Summary: |
Letter informing the Ohio Power Siting Board that with respect to the Franklin 20 Inch Pipeline Project, on April 3, 2009 by electronic mail: a copy of the Hydrostatic Testing Plan was sent to Staff filed by S. Bloomfield on behalf of Dominion East Ohio. |
|