #0057 Portion of the Ohio Power Siting Board-directed study in connection with this case, filed by D. Rogers. (41 pgs.)41
08/31/1998ICN #0058 Entry denying Amp-Ohio's application for rehear- ing and denying each of Monongahela's requests for rehear- ing; that the Board's July 13, 1998 Order is clarified in regards to the Staff's involvement in determining whether a breaker or switch(es) shall be installed or the switch(es) improved pursuant to Finding 9. (9 pgs.)9
08/28/1998ICN #0056 Motion for finding of violation of R.C. Section 4906.98 and for other relief and memorandum in support filed on behalf of American Municipal Power by J. Bentine. (19 pgs.)19
08/27/1998ICN #0055 Entry ordering that Monongahela's request for an extension is granted and that the studies and other infor- mation shall be filed by August 31, 1998. (AE) (2 pgs.)2
08/24/1998AMP-Ohio's memorandum contra Monongahela Power Company's Application for Rehearing, filed by J. Bentine. (5 pgs)5
08/18/1998ICN #0053 Motion for extension of time filed on behalf of applicant by G. Jack. (6 pgs.)6
08/14/1998ICN #0052 Additional information filed on behalf of appli- cant by T. Zitterbart. (2 pgs.)2
08/14/1998ICN #0051 Response to Kim Wissman's, PUCO, letter of August 3, 1998, filed on behalf of applicant by G. Jack. (2 pgs.)2
08/14/1998ICN #0050 Correspondence letter to Gary Jack, filed on behalf of AMP-Ohio by J. Bentine. (2 pgs.)2
08/14/1998ICN #0049 Response letter to Gary A. Jack and Francis A. King filed by K. Wissman, PUCO staff. (1 pg.)1
08/12/1998ICN #0048 Application for rehearing and memorandum in support filed on behalf of applicant by G. Jack. (15 pgs.)15
08/12/1998ICN #0047 Application for rehearing and reconsideration and memorandum in support filed on behalf of AMP-Ohio by J. Ben- tine. (4 pgs.)4
08/06/1998ICN #0046 Response letter to Mr. Gary A. Jack, Monongahela Power Company, filed by K. Wissman, PUCO staff. (1 pg.)1
08/03/1998ICN #0045 State of Ohio Department of Transportation Permit for limited access along State Route 7, filed on behalf of applicant by T. Zitterbart. (4 pgs.)4
07/31/1998ICN #0044 Letter stating that applicant commenced construc- tion of this project on July 14, 1998, filed by T. Zitter- bart. (1 pg.)1
07/16/1998ICN #0043 Engineering drawings for the Riverview-Elkem No. 6140 138kV transmission line, filed on behalf of applicant by L. Mattei. (4 pgs.)4
07/16/1998ICN #0042 Letter to Lawrence P. Mattei, Allegheny Power, stating that the engineering drawings for this project have been reviewed by the staff, and that he may proceed with construction, filed by K. Wissman, PUCO staff. (1 pg.)1
07/15/1998ICN #0041 Correspondence letter to Gary A. Jack, Monongahela Power Company, regarding the construction which began on July 14, 1998, filed by K. Wissman, PUCO staff. (1 pg.)1
07/13/1998Opinion, Order, and Certificate ordering that, subject to the conditions set forth in this order, a certificate of environmental compatibility and public need is hereby issued for the construction, operation, and maintenance of the Riverview-Elkem No. 6140 138 kV transmission line along the preferred route; that the certificate shall con- tain the conditions set forth in Section IV, as revised by the Staff, and Section V of this order; that Mon Power determine, in consultation with Amp-Ohio, and provide to the OPSB staff the information as to the breaker and switch (es) within 30 days of the journalization of this order; that Mon Power be ready to install the breaker or switch(es) as staff determines necessary, upon final action by the parties or the Ohio Supreme Court in Case No. 97-2571, up- holding the underlying contracts. (26 pgs.)26
05/20/1998ICN #0039 Proof of Publication filed on behalf of applicant by G. Jack. (3 pgs.) (Washington County)3
05/11/1998Transcript of hearing held April 27, 1998. Volume III. (118 pgs.) Submitted.118
05/11/1998Composite Index. (6 pgs.)6
05/11/1998Post-Hearing Brief submitted on behalf of the staff of the Ohio Power Siting Board. Filed by: W. Wright (PUCO), M. Malone (Atty. for OPSB) (27 pgs.)27
05/11/1998Brief of Intervenor, Elkem Metals Company, L.P. Submitted by: G. Russell (14 pgs.)14
05/11/1998Post-Hearing Brief of American Municipal Power-Ohio, Inc. Submitted by: J. Bentine. (12 pgs.)12
05/08/1998Brief of Monongahela Power Company filed by G. Jack. (19 pgs)19
04/29/1998ICN #0031 Transcript filed for hearing held 4/15/98, (GS), 135 pgs., Con't. (PUCO-Columbus, OH)135
04/28/1998ICN #0030 Transcript filed for hearing held 4/14/98, (GS), 127 pgs., Con't. (Volume I) (PUCO-Columbus, OH)127
04/28/1998ICN #0029 Transcript filed for hearing held 4/13/98, (GS), 8 pgs. (Public hearing - Marietta, Ohio)8
04/27/1998Motion to strike and the surrebuttal testimony of Michael R. Godfrey and Terry V. Spencer filed by G. Jack. (30 pgs)30
04/20/1998ICN #0027 Prepared rebuttal testimony of Carroll Scheer filed on behalf of AMP-Ohio by J. Bentine. (36 pgs.)36
04/09/1998ICN #0023 Testimony of Tracey J. Zitterbart and Michael R. Godfrey, and issues list filed on behalf of applicant by G. Jack. (30 pgs.)30
04/09/1998Testimony continued. (Part 3 of 3)167
04/09/1998Testimony continued. (Part 2 of 3)150
04/09/1998ICN #0026 Direct prepared testimony of Robert L. Flygar filed on behalf of Elkem Metals Co. by G. Rulless. (Part 1 of 3)150
04/09/1998ICN #0026 Direct prepared testimony of Robert L. Flygar filed on behalf of Elkem Metals Co. by G. Rulless. (463 pgs.)463
04/09/1998ICN #0025 Issues list filed on behalf of American Munici- pal Power-Ohio by J. Small. (3 pgs.)3
04/09/1998ICN #0024 Issues list filed on behalf of Elkem Metals Co. by G. Russell. (2 pgs.)2
04/02/1998ICN #0022 Entry ordering that all parties are directed to file any expert testimony to be offered at the hearing by April 9, 1998; the parties shall also file an issues list by April 9, 1998. (AE) (1 pg.)1
03/31/1998ICN #0021 Designation of trial attorney filed on behalf of Elkem Metals Co. by G. Russell. (2 pgs.)2
03/30/1998ICN #0020 Notice of appearance filed on behalf of inter- venor, Elkem Metals Co., by S. Taft. (2 pgs.)2
03/27/1998ICN #0019 Staff Report filed. (43 pgs.)43
03/25/1998ICN #0018 Responses to the interrogatories and requests for production of documents filed on behalf of applicant by G. Jack. (24 pgs.)24
02/27/1998ICN #0017 Interrogatories and request for production of documents submitted on behalf of the Ohio Power Siting Board by W. Wright. (11 pgs.)11
02/26/1998ICN #0016 Proof of service filed on behalf of applicant by G. Jack. (8 pgs.)8
02/11/1998Entry ordering that Elkem's motion to intervene is granted. It is further ordered that Mon Power's request to waive the requirement that a short-form application be filed one year prior to constructing transmission lines pursuant to section 4906.06(A)(6), revised code, and file fully developed information on an alternative site as required by rule 4906-5-03, O.A.C., be waived. It is further ordered that Mon Power's request to waive the hearing is denied and that the hearings in this matter be scheduled at the times and places designated in finding (8). It is further ordered that notices of the hearings be published by Mon Power in accordance with finding (9) and (10) and that the Board will accept petitions to intervene in the adjudicatory hearing by interested persons up to five days prior to the scheduled date for the non adjudicatory hearing, or later if good cause is shown in accordance with finding (11). (AE) (4 pgs.)4
02/11/1998ICN #0014 Letter to Mr. Jack stating that the application has been certified as being complete filed by the PUCO staff (2 pgs.)2
02/09/1998Short-term application filed on behalf of applicant by G. Jack. (96 pgs.)96
01/14/1998ICN #0013 Memorandum contra of American Municipal Power- Ohio to Elkem Metals interlocutory appeal and motion to certify the interlocutory appeal filed by J. Small. (9 pgs.)9
01/09/1998ICN #0012 Interlocutory appeal filed on behalf of Elkem Metals by S. Taft. (14 pgs.)14
01/09/1998ICN #0011 Petition for leave to intervene and memorandum in support filed on behalf of Elkem Metals by S. Taft. (6 pgs.)6
01/09/1998ICN #0010 Motion to certify interlocutory appeal filed on behalf of Elkem Metals by S. Taft. (3 pgs.)3
01/06/1998ICN #0009 Entry ordering that the motion of Amp-Ohio to intervene be granted and that this case be reopened for the submittal of a short-form application. (AE) (3 pgs.)3
12/22/1997ICN #0008 Reply of American Municipal Power-Ohio, Inc. to memorandum contra of Monongahela Power Company to motion to reopen the case and motion to intervene, filed by J. Small. (8 pgs.)8
12/19/1997ICN #0007 Affidavit of Tracey Zitterbart filed on behalf of applicant by G. Jack. (2 pgs.)2
12/15/1997ICN #0006 Reply of Monongahela Power Company to The American Municipal Power-Ohio, Inc. motion to reopen the case, motion to intervene, and applicaiton for rehearing, filed by G. Jack. (10 pgs.)10
12/02/1997ICN #0005 Motion to reopen the case, motion to intervene, and application for rehearing and memorandum in support filed on behalf of American Municipal Power-Ohio, Inc. by J. Small. (12 pgs.)12
11/12/1997ICN #0004 Letter in response to letter of notification filed on behalf of the PUCO staff, by K. Wissman. (1 pg.)1
11/06/1997ICN #0003 Letter of Notification filed on behalf of appli- cant by G. Jack. (2 pgs.)2
11/06/1997ICN #0002 Investigation report approving the letter of notification, filed by R. Yerian, PUCO staff. (1 pg.)1
10/16/1997ICN# 0001 In the matter of the Letter of Notification for the construction of the Riverview-Elkem No. 6140 138 kV transmission line in Warren Township, Washington County, Ohio. (38 pgs.)38