Summary: |
In the matter of the Letter of Notification of Jackson Generating Company to construct a 345 kV transmission line connecting the Bloomfield Power Generating Facility to an interconnect point on an existing OVEC 345 kV transmission line located approximately 0.8 mile north of the Facility. |
|