Summary: |
Opinion, order and certificate ordering that the stipulation is approved and adopted; that a certificate be issued to Sun Coke for the construction, operation, and maintenance of the project as proposed at the preferred site; that the certificate contain the 23 conditions as set forth in Section V . (Ohio Power Siting Board). |
|