Summary: |
Entry ordering additional protective devices be installed at the public grade crossings identified in this entry; that preliminary costs associated with these projects be funded as set forth in this entry; and the railroads file, within 90 days, the site plant, cost estimates, and proposed time schedules for the installation. |
|