10/14/1999 | Revised tariff, PUCO No. 6, Check List, 386th sheet 1; Section 2.3, 9th sheet 8, filed on behalf of respondent, GTE North, by J. Kennedy. (3 pgs.) | 3 |
10/12/1999 | Revised tariff, PUCO No. 3, Section 1, 3rd page 8; Section 3, 4th page 7, 1st page 10, 1st page 34, filed on behalf of respondent, Cincinnati Bell, by E. King. (5 pgs.) | 5 |
09/17/1999 | Letter stating that Cincinnati Bell Telephone Co. and GTE North have established November 11, 1999 as the implemen- tation date for two-way nonoptional measured-rate EAS be- tween Cincinnati, Clermont, and Williamsburg exchanges and the Sardinia exchange served by GTE North, filed by E. King. (2 pgs.) | 2 |
06/21/1999 | Letter stating that the in-service date for the institution of two-way measured-rate EAS between GTE's Sardinia exchange on the one hand and Cincinnati Bell's Cincinnati, Clermont, and Williamsburg exchanges on the other hand is November 11, 1999, filed on behalf of respondent, GTE North, by J. Ken- nedy. (1 pg.) | 1 |
05/26/1999 | Supplemental Opinion & Order ordering that two-way, measured-rate EAS be instituted between the Sardinia exchange and the Cincinnati, Clermont, and Williamsburg exchanges within six months from the date of this order; that GTE and Cincinnati Bell establish an in-service date within four months of this order, inform the Commission of the date, and advise the Commission not later than 30 days prior to the in-service date in the event the date cannot be met; that GTE and Cincinnati Bell are authorized to file three copies of revised tariff sheets reflecting the estab- lishment of two-way, measured-rate EAS. (5 pgs.) | 5 |
05/06/1999 | Cost information response filed on behalf of respondent, Cincinnati Bell, by E. King. (4 pgs.) | 4 |
05/06/1999 | Cincinnati Bell Telephone Company's cost information response to March 10, 1999 opinion and order filed by E. King. | 0 |
04/09/1999 | Request regarding implementation date, filed on behalf of respondent, Cincinnati Bell, by J. Harrison. (4 pgs.) | 4 |
04/06/1999 | Response to 3/10/99 opinion and order filed by W. Keating on behalf of GTE North. (18 pgs) | 18 |
03/10/1999 | Opinion & Order that the respondents file within 60 days of this order cost data for implementing two-way, measured-rate EAS between the Sardinia Exchange and the Cincinnati, Cler- mont, and Williamsburg exchanges; that the respondents file within 30 days of this order further justification for their proposed 12-month implementation schedule; that two-way, nonoptional, measured-rate EAS between the Sardinia Exchange and the Cincinnati, Clermont, and Williamsburg exchanges is granted, contingent upon the review of cost data and a modi- fied rate structure for ELCP; that the request for two-way, nonoptional, flat-rate EAS, or any alternative form of EAS between the Sardinia Exchange and the Bethel and Newtons- ville exchanges is denied; accordingly, those exchanges are dismissed from this proceeding; that GTE, within 60 days of this order, propose a more appropriate measured-rate local service offering. (20 pgs.) | 20 |
08/20/1998 | Transcript filed for hearing held 7/30/98, (DJ), 165 pgs. (Sardinia, Ohio) | 165 |
07/22/1998 | Testimony and attachments of Patricia J. Cook filed on be- half of respondent, GTE North, by W. Keating. (19 pgs.) | 19 |
07/20/1998 | Proof of Publication filed. (1 pg.) (Hamilton County) | 1 |
06/22/1998 | Entry ordering that Ameritech's motion to file its answer instanter is granted; that GTE's and CBT's cost studies shall be deemed timely filed; that Little Miami and Ameri- tech are dismissed from this proceeding; scheduling a public hearing at at 10:00 a.m. on July 30, 1998, at the Life Squad Building on Winchester St. in Sardinia, Ohio; that any person or entity requesting intervention in this matter do so by July 15, 1998. (AE) (5 pgs.) | 5 |
05/20/1998 | Testimnony of Evelyn W. King regarding calling statistics filed on behalf of Cincinnati Bell Telephone Co. by J. Harrison. (12 pgs.) | 12 |
|