Case Number | Case Title | Open Date | Closed Date |
02-2418-EL-BNR | FIRST ENERGY CORP/CITY OF MENTOR IN LAKE COUNTY, OHIO | 09/18/2002 | |
02-2552-EL-BNR | CINCINNATI GAS & ELECTRIC COMPANY | 10/04/2002 | |
02-2553-EL-BNR | CINCINNATI GAS & ELECTRIC COMPANY | 10/04/2002 | |
02-3127-EL-BNR | MCCOMB-CENTRAL-GAY 138KV LINE RELOCATION | 11/26/2002 | |
02-3339-EL-BNR | FIRSTENERGY CORP./EMILY-FOX PROJECT | 12/23/2002 | |
03-0256-EL-BNR | AMERICAN ELECTRIC POWER/SOUTH PEMBERVILLE-FREMONT 138kV/SANDUSKY COUNTY | 01/29/2003 | |
03-0935-EL-BNR | AMERICAN ELECTRIC POWER COMPANY | 04/07/2003 | |
04-0733-EL-BNR | CINCINNATI GAS & ELECTRIC COMPANY | 05/13/2004 | |
05-0845-EL-BNR | MONTGOMERY ROAD 138KV TRANSMISSION LINE RELOCATION PROJECT/CINERGY CORP. | 07/01/2005 | |
06-1252-EL-BNR | AMERICAN TRANSMISSION SYSTEMS, INC./RICHLAND-ROBINSON PARK/US 24 & CARPENTER ROAD | 10/13/2006 | |
06-1488-EL-BNR | AEP/COLUMBUS SOUTHERN POWER / BIXBY-MARION LSII 138KV LINE | 12/20/2006 | |
07-0146-EL-BNR | DUKE ENERGY/PIERCE SUBSTATION EXPANSION PROJECT | 02/12/2007 | |
07-0627-EL-BNR | COLUMBUS SOUTHERN POWER/ CONSTRUCTION NOTICE FOR THE HYATT-GENOA 138 KV TEMPORARY LINE RELOCATION | 05/23/2007 | |
07-0925-EL-BNR | AMERICAN TRANSMISSION SYSTEMS INC / ANGOLA MIDWAY 138KV TRANSMISSION LINE RELOCATION FOR I 475 SALISBURY ROAD/DUSSEL DRIVE INTERCHANGE IMPROVEMENTS | 08/16/2007 | |
07-1259-EL-BNR | AMERICAN TRANSMISSION SYSTEMS, INC. (FOWLES GROUP 138 KV TRANSMISSION LINE RELOCATION NEAR EASTLAND AND SHELDON ROADS) | 12/10/2007 | |
07-1269-EL-BNR | DUKE ENERGY OHIO/MONTGOMERY ROAD | 12/17/2007 | |
07-1271-EL-BNR | DUKE ENERGY OHIO/TODHUNTER TO AK STEEL | 12/17/2007 | |
09-0111-EL-BNR | AMERCIAN TRANSMISSION SYSTEMS INC/ EMILY-FOX 138 KV TRANSMISSION LINE RELOCATION | 02/17/2009 | |
11-1117-EL-BNR | DUKE ENERGY OHIO | 03/01/2011 | |
11-5562-EL-BNR | Poston-Ross 138k V Line (Reconductor/Rebuild Project Section 2) | 10/28/2011 | |
12-1052-EL-BNR | Corridor Station Expansion | 03/22/2012 | |
12-1847-EL-BNR | North Proctorville Station Expansion | 06/15/2012 | |
12-2112-EL-BNR | WAVERLY ADAMS SEAMAN 138 kV TAP WARE ROAD STATION PROJECT | 07/18/2012 | |
12-2208-EL-BNR | HANNA-WEST RAVENNA #1 & #2 138 KV DOUBLE CIRCUIT TRANSMISSION LINE RECONDUCTOR PROJECT | 08/01/2012 | |
12-2453-EL-BNR | REPUBLIC STEEL INC 138 KV TRANSMISSION LINE | 09/05/2012 | |
12-2481-EL-BNR | WEST LANCASTER-BIXBY 138 kV LINE RECONDUCTOR/REBUILD PROJECT | 09/10/2012 | |
12-2639-EL-BNR | IRWIN SIMPSON/SNIDER ROAD WIDENING TRANSMISSION LINE RELOCATION | 09/28/2012 | |
12-2781-EL-BNR | AMERICAN TRANSMISSION SYSTEMS INCORPORATED | 10/24/2012 | |
12-3301-EL-BNR | AVON CRESTWOOD Q1 138 kV RECONDUCTORING PROJECT | 12/27/2012 | |
13-0027-EL-BNR | MELDAHL DAM TRANSMISSION TAP LINE | 01/03/2013 | |
13-0554-EL-BNR | POSTON ELLIOTT 138KV RECONDUCTOR REBUILD PROJECT | 02/28/2013 | |
13-0669-EL-BNR | AEP OHIO/WAGENHALS WEST CANTON | 03/14/2013 | |
13-1011-EL-BNR | WEST BELLAIRE BRUES 138 KV LINE | 04/29/2013 | |
13-1018-EL-BNR | WADSWORTH MUNI SILVERCREST WEST AKRON | 04/24/2013 | |
13-1033-EL-BNR | DUKE ENERGY WEST END SUBSTATION RELOCATION PROJECT | 04/25/2013 | |
13-1158-EL-BNR | WEST LANCASTER BIXBY 138 KV LINE RECONDUCTOR/REBUILD PROJECT PHASE 2 | 05/10/2013 | |
13-1243-EL-BNR | AMERICAN TRANSMISSION SYSTEMS INC ALLEN JUNCTION SUBSTATION EXPANSION PROJECT | 05/23/2013 | |
13-1533-EL-BNR | AEP TRANSCO | 06/28/2013 | |
13-1611-EL-BNR | BABB EAST AKRON 138kV TRANSMISSION LINE RELOCATION FOR SEIBERLING STREET RECONSTRUCTION PROJECT | 07/11/2013 | |
13-1706-EL-BNR | NORTH FINDLAY STATION EXPANSION | 08/16/2013 | |
13-1707-EL-BNR | FINDLAY CENTER STATION EXPANSION | 08/16/2013 | |
13-1797-EL-BNR | BAYSHORE SUBSTATION PROJECT | 08/16/2013 | |
13-1835-EL-BNR | TANGY SUBSTATION EXPANSION | 08/23/2013 | |
13-1934-EL-BNR | MASURY SHENANGO RECONDUCTORING PROJECT | 09/16/2013 | |
13-2234-EL-BNR | Angola-Eber-Vulcan 138 kV Transmission Line Relocation for Dorr Street Expansion Project | 12/02/2013 | |
13-2350-EL-BNR | Beaver to Brownhelm Junction 345kV Transmission Line Temporary Transmission Line Extension Project | 12/05/2013 | |
14-0024-EL-BNR | AEP OHIO TRANSMISSION COMPANY | 01/08/2014 | |
14-0099-EL-BNR | AVON-BEAVER #1 & #2 345 kV TRANSMISSION LINE STRUCTURE REPLACEMENT FOR STATE ROUTE 2 BRIDGE CONSTRUCTION | 01/17/2014 | |
14-0108-EL-BNR | Cloverdale-Harmon #2 69 kV Transmission Line Construction Project | 02/06/2014 | |
14-0132-EL-BNR | American Transmissions Inc/Boardman – Sammis 138 kV Loop Transmission Line Loop to Nevada Substation | 02/04/2014 | |
14-0267-EL-BNR | Bluebell-Niles 138 kV Transmission Line Loop To Berlin Lake Substation | 03/10/2014 | |
14-0560-EL-BNR | CLARK SUBSTATION EXPANSION | 04/07/2014 | |
14-0930-EL-BNR | Brookside-Howard 138 kV Transmission Line Reconductoring Project | 06/05/2014 | |
14-1085-EL-BNR | American Transmission Systems, Incorporated/Avon-Fowles Q1 and Q3 138 kV Transmission Lines Dual Tap to Bentley Substation Project | 06/18/2014 | |
14-1086-EL-BNR | Barberton-West Akron 138 kV Transmission Line Reconductoring Project | 06/24/2014 | |
14-1177-EL-BNR | Lemoyne Substation Expansion | 07/09/2014 | |
14-1399-EL-BNR | South Canton 345-kV Transformer Lead Transmission Line Reconductoring Project | 08/22/2014 | |
14-1405-EL-BNR | Leroy Center Substation Transmission Lines Reconfiguration Project | 09/22/2014 | |
14-1422-EL-BNR | Wadsworth Muni Silvercrest-West Akron 138 kV Transmission Line By-Pass at Pine Sub | 09/09/2014 | |
14-1512-EL-BNR | Lake Shore SVC 138 kV Transmission Line Project | 10/27/2014 | |
14-1547-EL-BNR | Hazelton 138 kV Transmission Line Tap Project | 09/11/2014 | |
14-1772-EL-BNR | Niles-Niles 138 kV Transmission Line Project | 11/10/2014 | |
15-0054-EL-BNR | Juniper-Jennings & Juniper-Newburgh 138 kV Underground Reconductor Project | 01/23/2015 | |
15-0283-EL-BNR | Avon-Crestwood Q-3 138 kV Reconductor Project | 02/11/2015 | |
15-0288-EL-BNR | Avon-Beaver No1 and No2 345kV Transmission Line Extensions to Lake Avenue Substation | 03/31/2015 | |
15-1446-EL-BNR |
Duke Energy Ohio /Fields Ertel Relocation 138,000 (138
kV) Electric Transmission Line Project. | 08/18/2015 | |
15-1574-EL-BNR | West Milton Substation Expansion | 09/09/2015 | |
15-1713-EL-BNR | Chrysler-Dowling 138 kV Transmission Line Relocation for Roachton Road Roundabout | 10/19/2015 | |
15-1760-EL-BNR | Jackman-Westgate 138 kV Transmission Line Relocation Project | 10/26/2015 | |
15-1819-EL-BNR | UNITED STATES STEEL CORPORATION CUSTOMER-SPECIFIC 138-kV TRANSMISSION LINE | 10/27/2015 | |
15-1962-EL-BNR | Bluebell-Canton Central 138 kV Transmission Line Reconductor Project | 11/25/2015 | |
16-0280-EL-BNR | Inland Substation Expansion Project | 02/03/2016 | |
16-0297-EL-BNR | Avon Lake Substation Expansion Project | 02/08/2016 | |
16-0509-EL-BNR | Pidgeon-Sammis 138 kV Transmission LineTap to Guilford Mod Sub Project | 03/02/2016 | |
16-1258-EL-BNR | Flag City 138kV Transmission Line Project | 08/19/2016 | |
16-1509-EL-BNR | Philo-Canton 138kV Transmission Line Relocation Project | 06/30/2016 | |
16-1532-EL-BNR | Britton-Davidson 138kV Transmission Line Project | 09/23/2016 | |
16-1667-EL-BNR | North Proctorville Expansion Project | 08/08/2016 | |
16-1777-EL-BNR | Bolton T-Line Cut-In | 12/13/2016 | |
16-1930-EL-BNR | London-Tangy 138 kV Transmission Line Tap to National Substation Project | 09/26/2016 | |
16-2122-EL-BNR | Dublin-Davidson 138 kV Transmission Line Extension | 10/26/2016 | |
16-2211-EL-BNR | SOUTH CANTON-WEST CANTON 138KV TRANSMISSION LINE EXTENSION | 11/16/2016 | |
16-2212-EL-BNR | 138 kV Transmission Line Extensions to Holloway Substation Structure Replacement Project | 11/17/2016 | |
16-2312-EL-BNR | Delta-Wauseon 138 kV Transmission Line Structure Replacement for Gerald Grain Project
| 12/05/2016 | |
16-2393-EL-BNR | Trent-Delaware 138kV Transmission Line Extension | 12/19/2016 | |
17-0367-EL-BNR | Levis Park-Midway 138 kV Transmission Line Structure Relocation and Replacement Project | 02/16/2017 | |
17-1098-EL-BNR | Willow Island – Mill Creek 138kV Transmission Line Extension Project | 05/08/2017 | |
17-1151-EL-BNR | Emily-Fox Q-14 138 kV Transmission Line Relocation Project | 05/02/2017 | |
17-1211-EL-BNR | Glencoe Station Expansion Project Part II | 07/27/2017 | |
17-1240-EL-BNR | DP&L MIDDLEBORO METERING POINT RELOCATION PROJECT | 05/16/2017 | |
17-1288-EL-BNR | London-Tangy 138 kV Transmission Line Relocation and Tangy Substation Expansion Project | 05/25/2017 | |
17-1352-EL-BNR | East Broad Street-Kirk 138kV Transmission Line Extension Project | 09/15/2017 | |
17-1395-EL-BNR | Chamberlin-Hudson Muni East 138kV Transmission Line Structure Addition Project | 06/14/2017 | |
17-1666-EL-BNR | BEAVER-DAVIS BESSIE 345KV TRANSMISSON LINE STRUCTURE ADDITION | 07/31/2017 | |
17-1674-EL-BNR | CHRYSLER-DOWLING 138KV TRANSMISSION LINE TAP EXTENSION TO NEW FIRST SOLAR SUBSTATION PROJECT | 07/26/2017 | |
17-1783-EL-BNR | Former Burger 138 kV Transmission Lines Structure Addition Project | 08/15/2017 | |
17-1808-EL-BNR | Philo-Howard 138kV Transmission Line Project | 08/18/2017 | |
17-1904-EL-BNR | West Fremont Substation Expansion Project | 09/01/2017 | |
17-1954-EL-BNR | Brookside-Longview West 138 kV Transmission Line Temporary Bypass Project | 09/08/2017 | |
17-1997-EL-BNR | Longview-Nottingham 138 kV Transmission Line Structure Replacement Project
| 09/18/2017 | |
17-2013-EL-BNR | Juniper-Newburgh, Juniper-Jennings, and Juniper-Pleasant Valley 138 kV Transmission Lines Structure Replacement Project | 09/22/2017 | |
17-2015-EL-BNR | Harper-West Akron 138kV & West Akron-Pleasant Valley East 138kV T-Line Structure Replacement Project | 09/29/2017 | |
17-2076-EL-BNR | Buckley Road-Fostoria Central 138kV Transmission Line Extension Project | 10/13/2017 | |
17-2077-EL-BNR | Softail Switch 138kV Transmission Line Extension Project | 10/13/2017 | |
17-2312-EL-BNR | Chrysler-Dowling 138 kV Transmission Line Tap
Final Span Installation to New First Solar Substation Project | 11/07/2017 | |
17-2473-EL-BNR | Aetna (West Akron) 138kV & Babb-West Akron 138kV T-Line Structure Replacement Project | 12/14/2017 | |
18-0100-EL-BNR | Clark-Urbana 138kV Loop Eastern Connection Centerline Adjustment to Broadview Substation Project | 01/17/2018 | |
18-0202-EL-BNR | Babbitt Extension 138kV Project | 02/01/2018 | |
18-0253-EL-BNR | Poston-Lick 138 kV Transmission Line Extension Project | 02/21/2018 | |
18-0256-EL-BNR | East Lima-Marysville 345kV Transmission Line Extension Project | 02/09/2018 | |
18-0683-EL-BNR | The City of New Albany's Beech Road Duct Bank Project | 04/23/2018 | |
18-0694-EL-BNR | 138kV Hutchings to College Corner Tower Relocation Project | 04/18/2018 | |
18-0735-EL-BNR | Tangy Substation Expansion Project | 04/20/2018 | |
18-0848-EL-BNR | Sterling Station Line Extension Project | 05/09/2018 | |
18-0864-EL-BNR | Cardington-Galion 138 kV Transmission Line Raising Project | 05/22/2018 | |
18-0879-EL-BNR | North Medina-West Medina 138 kV Transmission Line Structure Replacement Project | 05/21/2018 | |
18-0926-EL-BNR | Dobbins-Toronto 138 kV Transmission Line Structure Replacement Project | 05/29/2018 | |
18-1047-EL-BNR | Seville-Star 138 kV Transmission Line Structure Replacement Project | 06/22/2018 | |
18-1059-EL-BNR | Mt. Vernon-South Kenton Structure Raise Project | 06/28/2018 | |
18-1333-EL-BNR | Southwest Lima 345kV Transmission Line Extension Project | 08/27/2018 | |
18-1386-EL-BNR | Hyatt-Genoa 138kV Structure Relocation Project | 09/07/2018 | |
18-1396-EL-BNR | Brookside-Leaside 138kV T-Line Switch Structure Addition Project | 12/24/2018 | |
18-1401-EL-BNR | Delta-Wauseon 138 kV Transmission Line Tap to Metal X Project (ATSI) | 09/14/2018 | |
18-1402-EL-BNR | Delta-Wauseon 138 kV Transmission Line Tap to Metal X Project (TE) | 09/14/2018 | |
18-1465-EL-BNR | Morse Road Station Expansion Project | 09/26/2018 | |
18-1495-EL-BNR | Duke Energy Ohio, Inc. | 10/05/2018 | |
18-1523-EL-BNR | Duke Energy Ohio, Inc. | 11/20/2018 | |
18-1534-EL-BNR | Conesville – Kirk 138 kV Transmission Line Extension Project | 10/17/2018 | |
18-1559-EL-BNR | Hyatt Station 138 kV Transmission Line Extension Project | 10/17/2018 | |
18-1571-EL-BNR | Duke Energy Ohio, Inc. Columbia Substation Project | 11/09/2018 | |
18-1572-EL-BNR | Duke Energy Ohio, Inc. Ebenezer Substation Project | 10/24/2018 | |
18-1593-EL-BNR | Duke Energy Ohio, Mill Creek Remediation Relocation | 10/24/2018 | |
18-1594-EL-BNR | Ashtabula 138kV Substation Expansion Project | 10/23/2018 | |
18-1650-EL-BNR | Morgan 1689 Separation Project | 11/01/2018 | |
18-1661-EL-BNR | 138 kV Transmission Line Relocations at Richland Substation Project | 11/13/2018 | |
18-1710-EL-BNR | Muskingum River Re-conductor Project | 11/20/2018 | |
18-1799-EL-BNR | Devola-Gorsuch 138kV Transmission Line Extension Project | 12/14/2018 | |
19-0161-EL-BNR | East Lima-Marysville 345kV Transmission Line Extension Project II | 01/22/2019 | |
19-0398-EL-BNR | Duke Energy Ohio, Inc / Blue Ash Road Project | 02/08/2019 | |
19-0448-EL-BNR | Central-East Lima Pole Installation | 03/15/2019 | |
19-0580-EL-BNR | Ashtabula Substation 138kV T-Lines Relocation | 03/12/2019 | |
19-0798-EL-BNR | West Millersport Station Expansion Project | 04/09/2019 | |
19-0799-EL-BNR | Bixby Station Expansion Project | 04/09/2019 | |
19-0802-EL-BNR | Lordstown-Sammis 345kV Loop to Wellsville Substation | 06/05/2019 | |
19-0845-EL-BNR | East Lima Station Expansion Project #2 | 04/09/2019 | |
19-0865-EL-BNR | Wagenhals-West Canton 138kV Transmission Line Project”. | 04/22/2019 | |
19-0955-EL-BNR | Bixby-Shannon 138kV Transmission Line Pole Installation Project | 04/22/2019 | |
19-0956-EL-BNR | Willow Island-Mill Creek 138kV Transmission Line Extension Project | 04/22/2019 | |
19-0960-EL-BNR | Hyatt 345kV Station Expansion Project | 04/22/2019 | |
19-0971-EL-BNR | Adjustment #2 to Heppner-Rhodes 138 KV Transmission Line Rebuild Project | 05/14/2019 | |
19-1114-EL-BNR | Duke Energy Ohio, Inc., Beckjord Structure Relocation | 05/22/2019 | |
19-1142-EL-BNR | The Dayton Power and Light Company | 06/19/2019 | |
19-1273-EL-BNR | Kirk-Jug Street 345 kV Pole Installation Project | 06/06/2019 | |
19-1277-EL-BNR | Duke Energy Ohio, Inc. | 05/31/2019 | |
19-1345-EL-BNR | Dayton Power & Light - Bath Substation Expansion | 08/16/2019 | |
19-1346-EL-BNR | Dayton Power & Light - West Milton Substation Expansion | 08/16/2019 | |
19-1347-EL-BNR | Dayton Power & Light - Miami to New Carlisle 138kV Tap | 11/01/2019 | |
19-1383-EL-BNR | North Proctorville Station Expansion Project | 06/26/2019 | |
19-1384-EL-BNR | Duke Energy Ohio, Inc/ St. Annes Avenue Towner Replacement | 06/28/2019 | |
19-1388-EL-BNR | Lallendorf-Monroe 345 kV Transmission Line Reconductor | 07/03/2019 | |
19-1423-EL-BNR | AEP Ohio Transmission, Inc. | 07/15/2019 | |
19-1453-EL-BNR | Galion-Roberts South 138kV Line Switch Replacement | 07/22/2019 | |
19-1469-EL-BNR | In the Matter of the Application of Duke Energy Ohio, Inc. for the Zimmer Substation Separation Project | 07/25/2019 | |
19-1476-EL-BNR | AEP Ohio Transmission Company, Inc. | 07/23/2019 | |
19-1551-EL-BNR | Ottawa-W Fremont #2 138 kV & Groton-W Fremont 138 kV T-Lines Structure Addition Project | 08/09/2019 | |
19-1618-EL-BNR | Evergreen-Highland #3 138kV Switch Replacement | 08/28/2019 | |
19-1636-EL-BNR | Ohio Power Company | 09/03/2019 | |
19-1775-EL-BNR | AEP Ohio Transmission Company, Inc. | 09/12/2019 | |
19-1830-EL-BNR | Fostoria-East Lima 138kV Transmission Line Prop Pole Installation Project | 10/10/2019 | |
19-1919-EL-BNR | Duke Energy Ohio, Inc. | 10/21/2019 | |
19-2011-EL-BNR | Mayfield-Eastlake Q-3 & Q-4 138 kV Transmission Lines Tap to Nathan Substation Project | 11/18/2019 | |
19-2034-EL-BNR | Buell 138 kV Extension Structure Change Project | 12/06/2019 | |
19-2134-EL-BNR | Juniper-Pleasant Valley Q1 & Q2 138kV Transmission Lines Structure Replacement Project | 12/10/2019 | |
19-2138-EL-BNR | Cloverdale-Torrey 138 kV Transmission Line Tap to Legend Mod Substation Project | 12/23/2019 | |
20-0006-EL-BNR | Devola-Gorsuch 138 kV Transmission Line Project #2 | 01/09/2020 | |
20-0008-EL-BNR | In the Matter of the Application of Duke Energy Ohio, Inc., for a Construction Notice for
the 13803 Line GLT Phase 3 Project | 01/03/2020 | |
20-0031-EL-BNR | Dayton Power and Light - Hutchings to Sugarcreek 138kV Tap | 01/21/2020 | |
20-0064-EL-BNR | In the Matter of the Duke Energy Ohio, Inc. Mitchell Ave. Pole Replacement Project | 01/16/2020 | |
20-0135-EL-BNR | Ottawa-West Fremont 138 kV Switch Replacement Project | 08/04/2020 | |
20-0262-EL-BNR | Pierce Substation Expansion Project | 02/07/2020 | |
20-0347-EL-BNR | In the Matter of the Application of Duke Energy Ohio, Inc.- Maineville | 08/13/2020 | |
20-0365-EL-BNR | Shawtown Switch-Hancock Wood Co-Op 138 kV Transmission Line Project | 02/18/2020 | |
20-0377-EL-BNR | Vine-City of Columbus West 138 kV Pole Replacement Project | 03/03/2020 | |
20-0598-EL-BNR | Crissinger-Tangy 138 kV Transmission Line Switch Replacement Project | 03/25/2020 | |
20-0614-EL-BNR | Hillcrest Solar I, LLC | 03/18/2020 | |
20-0668-EL-BNR | Beatty Station Expansion Project | 04/15/2020 | |
20-0709-EL-BNR | Conesville Transmission Station Expansion Project
| 04/06/2020 | |
20-0710-EL-BNR | East Lima-Maddox Creek 345 kV Transmission Line Project | 04/06/2020 | |
20-0787-EL-BNR | Kammer-Dumont 765 kV Transmission Line Cut In | 05/28/2020 | |
20-0845-EL-BNR | Dayton Power and Light - Millcreek 138kV Extension | 04/20/2020 | |
20-0938-EL-BNR | In the Matter of the Duke Energy Ohio, Inc. Hillcrest Solar Project | 04/27/2020 | |
20-0955-EL-BNR | Philo-Torrey 138kV Transmission Line | 05/06/2020 | |
20-1075-EL-BNR | Juniper-Jennings 138 kV Q-15 and Juniper-Newburgh 138 kV Q-18 Transmission Lines Structure Addition Project | 06/15/2020 | |
20-1136-EL-BNR | Bell Ridge 138kV Switch Project | 06/18/2020 | |
20-1142-EL-BNR | Morse Road - Genoa 138 kV Line (Structures 1-4) | 07/16/2020 | |
20-1183-EL-BNR | Hyatt - Genoa 138 kV Line (Structures 71-72) | 07/02/2020 | |
20-1275-EL-BNR | Construction Notice for the Waverly-Lick 138kV Pole Replacement | 07/15/2020 | |
20-1351-EL-BNR | City of Hamilton, Substation 5, New Pole Placement | 08/04/2020 | |
20-1353-EL-BNR | Apple Valley 138 kV Switch Project | 08/17/2020 | |
20-1373-EL-BNR | Levis Park-Midway 138 kV Transmission Line Switch Replacement Project | 08/17/2020 | |
20-1414-EL-BNR | Harrison Station Expansion Project | 09/03/2020 | |
20-1436-EL-BNR | Defiance SW (Richland) 138 kV Transmission Line Relocation Project | 08/27/2020 | |
20-1449-EL-BNR | Marysville – Peoria 345kV Transmission Line Project | 09/29/2020 | |
20-1457-EL-BNR | Dixie Substation Expansion Project | 09/09/2020 | |
20-1473-EL-BNR | Wakatomika 138kV Switch Project | 09/15/2020 | |
20-1474-EL-BNR | Licking Co-Op Extension – Bladensburg 138kV Transmission Line Project | 09/15/2020 | |
20-1487-EL-BNR | In the Matter of the Application of Duke Energy Ohio, Inc. | 09/17/2020 | |
20-1516-EL-BNR | Hannibal-Ormet North 138 kV Transmission Line Project | 10/01/2020 | |
20-1551-EL-BNR | Clark-East Springfield 138 kV Transmission Line Switch Replacement Project | 09/29/2020 | |
20-1555-EL-BNR | Babb-Evans 138 kV Transmission Line Loop to Aetna Substation Project | 09/25/2020 | |
20-1600-EL-BNR | Defiance SW (Richland) 138 kV Transmission Line Switch Replacement Project | 10/15/2020 | |
20-1608-EL-BNR | Sporn-Kyger Creek 345 kV Pole Installation Project | 10/30/2020 | |
20-1609-EL-BNR | Bethel-Sawmill 138 kV Pole Installation Project | 10/30/2020 | |
20-1611-EL-BNR | In the Matter of the Duke Energy Ohio, Inc, 2381 GLT project | 11/06/2020 | |
20-1647-EL-BNR | Juniper-Newburgh/Juniper-Jennings & Juniper-Pleasant Valley Q1 & Q2 138 kV Transmission Line Structure Replacement Project | 10/29/2020 | |
20-1654-EL-BNR | Angola-Midway 138 kV Transmission Line Relocation Project | 11/02/2020 | |
20-1663-EL-BNR | Lockbourne – South Central Power 138 kV Bus Tie Project | 11/16/2020 | |
20-1710-EL-BNR | Chamberlin Substation 138kV Strain Bus Structure Addition Project | 11/23/2020 | |
20-1741-EL-BNR | In the Matter of the Construction Notice Application for the Angelina Solar I, LLC Transmission Interconnect | 11/25/2020 | |
20-1747-EL-BNR | Harper-West Akron 138 kV Transmission Line Switch Replacement Project | 12/09/2020 | |
21-0151-EL-BNR | Dayton Power and Light - Sugarcreek 138kV Reactor Expansion
| 03/08/2021 | |
21-0179-EL-BNR | Anguin Extension No. 4 138 kV Transmission Line | 03/01/2021 | |
21-0194-EL-BNR | BELLARD SUBSTATION PROJECT | 03/04/2021 | |
21-0250-EL-BNR | Duke Energy Ohio, Inc. Miami Fort Generation Separation | 04/16/2021 | |
21-0251-EL-BNR | Duke Energy Ohio, Inc. 1782 GLT Project | 04/09/2021 | |
21-0266-EL-BNR | Harmar Hill 138 kV Switch Install | 04/26/2021 | |
21-0348-EL-BNR | Duke Energy Ohio, Inc. Half Acre Substation | 04/07/2021 | |
21-0489-EL-BNR | Davidson-Dublin 138 kV Underground Relocation Project | 05/27/2021 | |
21-0591-EL-BNR | WAVERLY-LICK 138-kV TRANSMISSION LINE RELOCATION AND LICK STATION EXPANSION | 05/19/2021 | |
21-0606-EL-BNR | Solida 138 kV Switch Project | 06/22/2021 | |
21-0613-EL-BNR | Buckeye Co-Op Extension-Fayette 138 kV Line Rebuild Project | 06/22/2021 | |
21-0678-EL-BNR | Salerno 138 kV Line Extension Project | 06/09/2021 | |
21-0731-EL-BNR | Duke Energy Ohio, Inc. / 5781 Emergent. | 07/16/2021 | |
21-0795-EL-BNR | In the Matter of Duke Energy Ohio, Inc. 5781 GLT Project | 07/30/2021 | |
21-0819-EL-BNR | Adjustment to Viking 138kV Switch Project | 07/26/2021 | |
21-0893-EL-BNR | Southwest Lima-West Moulton and St Mary’s-West Moulton 138 kV Transmission Line Adjustment Project | 10/01/2021 | |
21-0899-EL-BNR | Fostoria Central Station Expansion | 09/01/2021 | |
21-0927-EL-BNR | Duke Energy Ohio, Inc. Stuart Substation Expansion Project. | 09/17/2021 | |
21-0974-EL-BNR | West Lancaster-Bixby 138 kV Extension | 09/21/2021 | |
21-0975-EL-BNR | Sifford-Ruble 138 kV Tie Lines Project | 09/21/2021 | |
21-0976-EL-BNR | Philo-Howard 138 kV Mid-Span Structure Project | 09/21/2021 | |
21-0979-EL-BNR | Fostoria – East Lima 138 kV Transmission Line Tie-Ins to North Woodcock Station Project | 09/21/2021 | |
21-0985-EL-BNR | Duke Energy Ohio, Inc. | 11/05/2021 | |
21-1033-EL-BNR | Duke Energy Ohio, Inc. | 10/26/2021 | |
21-1043-EL-BNR | Willowbrook Solar I, LLC 138kV Overhead Transmission Gen-Tie Line | 10/08/2021 | |
21-1057-EL-BNR | Hartman Farms 138 kV Extension No. 5 and No. 6 Project | 10/27/2021 | |
21-1085-EL-BNR | Heppner-Lick 138 kV Transmission Line Adjustment Project | 11/22/2021 | |
21-1086-EL-BNR | Linworth 138 kV Extension Relocation Project | 11/05/2021 | |
21-1111-EL-BNR | Biers Run – Circleville 138kV Line Cut-In Project | 12/14/2021 | |
21-1113-EL-BNR | Cannelsville-Guernsey-Muskingum Co-Op 138 kV Transmission Line Rebuild Project | 11/22/2021 | |
21-1168-EL-BNR | Cartwright 138 kV Switch Project | 11/29/2021 | |
21-1170-EL-BNR | Buckeye Co-Op Extension-Addison 138 kV Transmission Line Rebuild Project | 12/10/2021 | |
21-1178-EL-BNR | Greenfield-Lakeview 138 kV Transmission Line Reconductor and Rebuild Project | 12/03/2021 | |
21-1227-EL-BNR | Allen Junction-Westgate 138 kV Transmission Line Relocation Project | 12/08/2021 | |
22-0011-EL-BNR | Duke Energy Ohio, Inc | 01/10/2022 | |
22-0012-EL-BNR | Duke Energy Ohio, Inc | 01/10/2022 | |
22-0039-EL-BNR | Angola-Midway 138 kV Transmission Line Relocation at Monclova Road Project | 02/22/2022 | |
22-0090-EL-BNR | Beatty-Canal Street 138 kV Cut-In Project | 02/11/2022 | |
22-0153-EL-BNR | Sifford-Ruble 138 kV Tie Lines Project | 03/02/2022 | |
22-0155-EL-BNR | West Lancaster-Bixby 138 kV Extension | 03/02/2022 | |
22-0173-EL-BNR | Blendon Extension 138 kV Pole Replacement Project | 03/04/2022 | |
22-0175-EL-BNR | West Moulton-Amsterdam 138 kV Transmission Line Project | 03/29/2022 | |
22-0403-EL-BNR | Buckeye Co-Op Extension-Fayette 138 kV Pole Installation Project | 05/13/2022 | |
22-0445-EL-BNR | Duke Energy Ohio, Inc. | 04/22/2022 | |
22-0451-EL-BNR | Duke Energy Ohio, Inc. | 05/05/2022 | |
22-0468-EL-BNR | Duke Energy Ohio, Inc. | 05/06/2022 | |
22-0512-EL-BNR | Cyprus 138 kV Extension Adjustment Project | 05/11/2022 | |
22-0515-EL-BNR | Duke Energy Ohio, Inc. | 07/22/2022 | |
22-0553-EL-BNR | Duke Energy Ohio, Inc. | 07/15/2022 | |
22-0563-EL-BNR | Canton Central Station Expansion and Line Adjustment Project | 06/28/2022 | |
22-0564-EL-BNR | Lima – Fort Wayne 138 kV Transmission Tie-Lines into Gomer Station Project | 06/02/2022 | |
22-0567-EL-BNR | Marion Road-Mound Street 138 kV Transmission Line Underground Project – East Fulton Street Adjustment | 06/03/2022 | |
22-0574-EL-BNR | East Amsterdam-Carroll Co-Op 138 kV Line | 08/08/2022 | |
22-0577-EL-BNR | Delano Station Expansion | 07/21/2022 | |
22-0579-EL-BNR | Delano-Salt City Solar 138 kV Line Project | 06/21/2022 | |
22-0641-EL-BNR | Nottingham-Nottingham Solar 138 kV | 09/21/2022 | |
22-0648-EL-BNR | Anguin Extension No.4 Transmission Line Project | 07/11/2022 | |
22-0677-EL-BNR | Broadview-Clark 138 kV Transmission Line Structure Replacement Project
| 07/12/2022 | |
22-0725-EL-BNR | Fairfield 43 T-Pole Replacement | 09/08/2022 | |
22-0727-EL-BNR | Finneytown 44 T-Pole Relocation | 09/09/2022 | |
22-0746-EL-BNR | Duke Energy Ohio, Inc. | 08/08/2022 | |
22-0779-EL-BNR | East Lima 345kV Transmission Line Cut-In Project | 08/17/2022 | |
22-0801-EL-BNR | Duke Energy Ohio, Inc. | 09/02/2022 | |
22-0831-EL-BNR | Duke Energy Ohio, Inc. | 09/02/2022 | |
22-0832-EL-BNR | Polaris – Westar 138kV Line Upgrades | 09/09/2022 | |
22-0943-EL-BNR | In the Matter of Duke Energy Ohio, Inc. | 10/13/2022 | |
22-0954-EL-BNR | Beatty – Greene IPP 345kV Cut-in Project | 10/24/2022 | |
22-1009-EL-BNR | Biers Run – Circleville 138kV Cut-in (Westfall Station) Project | 11/01/2022 | |
22-1027-EL-BNR | Ohio Central-Fostoria 345 kV Transmission Line Adjustment Project | 11/04/2022 | |
22-1028-EL-BNR | Howard – Fostoria 138 kV Mid-Span Structure Project | 11/04/2022 | |
22-1086-EL-BNR | South Coshocton – Wooster 138 kV Transmission Line Cut-Ins and Salt Creek Switch Project | 12/08/2022 | |
22-1125-EL-BNR | East Akron-Evans 138 kV Transmission Line Switches Installation Project | 12/06/2022 | |
22-1134-EL-BNR | Fostoria-East Lima 138 kV Hard Tap Project | 12/08/2022 | |
23-0011-EL-BNR | Beatty-Canal Street 138 kV Transmission Line Re-Termination (White Road) Project | 01/31/2023 | |
23-0012-EL-BNR | Flatlick 765 kV Station Expansion Project | 01/18/2023 | |
23-0016-EL-BNR | Duke Energy Ohio, Inc. | 01/13/2023 | |
23-0017-EL-BNR | Broadview-Tangy 138 KV Transmission Line Loop to Finley Substation | 03/15/2023 | |
23-0030-EL-BNR | Westfall – South Central Power 138kV Tie Line Project | 01/12/2023 | |
23-0042-EL-BNR | Ohio Power Company - Adkins Station Expansion Project | 03/09/2023 | |
23-0064-EL-BNR | Harding-Jennings 138 kV Transmission Line Structure Replacement | 01/27/2023 | |
23-0076-EL-BNR | Conesville - Slate 138 kV Transmission Line Project | 01/24/2023 | |
23-0094-EL-BNR | Duke Energy Ohio, Inc. | 02/10/2023 | |
23-0099-EL-BNR | Marysville-Cadence Solar 345 kV Transmission Line | 11/06/2023 | |
23-0122-EL-BNR | Fiddlestix Switch & Poston Ross 138-kV Cut-In Project | 02/13/2023 | |
23-0153-EL-BNR | Kileville-Shire 138 kV Tie Lines Project | 03/03/2023 | |
23-0167-EL-BNR | North Intertie Station Expansion Project | 03/06/2023 | |
23-0188-EL-BNR | Duke Energy Ohio, Inc. | 04/27/2023 | |
23-0203-EL-BNR | Longview-Ontario 138 kV Transmission Line Switch Replacement Project | 03/17/2023 | |
23-0306-EL-BNR | OPSB Dimmick Substation | 08/15/2023 | |
23-0308-EL-BNR | OPSB Columbia and Davis Road Roundabout Relocation | 06/30/2023 | |
23-0343-EL-BNR | Anguin 138 kV Extension No. 1 Transmission Line Project | 04/12/2023 | |
23-0483-EL-BNR | Highland-Magellan No. 1 138 kV Structure Relocation Project | 05/16/2023 | |
23-0538-EL-BNR | Kammer – Dumont 765kV Transmission Line Raise | 05/31/2023 | |
23-0558-EL-BNR | F7481 Phase 2 | 06/15/2023 | |
23-0564-EL-BNR | Hillsboro-Millbrook Park 138 kV Line Adjustment 2 Project | 05/19/2023 | |
23-0569-EL-BNR | Hedding Road-Morrow Co-op 138 kV Transmission Line Relocation Project | 06/01/2023 | |
23-0576-EL-BNR | South Point – Portsmouth 138-kV Transmission Line Tie-in Project | 05/23/2023 | |
23-0584-EL-BNR | Spickard-Dodson Creek Solar 138 kV Generation Tie Line Project | 07/20/2023 | |
23-0611-EL-BNR | Sidney-Franklin 138kV Transmission Line Adjustment Project- AES Ohio | 06/09/2023 | |
23-0632-EL-BNR | Anguin - Babbitt 138 kV Transmission Line Adjustment Project | 06/08/2023 | |
23-0646-EL-BNR | Buckeye Co-Op Extension Fayette 138kV Pole Installation Adjustment Project | 06/07/2023 | |
23-0694-EL-BNR | Speidel-Barnesville 138 kV Cut-in to Pumpkin Station Project | 06/28/2023 | |
23-0705-EL-BNR | Hartman Farms 138 kV Extension No. 6 Transmission Line Project (Phase 2) | 06/29/2023 | |
23-0785-EL-BNR | Beaver-Black River 138 kV Transmission Line Tap to Serve AMPT Project | 08/22/2023 | |
23-0795-EL-BNR | Cosgray-Rivendell No. 1 and No. 2 345 kV Tie Lines Project | 08/01/2023 | |
23-0812-EL-BNR | Brookside-Henrietta 138 kV Transmission Line Switch Replacement Project | 08/14/2023 | |
23-0829-EL-BNR | Broadview – Tangy 138 kV Transmission Line Switch Replacement Project | 09/07/2023 | |
23-0851-EL-BNR | E. Broad St. – Bexley 138 kV Transmission Line Cut-In Project | 09/19/2023 | |
23-0852-EL-BNR | Jug Street – Corridor 345 kV Transmission Line Cut-in to Badger Station Project | 09/13/2023 | |
23-0872-EL-BNR | ATSI’s Sammis Star 345kV Transmission Line and Sammis Wellsville 345kV Transmission Line Structure Replacement Project | 10/04/2023 | |
23-0886-EL-BNR | Chrysler-Maclean 138 kV Transmission Line Tap to First Solar PGT-4 Substation Project. | 10/23/2023 | |
23-0919-EL-BNR | Harrison Extension 138 kV Pole Replacement Project | 10/05/2023 | |
23-0920-EL-BNR | Three Creeks 138 kV Switch Bypass Pole Project | 10/02/2023 | |
23-0937-EL-BNR | Anguin 138 kV Extension No. 1 (Phase 2) Transmission Line Project | 10/13/2023 | |
23-0951-EL-BNR | American Transmission Systems, Incorporated London-Tangy 138 kV Transmission Line Tap Project | 11/06/2023 | |
23-0952-EL-BNR | American Transmission Systems, Incorporated London-Tangy 138 kV Transmission Line Tap Project | 12/01/2023 | |
23-0961-EL-BNR | Conesville-Corridor 345 kV Cut-in and Innovation-Mordor 138 kV Tie Lines #1 & #2 Project | 10/20/2023 | |
23-0965-EL-BNR | Lemoyne-Midway 138 kV Tranmission Line Structure Addition Project | 11/02/2023 | |
23-0970-EL-BNR | Kileville-Shire No. 3 and No. 4 138 kV Tie Lines Project | 10/20/2023 | |
23-0986-EL-BNR | Elk - Vinton 138kV Extension Project | 12/06/2023 | |
23-1021-EL-BNR | West Van Wert – Delphos Center 138kV Line Adjustment Project | 11/15/2023 | |
23-1046-EL-BNR | Bixby-Marion Road 138 kV Prop Pole Project | 11/17/2023 | |
23-1053-EL-BNR | Mount Perry 138 kV Extension Project | 12/06/2023 | |
23-1054-EL-BNR | Mount Perry 138 kV Switch Project | 12/06/2023 | |
23-1133-EL-BNR | Anguin 138 kV Extension No. 5 Transmission Line Project | 12/13/2023 | |
24-0034-EL-BNR | Beatty – Canal Street 138 kV (Beatty Road – White Road) Pole Installation Project | 01/18/2024 | |
24-0066-EL-BNR | Jerome-Rohan 138 kV Tie Lines Project | 02/05/2024 | |
24-0079-EL-BNR | Chamberlain-West Akron 138 kV Transmission Line Switch Replacement Project | 02/27/2024 | |
24-0082-EL-BNR | Melmore-Tiffin Center 138 kV Transmission Line Replacement Project | 02/07/2024 | |
24-0091-EL-BNR | Corridor-Morse 138 kV Pole Installation Project | 02/07/2024 | |
24-0131-EL-BNR | Morse - Clinton 138 kV Pole Installation Project | 02/20/2024 | |
24-0152-EL-BNR | Brie - Voltron 138 kV Transmission Line Project | 02/23/2024 | |
24-0173-EL-BNR | Newcomerstown – South Coshocton 138 kV Transmission Line Structure Adjustment Project | 03/08/2024 | |
24-0229-EL-BNR | In the Matter of the Construction Notification Report for American Transmission Systems, Incorporated's Delta-Wauseon 138 kV Transmission Line Switch | 04/26/2024 | |
24-0283-EL-BNR | In the Matter of the Construction Notification Report by American Transmission Systems, Incorporated for the Fostoria Central-Lallendorf 345 kV Transm | 06/07/2024 | |
24-0302-EL-BNR | In the Matter of the Construction Notification Report of American Transmission Services, Incorporated for the Longview-Nottingham 138 kV Transmission | 05/14/2024 | |
24-0334-EL-BNR | Lammer-Powell Creek Solar 138 kV Transmission Line and East Leipsic-Richland 138 kV Cut-in Project | 04/08/2024 | |
24-0433-EL-BNR | South Coshocton – Wooster 138 kV Transmission Line Rebuild Project Phase 1 | 04/16/2024 | |
24-0439-EL-BNR | Beatty – Bixby 345 kV Cut-In Project | 05/02/2024 | |
24-0440-EL-BNR | In the Matter of the Construction Notification Report for American Transmission Systems, Incorporated's Hannah-Highland 345 kV Transmission Line Loop | 05/13/2024 | |
24-0441-EL-BNR | Macy Extension 138 kV Adjustment and Macy-Justice 138 kV Tie Lines #1 and #2 Project | 04/24/2024 | |
24-0510-EL-BNR | Bixby-Buckeye Steel 138 kV Structure Replacement Project | 05/17/2024 | |
24-0512-EL-BNR | Tidd-Sunnyside 138 kV Transmission Line Adjustment Project | 05/10/2024 | |
24-0547-EL-BNR | Innovation-Brie 138 kV Transmission Line Project | 05/21/2024 | |
24-0548-EL-BNR | Hartman Farms 138 kV Extension No. 3 & No. 4 Transmission Line Project | 06/03/2024 | |
24-0599-EL-BNR | Miami Fort to Hebron Transmission Line Rebuild | 06/20/2024 | |
24-0670-EL-BNR | Horizon 138 kV Transmission Line Extension Project | 07/03/2024 | |
24-0676-EL-BNR | Hillsboro - Millwood Park 138 kV Transmission Line Cut-In (south Lucasville Station) Rebuild Project | 07/18/2024 | |
24-0688-EL-BNR | Philo-Crooksville and Philo-Rutland 138 kV Structure Addition Project | 07/03/2024 | |
24-0706-EL-BNR | Ebersole – Fostoria Central #2 138 kV Cut-In and Rocky Ford – Border Basin 138 kV Tie Line Project | 09/03/2024 | |
24-0711-EL-BNR | West Mount Vernon – North Waldo 138kV Transmission Line Relocation (Fulton Station) Project | 07/10/2024 | |
24-0796-EL-BNR | Ohio Power Company - Hillsboro-Millbrook Park 138 kV Transmission Line Cut-In (South Lucasville Station) Rebuild Project | 08/12/2024 | |
24-0797-EL-BNR | Ohio Power Company - Badger-Gondor 138 kV Transmission Tie-Lines Project | 08/12/2024 | |
24-2381-EL-BNR | In the Matter of the Construction Notification Report of American Transmission Systems, Incorporated for the Brookside-Henrietta 138 kV Transmission L | 05/17/2024 | |
24-2384-EL-BNR | Sifford-Ruble 2A 138 kV Transmission Tie-Lines Project | 04/10/2024 | |