Summary: |
Finding & Order that the EFC rate to be charged by Toledo Edison during the next period beginning September 1, 1997 shall be 1.1368c/kWh; that Toledo Edison file its EFC tariff rider incorporating the EFC rate by August 31, 1997; that the EFC rider become effective on September 1, 1997, and remain in effect until otherwise ordered by the Commission. (3 pgs.) |
|