Date Filed | Summary | Pages |
07/22/2003 | Letter to Commission notifying Ohio Power Siting Board that on July 14, 2003, Power Block 2 of the Hanging Rock Energy Facility was declared ready for commerical operation, filed on behalf of Duke Energy by W. Lindsay. | 1 |
06/13/2003 | Letter to Mr. Winget that Power Block 1 of the Hanging Rock Energy Facility was declared ready for commerical operation, filed on behalf of Duke Energy Hanging Rock, LLC by W. Lindsay-Project Director. | 1 |
01/09/2003 | Ohio water withdrawal registration, Duke Energy Hanging Rock, LLC, Hanging Rock Energy Facility, filed by W. Campbell, III. | 6 |
11/14/2002 | Letter confirming that the work has been completed at the Hanging Rock facility, filed on behalf of applicant by S. Bloomfield. | 1 |
11/05/2002 | Letter confirming a copy of the Ohio Water Withdraw Registration for the Hanging Rock Energy Facility was provided filed on behalf of applicant by S. Bloomfield. | 1 |
08/29/2002 | Permit to install filed on behalf of applicant. | 95 |
08/26/2002 | Additional information filed on behalf of applicant by S. Bloomfield. | 1 |
08/05/2002 | Letter confirming that a copy of the Final Phase III Archaeological Investigations of the Davisson Farm Site (33Le619) in support of the proposed Hanging Rock Energy Facility (Volumes I and II) was provided on behalf of Duke Energy Hanging Rock, LLC filed by S. Bloomfield. | 1 |
07/16/2002 | Letter confirming that a copy of the Ohio EPA permit to install sewage treatment and disposal facilities was provided to Leon Winget, PUCO staff, filed on behalf of applicant by S. Bloomfield. | 1 |
07/16/2002 | Letter confirming that a copy of the Ohio EPA final permit to install modification was provided this day under separate cover to Leon Winget, PUCO staff, filed on behalf of applicant by S. Bloomfield. | 1 |
07/16/2002 | Letter confirming that a copy of the Army Corps of Engineers letter dated June 28, 2002 approving the request for improvements of the Ohio River shoreline was provided on this day under separate cover to Leon Winget, PUCO staff, filed on behalf of applicant by S. Bloomfield. | 1 |
07/16/2002 | Correspondence letter to applicant dated December 31, 2001, filed on behalf of the Ohio EPA by P. Smith. | 35 |
06/25/2002 | Letter regarding the Management Summary of Phase III Archaeological Investigations of the Hanging Rock site filed by S. Bloomfield. | 2 |
04/23/2002 | Letter stating that a copy of the Phase II Cultural Resources Investigations at Site 33Sc421 for the proposed Texas Eastern Hanging Rock Lateral Pipeline Project was provided on behalf of Duke Energy Hanging Rock, LLC by S. Bloomfield. | 1 |
04/12/2002 | Letter regarding the Hanging Rock Project site to review the SWPPP control devices. | 4 |