Summary: |
Entry ordered that the Stipulation filed by the parties is approved and adopted; that a certificate be issued to CSP for the construction, operation, maintenance of the project as proposed along the preferred route; that the certificate contain the 29 conditions set forth in Section V. of this Opinion, Order, and Certificate. (OPSB) |
|