Summary: |
Audit of the gas cost recovery mechanism for th effective GCR period March 1, 1994 to February 29, 1996 for the CORE system and for the SCOL system filed on behalf of the PUCO staff by R. Sarver, T. Pearce, J. Rodriguez, J. McNaughton, K. James, D. Erickson. (31 pgs.) |
|