Summary: |
Entry ordered the projects for installation of additional protective devices be authorized for public grade crossings identified in Finding No. 4; the preliminary engineering and construction costs associated with these installation projects be funded as set forth in Finding No. 5; the rail- roads file with the Commission as soon as possible the site plans, cost estimates and proposed time schedules for the installation of devices as set forth in Finding No. 7. That all installation be completed at these crossings no later than September 24, 1999. (5 pgs.) |
|