Summary: |
Entry ordering that the request for two-way, flat-rate EAS between the Lewisburg and Eaton Exchanges is denied. The two-way, nonoptional, measured-rate EAS be instituted between the Lewisburg and Eaton Exchanges within 24 months of this order. GTE and United are ordered to establish an in-service date within four months of this order. |
|