Summary: |
Entry ordering that Conrail proceed with the installation of light signals and roadway gates at the SR 256 highway/ railroad grade crossing; that pursuant to the terms of the stipulation, the installation be completed as quickly as possible, but in any event not later than January 30, 1995. |
|