Date Filed | Summary | Pages |
05/28/1999 | Ameritech Tariff PUCO No. 20 filed. Submitted by: S. Drombetta. (3 pgs.) | 3 |
05/03/1999 | Revised tariff, PUCO No. 3, 2nd page 28, filed on behalf of respondent, Cincinnati Bell, by E. King. (2 pgs.) | 2 |
01/07/1999 | Revised tariff, PUCO No. 6, Check List, 380th sheet 1; Section 2.3, 4th sheet 7, filed on behalf of respondent, GTE North, by J. Kennedy. (3 pgs.) | 3 |
12/23/1998 | Revised tariff, PUCO No. 3, Section 1, 2nd page 8; Section 3, 1st page 28, filed on behalf of respondent, Cincininati Bell, by E. King. (3 pgs.) | 3 |
11/19/1998 | Letter stating that the in-service date for the institution of two-way measured-rate EAS (ELCP) between GTE's Oxford exchange and the Cincinnati Bell's exchange of Seven Mile, originally scheduled for November 30, 1998, has been changed to February 1, 1999, filed on behalf of respondent, GTE North, by J. Kennedy. (1 pg.) | 1 |
10/14/1998 | Notice of substitution of counsel filed on behalf of United Telephone Company of Ohio dba Sprint by J. Stewart. (3 pgs.) | 3 |
10/08/1998 | Letter stating that the in-service date for two-way flat- rate EAS between the Ameritech Ohio's Middletown and Tren- ton exchanges and CBT's Seven Mile exchange is June 3, 1999, filed on behalf of respondent, Cincinnati Bell, by E. King. (1 pg.) | 1 |
09/28/1998 | Notification of change in the implementation date from 11/30/98 to 2/1/99 filed by the company. (2 pgs) | 2 |
09/25/1998 | Information reponse filed by C. Rawlings on behalf of Amer- itech. (2 pgs) | 2 |
09/18/1998 | Information response filed on behalf of respondent, Ameri- tech Ohio, by C. Rawlings. (2 pgs.) | 2 |
06/26/1998 | Supplemental information response filed by C. Rawlings on behalf of Ameritech. (9 pgs) | 9 |
06/02/1998 | Letter stating that the in-service date for two-way, measured-rate EAS between the GTE North's Oxford exchange and CBT's Seven Mile exchange is November 30, 1998, filed on behalf of respondent, Cincinnati Bell, by E. King. (1 pg.) (FILED 6/1/98) | 1 |
05/27/1998 | Supplemental information response of Ameritech Ohio filed by C. Rawlings. (37 pgs) | 37 |
05/21/1998 | Letter stating that the in-service date for the institution of two-way measured-rate EAS (ELCP) between GTE's Oxford exchange and the Cincinnati Bell's exchange of Seven Mile is November 30, 1998, filed on behalf of GTE North by J. Kennedy. (1 pg.) | 1 |
04/09/1998 | Finding & Order that both the GTE stipulation and the Ameri- tech stipulation are hereby approved in their entirety; that CBT and GTE institute two-way, measured-rate EAS between the Seven Mile and Oxford exchanges as soon as practicable, and, in any event, within 12 months from the date of this order; that CBT and Ameritech should institute two-way, nonoptional, flat-rate EAS between the Seven Mile exchange and each of Ameritech's Middletown and Trenton exchanges. (14 pgs.) | 14 |
|