Summary: |
Entry stating that the effective time frames for the applicable interim and permanent two-wire analog rates shall be discussed in this entry;that SBC and CLECs engage in a true-up process consistent with this entry; that the existing interconnection agreements between SBC Ohio and CLECs shall be amended consistent with this entry. |
|