Date Filed | Summary | Pages |
01/19/2001 | Memo closing this case of record. | 2 |
12/22/1995 | ICN #0005 Letter stating that construction on this project was completed on November 21, 1995, filed on behalf of applicant by J. Schrader. (1 pg.) | 1 |
06/14/1995 | ICN #0004 Letter stating that the construction on this project is planned to start on June 12, 1995, filed on behalf of applicant by J. Schrader. (2 pgs.) | 0 |
01/13/1995 | ICN #0003 Response to Letter of Notification, filed by K. Wissman, OPSB staff. (1 pg.) | 0 |
01/12/1995 | ICN #0002 Investigation report approving the Letter of Notification, filed by F. Heizer, OPSB staff. (1 pg.) | 0 |
12/14/1994 | ICN #0001 In the matter of the Letter of Notification of Columbus Southern Power Company for the installation of a 138 kv underground transmission line along Stelzer Road to replace the existing 138 kv overhead transmission line. (163 pgs.) | 0 |