Summary: |
OPSB Response letter to Mark Camp regarding the Transmission Systems, Incorporated (ATSI) / First Energy's proposed East
Springfield-London-Tangy 138 kV Electric Transmission Line project. filed by K. Wissman on behalf of Ohio Power Siting Board. |
|