Case Title: AMERICAN TRANSMISSION SYSTEMS, INC/BEAVER-GREENFIELD
Status: AR-Archived
Industry Code: EL-ELECTRIC
Purpose Code: BTX-Application for a Certificate/ Gas or Electric
Date Opened: 1/25/2001
Date Closed: 5/20/2002
Printable Docket Card Service List
View All
1 - 15 of 62 documents 1 /  5 
Date FiledSummaryPages
12/21/2004Letter stating that construction of the Beaver-Greenfield Electric Transmission Line project was completed on November 22, 2004 file by T. Krauss on behalf of FirstEnergy Service Company.1
07/06/2004Letter to Commission staff regarding update on Planting Plan at the Mills Creek Crossing of Beaver-Greenfiled Transmission Line Project, filed on behalf of applicant by T. Krauss.1
06/10/2004Letter notifying Commission that the Beaver-Greenfield Electric Transmission Line Project began commercial operation on May 28, 2004, and will notify when all construction activities are completed, filed on behalf of applicant by T. Krauss.1
04/01/2004Memo stating that Planting Plan at Mills Creek Crossing may proceed by K. Lambeck.1
03/29/2004Letter stating the condition of the steam bank vegetation where the Beaver-Greenfield Project filed on behalf of FirstEnergy by T. Krauss.1
03/03/2004Commencement Authorization for construction drawing TZ-219-F sheet 1 Revision G filed by K. Lambeck.1
01/23/2004Drawing of TZ-219F sheet 1, Revision G, entitled Ford 138kV Plan and Profile, filed on behalf of FirstEnergy Service Co. by T. Krauss.1
12/30/2003Department of transportation utilities permit. (03-329-04U). Last needed for this project filed on behalf of applicant by T. Krauss.4
12/19/2003Letter of the commencement of construction filed by K. Lambeck.1
12/08/2003Construction drawings for the Western section of the Beaver-Greenfield Electric Transmission Line plan,Beaver substation, and the Greenfield substation filed on behalf of applicant by T. Krauss.1
08/07/2003Letter regarding the pre-construction project filed by K. Lambeck.1
07/07/2003Letter to Mr. Lambeck filed on behalf of FirstEnergy by T. Krauss.1
03/04/2003Additional information regarding the pre-construction issues, filed by K. Lambock.1
02/11/2003Revision 1 of Access Maps 10, 13, 14, 15, 16, 17, 18, 14 and 25 of the Construction Access Plan for the Beaver-Greenfield Transmission Line Project filed by T. Krauss.11
01/29/2003Letter advising the Commission of the Revision 2 of Access Map 6, Construction Access Plan for the Beaver-Greenfield Transmission Line Project, filed by T. Krauss.2
 