Summary: |
Entry ordering that the May 21, 2001, as amended on June 18, 2001 certificate of environmental compatibility and public need previously granted to Fremont Energy Center, LLC for the construction and operation of a 704-MW electric generating station in Sandusky Township, Sandusky, Ohio, shall be transferred to Calpine Corporation, ordered that Calpine Corp. shall be bound by and comply with all terms and conditions of the certificate.(OPSB) |
|