Summary: |
Letter stating start of construction; Carlisle-Star 345 kV Transmission Line Loop to North Medina Transmission Substation in Case No. 06-408-EL-BGN; start of construction; West Akron-West Medina 138 kV Transmission Line Loop to North Medina Transmission Substation in Case No. 06-409-EL-BLN and status update of Condition 10 North Medina Transmission Substation in Case No. 05-808-EL-BTX filed on behalf of FirstEnergy by T. Krauss. |
|