Summary: |
Correspondence Advice to PUCO of an increase in the installed capacity (2 new engines) at the Bio Energy (Ohio II), LLC Carbon Limestone landfill gas to electricity power station from 19.1 MW to 21.8 MW in April 2011. electronically filed by Mr. Chris D Eastgate on behalf of BIO ENERGY (OHIO II), LLC. |
|