Summary: |
Letter stating that the in-service date for the installation of two-way measured-rate EAS between Verizon's West Milton exchange and Ameritech's Vandalia exchange, will be January 16, 2002 at 12:01 a.m., filed on behalf of Verizon North by J. Kennedy. |
|