DIS - Case Record for 04-1620-GA-BTX Skip to main content
      
      
CASE NUMBER: 04-1620-GA-BTX
CASE DESCRIPTION: COLUMBIA GAS OF OHIO, INC.
DOCUMENT SIGNED ON: 8/16/2024
DATE OF SERVICE: ________________________________________
09/18/2006 Correspondence stating that the project was completed on June 27, 2006 and was put in operation June 27, 2006 filed on behalf of Columbia Gas of Ohio by G. Estep.
08/08/2005 Storm water pollution prevention plan, tree clearing and stream crossing plan and the construction drawings for the project have been reviewed and accepted by staff filed by PUCO staff.
08/04/2005 Service Notice
08/03/2005 Opinion and order and certificate, ordering that the stipulation filed July 7, 2005 and the supplemental joint stipulation filed on August 2, 2005, in this matter are approved and adopted; that a certificate be issued to Columbia Gas of Ohio, Inc. for the construction, operation and maintenance of the project as proposed along the preferred route as modified; that the certificate contain the applicable conditions set forth in section IV of this Opinion, Order, and certificate.
08/02/2005 Easement agreement with addendum between Columbia Gas Company of Ohio and The Board of Trustees of Liberty Township, Ohio effective July 28, 2005 filed by M. Groomes, Columbia Gas and R.E. Cape, Board of Trustees of Liberty Township, Ohio.
08/02/2005 Supplemental joint stipulation between staff and applicant Columbia Gas of Ohio, Inc. filed by staff of the Ohio Power Siting Board.
07/29/2005 Staff investigation report and recommendation filed by PUCO staff.
07/28/2005 Revised construction plans and drawings filed by C. Schraff on behalf of Columbia Gas of Ohio, Inc.
07/25/2005 Construction plans and drawings as referenced in Condition Nos. 19, 20, 26 and 30 of the Joint Stipulation and Recommended Findings of Fact and Conclusions of Law filed with Board on July 7, 2005, filed on behalf of Columbia Gas of Ohio, Inc. by C. Schraff.
07/15/2005 With respect to recommend Condition 30 of the joint stipulation, this is to advise that applicant has elected to cross the portion of the preferred route in the vicinity of Stream Crossings 15 A, 15B, and 15C utilizing horizontal directional drilling (HDD). Easements are not available from those property owners along the existing electrical easement right-of-way, which would be necessary to relocate the center-line of the gas pipeline to the overhead electrical line right-of-way filed on behalf of Columbia Gas of Ohio by C. Schraff.
07/15/2005 Easements for construction of the North Columbus Loop gas pipeline loop along the east side of Liberty Road filed on behalf of Columbia Gas of Ohio by C. Schraff.
07/11/2005 Proof of Publication (Franklin Co., Delaware Co)
07/07/2005 Joint stipulation and recommended findings of fact and conclusions of law filed on behalf of the Ohio Power Siting Board by S. Beeler, PUCO; M. Malone, Attorney General's office; C. Schraff and S. Sagun, Columbia Gas.
07/06/2005 Additional statements for the record to supplement the oral testimony presented under oath on June 20, 2005, as agreed to by the hearing examiner and the Applicant, filed on behalf of Alum Creek by M. Samuels, FACT Board Member.
07/06/2005 Transcript w/exhibits of hearing before Steven D. Lesser and Gregory A. Price, Hearing Examiners, at the PUCO, 180 E. Broad St., Columbus, Ohio, Room 11F, on June 21, 2005. (concluded)
06/23/2005 Transcript of hearing held June 20, 2005, at Westerville Central High School, Westerville, OH, Examiner G. A. Price and S. D. Lesser.
06/15/2005 Notice letter sent to individual landowners pursuant to OAC 4906-5-08(B)(3), and the notice letter to public officials required by OAC 4906-5-08(B)(3), filed on behalf of Columbia Gas of Ohio, Inc. by C. Schraff.
06/15/2005 Answer and responses of applicant Columbia Gas of Ohio, Inc. to third set of interrogatories and request for production of documents filed by intervenor William Bird on May 18, 2005, filed on behalf of Columbia Gas of Ohio, Inc. by C. Schraff and S. Sagun.
06/15/2005 Letter to William R. Byrd regarding earlier phone conversation, the Staff expects to sponsor Ray Strom as a witness in case at the upcoming adjudicatory hearing, filed on behalf of PUCO staff by W. Wright-Attorney General Section.
06/03/2005 Staff Report of Investigation and Recommended Findings filed by K. Lamback.
06/03/2005 Service Notice
06/02/2005 Service Notice
06/02/2005 Entry ordering that the motion to compel discovery filed by Mr. Bird on May 18, 2005 is denied. (SDL)
06/01/2005 Letter stating that applicant will be filing data request in Case No. 04-1621-GA-BTX docket, the data requests filed on May 17, 2005, were inadvertently filed in the 04-1620-GA-BTX docket only, filed by PUCO staff, S. Beeler.
05/31/2005 Notice of withdrawal as an intervener in case, filed on behalf of Genoa Township by M. Atkeson and J. Albers.
05/27/2005 Interrogatories and request for production of documents directed to applicant Columbia Gas of Ohio, Inc. (May 27, 2005), filed by W. Bird.
05/27/2005 Answers and responses of intervenor William Bird to the first set of interrogatories and request for production of documents filed by applicant Columbia Gas of Ohio, Inc..
05/27/2005 Reply memorandum in support of motion to compel discovery of information, filed by intervenor William Bird on May 18, 2005.
05/26/2005 Columbia Gas of Ohio, Inc. responses to Ohio Power Siting Board staff data request, filed by C. Schraff.
05/25/2005 Memorandum in opposition to motion to compel, filed on behalf of NiSource Corporate Services Company by C. Schraff.
05/19/2005 Proof of Publications filed on behalf of Columbia Gas of Ohio by C. Schraff.
05/19/2005 Verification of applicant Columbia Gas of Ohio, Inc.'s responses to interrogatories and requests for production filed by W. Bird.
05/18/2005 Notice of intervention and petition to intervene in the adjudicatory hearing filed by W. Bird.
05/18/2005 Submission of OPSB staff review and evaluation of pipeline route that would be installed around Hoover Reservoir, rather that through it filed by W. Bird.
05/18/2005 Motion and memorandum in support to compel discovery of information relating to those properties located within 100 feet of the proposed pipeline routes filed W. Bird.
05/18/2005 Interrogatories and request for production of documents directed to applicant Columbia Gas of Gas, Inc. filed by W. Bird
05/17/2005 Answers and responses to the second set of interrogatories, and request for production of documents filed by intervenor, filed on behalf of Columbia Gas of Ohio, Inc. by C. Schraff.
05/17/2005 Staff Data Requests, with instruction that answers are due May 24, 2005, filed on behalf of PUCO Staff by S. Beeler- Attorney General Section.
05/09/2005 First set of interrogatories and request for production of documents, filed on behalf of applicant by C. Schraff.
04/25/2005 Interrogatories and request for production of documents directed to applicant Columbia Gas of Ohio, Inc. (April 25, 2005) filed by W. Bird.
04/18/2005 Answers and responses to interrogatories and request for production of documents filed by intervenor William Bird, filed on behalf of Columbia Gas of Ohio, Inc. by C. Schraff.
04/14/2005 Service Notice
04/14/2005 Entry ordered that the hearings be scheduled at the times and places designated in finding 7; that Genoa Township's motion to intervene is granted; that notice of the hearings be published by Columbia in accordance with finding 8; that the Board will accept petitions to intervene in the adjudicatory hearing by interested persons up to five days prior to the scheduled date for the non-adjudicatory hearing, or late if good cause is shown, in accordance with finding 9. (SDL)
03/28/2005 Interrogatories and request for production of documents directed to applicant Columbia Gas of Ohio, Inc.(March 28, 2005) filed by W. Bird.
03/24/2005 Memorandum of William Bird in opposition to motion by applicant Columbia Gas of Ohio, Inc. to consolidate Proceedings.
03/23/2005 Correspondence stating that staff will support Columbia Gas request for consolidation of these cases filed by PUCO staff.
03/22/2005 Notice of intervention filed by M. Atkeson, J. Albers on behalf of Genoa Township.
03/18/2005 Motion to consolidate proceedings and request for expedited ruling and memorandum in support filed on behalf of Columbia Gas of Ohio by C. Schraff.
02/23/2005 Request for investigation report filed by William Bird.
02/23/2005 Affidavit of proof of service on public officers filed by C. Schraff on behalf of Columbia Gas of Ohio, Inc.
02/22/2005 Correspondence stating that it is the understanding of Columbia Gas of Ohio Inc. that Mr. Bird has decided to withdraw the discovery request which was earlier filed, Columbia Gas will not proceed further in responding to these requests. If misstated, please advise Board. Filed on behalf of Columbia Gas of Ohio by C. Schraff.
02/18/2005 Service Notice
02/18/2005 Service Notice
02/18/2005 Entry ordering that the interlocutory appeal from the ruling granting Columbia's motion for waivers of Section 4906.06(A), Revised Code, and Rule 4906-5-04, O.A.C. not be certified to the Board. (SL)
02/16/2005 Additional correction to memorandum in opposition to intervenor William R. Bird's application for rehearing filed on behalf of applicant (Columbia Gas of Ohio, Inc.) by C. Schraff.
02/15/2005 Correction to memorandum in opposition to intervenor William R. Bird's application for a rehearing, filed on behalf of Columbia Gas of Ohio, Inc. by C. Schraff.
02/11/2005 Memorandum in opposition to intervenor William R. Bird's application for rehearing, filed on behalf of Columbia Gas of Ohio, Inc. by C. Schraff.
02/07/2005 Application for rehearing relating to the findings and orders given in the administrative law judge entry, filed on February 4, 2005, filed by W. Bird.
02/07/2005 Service Notice
02/07/2005 Letter informing Columbia Gas of Ohio, Inc. that application has been found to comply with Chapters 4905-01, et seq. of the O.A.C., filed on behalf of Power Siting Board.
02/04/2005 Entry ordered that Columbia's motion for waivers of Section 4906.06(A), Revised Code and Rule 4906-5-04, O.A.C. as stated in this entry is granted; that the motion to intervene by William Bird is granted; that the motion by William Bird for additional time to respond to Columbia's request for waivers is granted; the remaining motions filed by Mr. Bird on December 6, 2004 and refiled on January 5, 2005 are denied. (SL)
01/28/2005 Supplemental memorandum #2 of William Bird in opposition to motions by applicant Columbia Gas of Ohio, Inc. for certain waivers filed by W. Bird.
01/26/2005 Replacement pages for Columbia Gas of Ohio OPSB application, Phases IV & V.
01/26/2005 Memorandum reviewing staff discussion on waivers requested by applicant.
01/25/2005 Additional project materials for the Northern Columbus Loop Projects filed by S. Sagan on behalf of Columbia Gas of Ohio, Inc.
01/19/2005 Supplemental memorandum of William Bird in opposition to motions for certain waivers.
01/13/2005 Supplemental memorandum in support of motion filed by C. Schraff on behalf of Columbia Gas of Ohio, Inc.
01/05/2005 Request for discovery of information from applicant Columbia Gas of Ohio, Inc. filed by W. Bird.
01/05/2005 Motion for certain action and memorandum in support filed by W. Bird.
01/05/2005 Memorandum in opposition to motions by applicant for certain waivers filed by W. Bird.
01/05/2005 Motion for certain waiver and memorandum in support filed by W. Bird.
12/29/2004 Notice of intervention and petition to intervene filed on behalf of William R. Bird.
12/27/2004 Reply Memorandum in Support of Four Motions and Motion by Ohio Resident for certain waiver filed by W. Bird.
12/17/2004 Memorandum of applicant in opposition to motions filed by W. Bird, filed by C. Schraff on behalf of Columbia Gas of Ohio, Inc.
12/16/2004 Additional information on Proposed Columbia Gas Northern Loop Project filed W. Bird.
12/13/2004 Additional comments filed by W. Bird.
12/06/2004 Motion for certain action and memorandum in support filed by W. Bird.
12/06/2004 Motion for certain action and memorandum in support filed by W. Bird.
12/06/2004 Motion for certain waiver, memorandum in support( Northern Columbus Loop Natural Pipeline Project) (Phase IV & V) filed by W. Bird.
12/06/2004 Motion for certain action and memorandum in support filed by W. Bird.
12/03/2004 Letter stating that Staff does not object to the waiver requests as made by the applicant, filed by K. Lambeck, PUCO staff.
12/02/2004 Application Continued. (Part 3 of 3)
12/02/2004 Application Continued. (Part 2 of 3)
12/02/2004 Application of Columbia Gas of Ohio, Inc. for a certificate of environmental compatibility and public need for the construction of the Northern Columbus Loop Natural Gas Pipeline Project (Phase IV and V) filed by C. Schraff. (Part 1 of 3)
11/08/2004 Correction to memorandum in support of motion filed by C. Schraff on behalf of Columbia Gas of Ohio, Inc.
11/02/2004 Response letter to William R. Bird filed by K. Lambeck, PUCO staff.
10/29/2004 Correspondence letter relating to the proposed Norther Loop Project filed by William Bird.
10/21/2004 Motion and memorandum in support for certain waivers filed on behalf of Columbia Gas of Ohio, Inc. by C. Schraff.
10/20/2004 In the matter of the application for certificate and notification of Columbia Gas of Ohio, Inc. to construct a natural gas pipeline for the northern portion of Franklin County and the southern portion of Delaware County. (PHASES IV & V)