Date Filed | Summary | Pages |
09/18/2006 | Correspondence stating that the project was completed on June 27, 2006 and was put in operation June 27, 2006 filed on behalf of Columbia Gas of Ohio by G. Estep. | 1 |
08/08/2005 | Storm water pollution prevention plan, tree clearing and stream crossing plan and the construction drawings for the project have been reviewed and accepted by staff filed by PUCO staff.
| 1 |
08/04/2005 | Service Notice | 2 |
08/03/2005 | Opinion and order and certificate, ordering that the stipulation filed July 7, 2005 and the supplemental joint stipulation filed on August 2, 2005, in this matter are approved and adopted; that a certificate be issued to Columbia Gas of Ohio, Inc. for the construction, operation and maintenance of the project as proposed along the preferred route as modified; that the certificate contain the applicable conditions set forth in section IV of this Opinion, Order, and certificate. | 26 |
08/02/2005 | Easement agreement with addendum between Columbia Gas Company of Ohio and The Board of Trustees of Liberty Township, Ohio effective July 28, 2005 filed by M. Groomes, Columbia Gas and R.E. Cape, Board of Trustees of Liberty Township, Ohio. | 15 |
08/02/2005 | Supplemental joint stipulation between staff and applicant Columbia Gas of Ohio, Inc. filed by staff of the Ohio Power Siting Board. | 8 |
07/29/2005 | Staff investigation report and recommendation filed by PUCO staff. | 6 |
07/28/2005 | Revised construction plans and drawings filed by C. Schraff on behalf of Columbia Gas of Ohio, Inc. | 2 |
07/25/2005 | Construction plans and drawings as referenced in Condition Nos. 19, 20, 26 and 30 of the Joint Stipulation and Recommended Findings of Fact and Conclusions of Law filed with Board on July 7, 2005, filed on behalf of Columbia Gas of Ohio, Inc. by C. Schraff. | 5 |
07/15/2005 | With respect to recommend Condition 30 of the joint stipulation, this is to advise that applicant has elected to cross the portion of the preferred route in the vicinity of Stream Crossings 15 A, 15B, and 15C utilizing horizontal directional drilling (HDD). Easements are not available from those property owners along the existing electrical easement right-of-way, which would be necessary to relocate the center-line of the gas pipeline to the overhead electrical line right-of-way filed on behalf of Columbia Gas of Ohio by C. Schraff. | 2 |
07/15/2005 | Easements for construction of the North Columbus Loop gas pipeline loop along the east side of Liberty Road filed on behalf of Columbia Gas of Ohio by C. Schraff. | 5 |
07/11/2005 |
Proof of Publication (Franklin Co., Delaware Co) | 8 |
07/07/2005 | Joint stipulation and recommended findings of fact and conclusions of law filed on behalf of the Ohio Power Siting Board by S. Beeler, PUCO; M. Malone, Attorney General's office; C. Schraff and S. Sagun, Columbia Gas. | 19 |
07/06/2005 | Additional statements for the record to supplement the oral testimony presented under oath on June 20, 2005, as agreed to by the hearing examiner and the Applicant, filed on behalf of Alum Creek by M. Samuels, FACT Board Member. | 2 |
07/06/2005 | Transcript w/exhibits of hearing before Steven D. Lesser and Gregory A. Price, Hearing Examiners, at the PUCO, 180 E. Broad St., Columbus, Ohio, Room 11F, on June 21, 2005. (concluded) | 139 |