Summary: |
ICN #0179 Letter in response to transmittal dated May 3, 1995 referencing that the National Pollutant Discharge Elimination System (NPDES) Permit - Storm Water General Permit for Construction Activity is not required for this project, filed by K. Wissman, OPSB staff. (1 pg.) |
|