Summary: |
Entry granting the joint application to bifurcate the construction certificate and assign the portion of the construction certificate for a utility switchyard from Long Ridge Energy Generation LLC to AEP Ohio Transmission Company, Inc., in accordance with R.C. 4906.04 electronically filed by Heather A Chilcote on behalf of The Ohio Power Siting Board. |
|