DIS - Case Record for 01-0207-EL-BTX Skip to main content

Case Record For:

01-0207-EL-BTX

File a Public Comment
Case Title: AMERICAN TRANSMISSION SYSTEMS, INC/BEAVER-GREENFIELD
Status: AR-Archived
Industry Code: EL-ELECTRIC
Purpose Code: BTX-Application for a Certificate/ Gas or Electric
Date Opened: 1/25/2001
Date Closed: 5/20/2002
Printable Docket Card Service List
View per page
Date FiledSummaryPages
12/21/2004Letter stating that construction of the Beaver-Greenfield Electric Transmission Line project was completed on November 22, 2004 file by T. Krauss on behalf of FirstEnergy Service Company.1
07/06/2004Letter to Commission staff regarding update on Planting Plan at the Mills Creek Crossing of Beaver-Greenfiled Transmission Line Project, filed on behalf of applicant by T. Krauss.1
06/10/2004Letter notifying Commission that the Beaver-Greenfield Electric Transmission Line Project began commercial operation on May 28, 2004, and will notify when all construction activities are completed, filed on behalf of applicant by T. Krauss.1
04/01/2004Memo stating that Planting Plan at Mills Creek Crossing may proceed by K. Lambeck.1
03/29/2004Letter stating the condition of the steam bank vegetation where the Beaver-Greenfield Project filed on behalf of FirstEnergy by T. Krauss.1
03/03/2004Commencement Authorization for construction drawing TZ-219-F sheet 1 Revision G filed by K. Lambeck.1
01/23/2004Drawing of TZ-219F sheet 1, Revision G, entitled Ford 138kV Plan and Profile, filed on behalf of FirstEnergy Service Co. by T. Krauss.1
12/30/2003Department of transportation utilities permit. (03-329-04U). Last needed for this project filed on behalf of applicant by T. Krauss.4
12/19/2003Letter of the commencement of construction filed by K. Lambeck.1
12/08/2003Construction drawings for the Western section of the Beaver-Greenfield Electric Transmission Line plan,Beaver substation, and the Greenfield substation filed on behalf of applicant by T. Krauss.1
08/07/2003Letter regarding the pre-construction project filed by K. Lambeck.1
07/07/2003Letter to Mr. Lambeck filed on behalf of FirstEnergy by T. Krauss.1
03/04/2003Additional information regarding the pre-construction issues, filed by K. Lambock.1
02/11/2003Revision 1 of Access Maps 10, 13, 14, 15, 16, 17, 18, 14 and 25 of the Construction Access Plan for the Beaver-Greenfield Transmission Line Project filed by T. Krauss.11
01/29/2003Letter advising the Commission of the Revision 2 of Access Map 6, Construction Access Plan for the Beaver-Greenfield Transmission Line Project, filed by T. Krauss.2
01/09/2003Pre-construction Wetland and Stream Disturbance Report, for November 12, 2002 and December 2, 2002, filed on behalf of applicant by T. Krauss.11
12/05/2002Letter regarding Beaver-Greenfield Electric Transmission Line Project OPSB Phase I Archaeology Survey Submittal, filed by T. Krauss.1
12/05/2002Letter regarding Beaver-Greenfield Electric Transmission Line Project OPSB start of construction of Vegetative Clearing for the Central, Eastern 138 kv, Eastern 345kv and Beaver Substation Phases, filed by T. Krauss.1
12/05/2002Letter regarding the Herbicide Use Plan, Phase I Archaeological Study, Edison Woods Threatened and Endangered Species, Study, Vegetative Clearing Plan, (Revision 2) and the engineering drawings for the Central Eastern 138kv and Eastern 345kv phases of the project filed by K. Lambeck.1
12/05/2002Additional information filed by T. Krauss.1
12/05/2002Letter regarding Beaver-Greenfield Electric Transmission Line Project OPSB Vegetative Clearing Plan Revision 2 Submittal, filed by T. Krauss.11
10/28/2002Letter regarding Vegetative Clearing Plan on behalf of Beaver-Greenfield Electric Transmission Line Project, filed by T. Krauss.1
08/29/2002Transmission upgrades construction status filed on behalf of applicant by T. Krauss.10
07/09/2002Threatened and Endangered Species Survey Report filed on behalf of applicant by T. Krauss.2
05/21/2002Service Notice.10
05/21/2002Service Notice.10
05/20/2002Opinion, Order and Certificate approving the joint stipulation and recommendation in its entirety; that a certificate of environmental compatibility and public need is hereby issued to ATSI.22
04/11/2002Revision of access maps 4, 5, and 6 of the Construction Access Plan for the Beaver-Greenfiled Transmission Line Project, filed by T. Krauss.4
03/26/2002Letter stating that URS Corporation has been retained to perform the survey of the right-of-way and planned access routes of the Beaver-Greenfield Transmission Line, filed on behalf of American Transmission Systems by T. Krauss.1
03/20/2002Construction Herbicide Use Plan for the Beaver-Greenfield Electric Transmission Line Project, filed by T. Krauss.3
03/12/2002Highway Crossing Permits for the Central, Eastern 138 and Eastern 345 kV Phases of Beaver-Greenfield Electric Transmission Line project, filed by T. Krauss.23
02/25/2002Transcript for hearing held 2/5/02 at Bowling Green State University, Huron, Ohio.5
02/19/2002Transcript for hearing held 2/7/02. (Part 2 of 2).256
02/19/2002Transcript for hearing held 2/7/02. (Part 1 of 2) 200
02/07/2002Joint stipulation and recommended findings of fact and conclusions of law filed on behalf of the PUCO staff by J. Bair and M. Buckley; and American Transmission Systems by C. Schraff and M. Beiting.14
01/28/2002Letter regarding the Revision 1 of Access map 46 of 46 of the construction access plan for the Beaver-Greenfield Transmission Line Project filed by T. Krauss. 2
01/25/2002Proof of publication regarding the Beaver-Greenfield Transmission Line Project filed by C. Schraff.8
01/22/2002Correspondence letter from John A. Blakeman, Meadow Environments LLC.1
01/22/2002Response letter sent to John Blakeman from Kim Wissman.1
01/18/2002Staff report filed.36
01/18/2002Service notice10
01/15/2002Proof of letter mailings to public officials, filed on behalf of applicant by C. Schraff.98
01/11/2002Public notice regarding the Beaver-Greenfiled transmission line project filed by C. Schraff.9
12/27/2001Letter regarding the Wetland Delineation report supplement for the proposed Beaver-Greenfield Transmission Line project filed by T. Krauss.23
12/12/2001Revenue receipts filed.1
12/07/2001Supplement to application filed on behalf of applicant by T. Burgess.19
12/04/2001Service Notice9
11/30/2001Entry ordering that a public hearing regarding the application be scheduled on 2/5/02, at 7:00 p.m. at the Foundation Hall, Bowling Green State University, Firelands College, 1 University Drive, Huron, Ohio 44899. (AE)2
10/31/2001Affidavit of proof of service of certified application of public officers, filed on behalf of applicant by C. Schraff.72
10/05/2001Letter to Mr. Thomas C. Burgess, American Transmission Systems, stating that this application has been found to comply with Chapters 4906-01, et seq., of the O.A.C., filed on behalf of the PUCO staff.2
08/23/2001Wetland Delineation Report continued. (Part 3 of 3)233
08/23/2001Wetland Delineation Report continued. (Part 2 of 3)201
08/23/2001Wetland Delineation Report filed. (Part 1 of 3)201
08/23/2001Construction access plan filed on behalf of applicant.51
08/09/2001Service Notice.1
08/08/2001Entry granting ATSI's motion for a waiver of the filing time requirements of Section 4906.06(A)(6), Revised Code. (AE)2
07/27/2001Motion for waiver and memorandum in support filed on behalf of applicant by C. Schraff.5
07/27/2001Application filed on behalf of applicant by T. Burgess.359
06/14/2001Proofs of publication. (Lorain, Erie, and Cuyahoga counties.9
06/08/2001Service Notice.1
06/07/2001Entry ordering that applicant's motion for a waiver of the requirement of Rule 4906-5-04(A)(2)(a)(iii), O.A.C. is granted. (AE)2
01/25/2001In the matter of the application of American Transmission Systems, Inc. for a certificate of environmental compatibility and public need for the Beaver-Greenfield Transmission Line Project.7