Summary: |
Opinion and order stating that the stipulation be approved and adopted; that a certificate be issued to BP-Husky for the construction, operation, and maintenance of the project, as proposed, at the preferred site; that the certificate contain the 18 conditions set forth in Section V of this opinion and order. (OPSB) |
|