Date Filed | Summary | Pages |
10/16/2000 | ICN #0002 Entry ordering that the listed certificates of environmental compatibility and public need previously granted to OE, TE, and CEI for the construction and opera- tion of numerous electric transmission facilities (and associated transmission facilities) shall be transferred to ATSI; that, as a result of these transfers, ATSI shall be bound by and comply with all terms and conditions of these certificates. | 13 |
10/16/2000 |
ICN #0002 Entry ordering that the listed certificates of environmental compatibility and public need previously granted to OE, TE, and CEI for the construction and opera- tion of numerous electric transmission facilities (and associated transmission facilities) shall be transferred to ATSI; that, as a result of these transfers, ATSI shall be bound by and comply with all terms and conditions of these certificates
| 7 |
10/16/2000 | ICN #0045 Entry ordering that the listed certificates of environmental compatibility and public need previously granted to OE, TE, and CEI and the construction and opera- tion of numerous electric transmission facilities (and associated transmission facilities) shall be transferred to ATSI; that, as a result of these transfers, ATSI shall be bound by and comply with all terms and conditions of these certificates. (6 pgs.) | 6 |
12/16/1996 | Letter stating the completed date of project filed on behalf of applicant by G. L. Cunningham. (1 pg.) | 1 |
06/04/1996 | ICN #0043 Letter to Mr. T. C. Burgess stating that the engineering drawings submitted on May 13, 1996, have been reviewed by the staff and construction of the portion of the project depicted by the drawing may be started, filed on behalf of the PUCO staff by K. Wissman. (1 pg.) | 1 |
05/30/1996 | ICN #0042 Revised Sheet 6 of Plan and Profile drawing TZ-374-F of the Kirby-Tangy portion of the Crissinger- Tangy 138 kV project, filed on behalf of applicant by T. Burgess. (2 pgs.) | 2 |
05/30/1996 | ICN #0220 Revised Sheet 6 of Plan and Profile drawing TZ-374-F of the Kirby-Tangy portion of the Crissinger- Tangy 138 kV project, filed on behalf of applicant by T. Burgess. (2 pgs.) | 2 |
04/18/1996 | ICN #0041 Letter to Mr. T. C. Burgess, Ohio Edison, stating that they may proceed with construction of the portion of the project depicted by the drawing submitted on March 22, 1996, filed by K. Wissman, PUCO staff. (1 pg.) | 1 |
04/18/1996 | ICN #0040 Revised Sheet 8 of Plan & Profile drawing TZ-374-F of the Kirby-Tangy portion of the Crissinger- Tangy 138 kV project, filed on behalf of applicant by T. Burgess. (1 pg.) | 1 |
03/26/1996 | Final archaeological survey report filed on behalf of applicant by T. C. Burgess. (6 pgs.) | 6 |
01/26/1996 | ICN #0038 Letter to Mr. T. C. Burgess approving the drawings submitted on January 3, 1996, filed by K. Wissman, PUCO staff. (1 pg.) | 1 |
01/25/1996 | ICN #0037 Plan and profile drawings TZ-376-F, Sheets 1 & 2, filed on behalf of applicant by T. Burgess. (2 pgs.) | 2 |
01/04/1996 | Letter stating that the portion of the project depicted by the drawings may proceed with construction filed by K. Wissman, PUCO staff. (1 pg.) | 1 |
01/04/1996 | Revised sheets 3, Rev. C and 4, Rev. B of plan and profile drawing TZ-374-F of the Kirby-Tangy portion, and revised sheets 3, Rev. A;4, Rev. A; and 5, Rev. A of the Kirby- Roberts portion of the Crissinger-Tangy 138 kV project filed on behalf of applicant by T. C. Burgess. (7 pgs.) | 2 |
01/04/1996 | Highway crossing permit for S.R. 257 with new expiration date filed on behalf of applicant by T. C. Burgess. (3 pgs) | 3 |