24-0005-EL-BLN | Macy 138 kV Station and Extension Project | 01/10/2024 | |
24-0007-EL-UNC | In the Matter of The Commission’s Investigation into AES’s Compliance with the Ohio Administrative Code and Potential Remedial Action | 01/02/2024 | |
24-0008-EL-WVR | THE DAYTON POWER AND LIGHT COMPANY D/B/A AES OHIO | 01/02/2024 | |
24-0014-EL-BLN | Vassell-Green Chapel 345 kV | 01/04/2024 | |
24-0016-EL-RDR | IN THE MATTER OF THE ANNUAL REVIEW OF THE DISTRIBUTION INVESTMENT RIDER CONTAINED IN THE TARIFF OF THE DAYTON POWER AND LIGHT COMPANY d/b/a AES OHIO | 02/08/2024 | |
24-0018-EL-RDR | Application of Duke Energy Ohio, Inc., to Adjust and Set Rider ESRR | 01/30/2024 | |
24-0019-EL-ATA | Duke Energy Ohio, Inc. | 01/30/2024 | |
24-0020-EL-RDR | In the Matter of the Application of Duke Energy Ohio, Inc., for the Annual Audit of Rider SCR, Rider RE, Rider RC, and Rider ECF | 01/30/2024 | |
24-0022-EL-RDR | Ohio Edison Company, The Cleveland Electric Illuminating, The Toledo Edison Company | 01/16/2024 | |
24-0024-EL-RDR | In the Matter of the Application of The Dayton Power and Light Company d/b/a AES Ohio to Update its Proactive Reliability Optimization Rider | 02/01/2024 | |
24-0025-EL-AEC | Joint Application for Extension of the Reasonable Arrangement between Ohio Power Company and JSW Steel USA Ohio Inc. | 01/10/2024 | |
24-0027-EL-GAG | Village of Lowellville (Mahoning County) | 01/11/2024 | |
24-0031-EL-CSS | Carol Lonas / Shamika Taylor vs Toledo Edison | 01/11/2024 | |
24-0032-EL-GAG | Tuscarawas County | 01/11/2024 | |
24-0034-EL-BNR | Beatty – Canal Street 138 kV (Beatty Road – White Road) Pole Installation Project | 01/18/2024 | |
24-0037-EL-BLN | Letter of Notification for American Transmission Services, Incorporated’s | 02/15/2024 | |
24-0039-EL-RDR | In the Matter of the Application of Duke Energy Ohio, Inc., for Authority to Adjust its Power Future Initiatives Rider | 02/09/2024 | |
24-0042-EL-RDR | In the Matter of the Application of Ohio Power Company to Update Its Basic Transmission Cost Rider. | 01/17/2024 | |
24-0043-EL-GAG | Mercer County | 01/17/2024 | |
24-0045-EL-POR | In the Matter of the Application of Duke Energy Ohio, Inc., for Approval of its 2024 - 2026 Energy Efficiency and Demand Side Management Portfolio of | 01/22/2024 | |
24-0046-EL-ATA | In the Matter of the Application of Duke Energy Ohio, Inc., for Approval of Tariff Amendments. | 01/22/2024 | |
24-0047-EL-GAG | Village of Galena | 01/18/2024 | |
24-0048-EL-GAG | City of Wooster | 01/18/2024 | |
24-0054-EL-ABN | In the Matter of the Application of The Cleveland Electric Illuminating Company for Authority to Abandon Electric Service Lines Pursuant to Ohio Revis | 01/25/2024 | |
24-0055-EL-ATA | In the Matter of the Application of Ohio Edison Company, The Cleveland Electric Illuminating Company, and the Toledo Edison Company for Approval of Ta | 01/25/2024 | |
24-0060-EL-CSS | Duke Energy Ohio, Inc. vs 100 Central Parkway, LLC and City Center Properties, LLC | 01/23/2024 | |
24-0061-EL-ABN | In the Matter of the Application of Duke Energy Ohio, Inc. for Authority to Abandon Electric Service Lines Pursuant to Ohio Revised Code Sections 4905 | 01/23/2024 | |
24-0062-EL-EDI | Adoption of Electronic Data Interchange Standards and Uniform Business Practices for the Electric Industry | 05/08/2024 | |
24-0066-EL-BNR | Jerome-Rohan 138 kV Tie Lines Project | 02/05/2024 | |
24-0067-EL-UNC | In the Matter of the Application of The Dayton Power and Light Company d/b/a AES Ohio for Approval of a Revised Bill Format for Electric Service | 06/04/2024 | |
24-0068-EL-ESS | Duke Energy Ohio, Inc. 2024 Reliability Standards Case | 05/10/2024 | |
24-0069-EL-ACP | Messer Energy Services Inc.'s Annual Alternative Energy Portfolio Status Report - 2023 ACP | 02/12/2024 | |
24-0070-EL-GAG | Village of Continental | 01/24/2024 | |
24-0071-EL-CSS | Josh Davis vs Energy Harbor | 01/24/2024 | |
24-0072-EL-RDR | In the Matter of the Application of Duke Energy Ohio, Inc., to Adjust and Set Rider DSR. | 03/28/2024 | |
24-0073-EL-ATA | In the Matter of the Application of Duke Energy Ohio, Inc., for Approval of Tariff Amendments. | 03/28/2024 | |
24-0075-EL-AGG | Via Energy Solutions, LLC - CRES Application | 01/25/2024 | |
24-0076-EL-BLN | Fostoria-East Lima 138 kV Transmission Line Rebuild Project (East Lima – North Woodcock and New Liberty – West End Fostoria) | 02/02/2024 | |
24-0077-EL-BLN | Fostoria-East Lima 138 kV Transmission Line Rebuild Project (North Woodcock – New Liberty) | 02/02/2024 | |
24-0079-EL-BNR | Chamberlain-West Akron 138 kV Transmission Line Switch Replacement Project | 02/27/2024 | |
24-0081-EL-ACP | Renewable Portfolio Standard Report to the General Assembly for the 2022 Compliance Year | 03/12/2024 | |
24-0082-EL-BNR | Melmore-Tiffin Center 138 kV Transmission Line Replacement Project | 02/07/2024 | |
24-0091-EL-BNR | Corridor-Morse 138 kV Pole Installation Project | 02/07/2024 | |
24-0092-EL-AGG | In the Matter of the Application of Alto Energy Consulting, LLC | 01/30/2024 | |
24-0096-EL-BGA | In the Matter of the Application of Grover Hill Wind, LLC for a Second Amendment to its Certificate Issued in Case No. 20-417-EL-BGN. | 02/09/2024 | |
24-0097-EL-BLN | Adjustments to the Huntley 138 kV Extension Cut-in, Scherers Switch, and Scherers Switch-Alexander 138 kV Transmission Line Project | 03/19/2024 | |
24-0100-EL-CSS | Carol S Trunzo vs Ohio Edison | 02/01/2024 | |
24-0101-EL-RDR | Application of Ohio Power Company to Adjust The Economic Development Cost Recovery Rider Rate. | 02/01/2024 | |
24-0104-EL-ORD | IN THE MATTER OF THE COMMISSION’S REVIEW OF THE RULES IN OHIO ADM.CODE CHAPTER 4901:1-26. | 02/05/2024 | |
24-0106-EL-ATA | Application of Ohio Power Company for Authority to New or Amended Rate Schedules and Tariffs. | 02/05/2024 | |
24-0107-EL-AAM | Application of Ohio Power Company for Approval to Change Accounting Methods. | 02/05/2024 | |
24-0108-EL-CSS | Nem Construction Inc vs Ohio Edison | 02/05/2024 | |
24-0111-EL-BLN | West Watertown - Watertown 138 kV Transmission Line Project | 04/02/2024 | |
24-0112-EL-GRD | The Dayton Power and Light Company | 02/08/2024 | |
24-0113-EL-AAM | The Dayton Power and Light Company d/b/a AES Ohio | 02/08/2024 | |
24-0115-EL-BLN | Kileville-Jerome 138 kV Transmission Line Adjustment Project | 02/08/2024 | |
24-0118-EL-BLN | Vassell-Curleys 345 kV Transmission Line Project | 02/08/2024 | |
24-0123-EL-ACP | Greenlight Energy RPS Compliance Filing Report for Compliance Year 2023 | 03/28/2024 | |
24-0131-EL-BNR | Morse - Clinton 138 kV Pole Installation Project | 02/20/2024 | |
24-0132-EL-UNC | IN THE MATTER OF THE REVIEW OF THE UNCOLLECTIBLE EXPENSE RECOVERY OF THE DAYTON POWER AND LIGHT COMPANY D/B/A AES OHIO. | 02/13/2024 | |
24-0133-EL-UNC | In the Matter of the Procurement of Standard Service Offer Generation as Part of the Fifth Electric Security Plan for Customers of Ohio Edison Company | 02/13/2024 | |
24-0136-EL-CSS | Helen Curry v. Residents Energy, LLC and AEP Ohio | 02/14/2024 | |
24-0140-EL-GAG | City of Grandview Heights | 02/16/2024 | |
24-0141-EL-RDR | In the Matter of the Application of Duke Energy Ohio, Inc., for Approval to Adjust Rider DDR | 02/29/2024 | |
24-0143-EL-AEC | In the Matter of Glorious Sky LLC for Approval of a Reasonable Arrangement | 02/16/2024 | |
24-0146-EL-AEC | In the Matter of the Application for Establishment of a Reasonable Arrangement Between Viking Data Center and Ohio Edison Company | 02/21/2024 | |
24-0152-EL-BNR | Brie - Voltron 138 kV Transmission Line Project | 02/23/2024 | |
24-0153-EL-RDR | In the Matter of the Legacy Generation Resource Rider Audits Required by R.C. 4928.148 for Duke Energy Ohio, Inc., The Dayton Power and Light Compan | 02/22/2024 | |
24-0159-EL-AEC | In the Matter of the Application of North Star BlueScope Steel for Approval of a Reasonable Arrangement. | 03/01/2024 | |
24-0160-EL-ACP | MCSquared Energy Services 2023 RPS Report | 02/26/2024 | |
24-0173-EL-BNR | Newcomerstown – South Coshocton 138 kV Transmission Line Structure Adjustment Project | 03/08/2024 | |
24-0175-EL-BLN | Cyprus 345 kV Extension Project | 03/08/2024 | |
24-0177-EL-ACP | Alpha Gas and Electric, LLC 2023 RPS Compliance Report | 03/05/2024 | |
24-0178-EL-ACP | RPA Energy, Inc. 2023 RPS Compliance Report
| 04/04/2024 | |
24-0179-EL-ACP | Rushmore Energy, LLC 2023 RPS Compliance Report | 04/09/2024 | |
24-0180-EL-ACP | South Bay Energy Corp. 2023 RPS Compliance Report | 04/04/2024 | |
24-0181-EL-ACP | Smartest Energy US LLC 2023 RPS Compliance Report | 04/02/2024 | |
24-0185-EL-RDR | IN THE MATTER OF THE REVIEW OF THE DISTRIBUTION INVESTMENT RIDER CONTAINED IN THE TARIFF OF OHIO POWER COMPANY | 03/28/2024 | |
24-0187-EL-AIS | Ohio Power Company Short-Term Debt Finance Application | 03/07/2024 | |
24-0188-EL-AIS | Ohio Power Company Long-Term Debt Finance Application | 03/06/2024 | |
24-0189-EL-AGG | Greencrown Energy, LLC | 03/05/2024 | |
24-0190-EL-ACP | ResCom Energy, LLC - OH RPS Annual Report | 04/12/2024 | |
24-0195-EL-AGG | In the Matter of the Application Go Sustainable Energy, LLC for Certification as an Electric Power Broker | 03/21/2024 | |
24-0196-EL-RDR | AES Ohio - Annual True-up Filing for its Transmission Cost Recovery Rider - Nonbypassable | 03/15/2024 | |
24-0201-EL-ACP | CleanChoice Energy RPS Report 2023 | 04/12/2024 | |
24-0202-EL-ACP | 2023 Renaissance Power & Gas RPS Report | 03/21/2024 | |
24-0215-EL-BLN | OPSB Aicholtz | 04/18/2024 | |
24-0222-EL-ACP | RPS Compliance Filing - Major Energy Electric Services, LLC | 04/09/2024 | |
24-0223-EL-ACP | RPS Compliance Filing - Verde Energy USA Ohio, LLC | 04/09/2024 | |
24-0224-EL-GAG | Village of Lincoln Heights | 03/14/2024 | |
24-0225-EL-GAG | Village of Mariemont | 04/09/2024 | |
24-0229-EL-BNR | In the Matter of the Construction Notification Report for American Transmission Systems, Incorporated's Delta-Wauseon 138 kV Transmission Line Switch | 04/26/2024 | |
24-0230-EL-ACP | Duke Energy Ohio, Inc. 2023 RPS Compliance | 04/12/2024 | |
24-0231-EL-ACP | Atlantic Energy MD, LLC - RPS Compliance Filing Report for 2023 Compliance Year | 03/14/2024 | |
24-0235-EL-ACP | RPS Compliance Filing for 2023 Compliance Year - Choice Energy LLC d/b/a 4 Choice Energy LLC | 03/15/2024 | |
24-0243-EL-BLN | In the Matter of the Letter of Notification of the Application by American Transmission Systems, Incorporated for the Darrow-Hudson East 138 kV Transm | 04/09/2024 | |
24-0244-EL-ACP | SFE Energy Ohio Renewable Portfolio Standard Report for the 2023 Compliance Year | 03/18/2024 | |
24-0245-EL-ACP | Statewise Energy Ohio Renewable Portfolio Standard Report for the 2023 Compliance Year | 03/18/2024 | |
24-0246-EL-ACP | MEDIAN ENERGY CORP | 03/21/2024 | |
24-0252-EL-BGA | In the Matter of the Application of Clearview Solar I, LLC for a First Amendment to its Certificate of Environmental Compatibility and Public Need | 04/12/2024 | |
24-0254-EL-ACP | RPS Compliance Filing Report 2023 Compliance Year - Texas Retail Energy | 03/20/2024 | |
24-0255-EL-ACP | Cleveland-Cliffs Electric Supply LLC Renewable Portfolio Standard Report for the 2023 Compliance Year | 03/21/2024 | |
24-0256-EL-ACP | Cleveland-Cliffs Steel LLC Renewable Portfolio Standard Report for the 2023 Compliance Year | 03/21/2024 | |
24-0258-EL-ACP | Titan Gas, LLC dba CleanSky Energy | 03/22/2024 | |
24-0260-EL-CSS | Pamela Walsh vs. Duke Energy | 03/21/2024 | |
24-0261-EL-ACP | In the Matter of the Alternative Energy Portfolio Status Report for Calendar Year 2023 for Energy Plus Holdings LLC | 04/10/2024 | |
24-0262-EL-ACP | In the Matter of the Alternative Energy Portfolio Status Report for Calendar Year 2023 for Reliant Energy Northeast LLC | 04/10/2024 | |
24-0263-EL-ACP | In the Matter of the Alternative Energy Portfolio Status Report for Calendar Year 2023 for Stream Ohio Gas & Electric, LLC | 04/09/2024 | |
24-0264-EL-ACP | In the Matter of the Alternative Energy Portfolio Status Report for Calendar Year 2023 for XOOM Energy Ohio, LLC | 04/10/2024 | |
24-0265-EL-ACP | In the Matter of the Alternative Energy Portfolio Status Report for Calendar Year 2023 for Direct Energy Services, LLC | 04/10/2024 | |
24-0266-EL-ACP | In the Matter of the Alternative Energy Portfolio Status Report for Calendar Year 2023 for Direct Energy Business, LLC | 04/10/2024 | |
24-0267-EL-ACP | In the Matter of the Alternative Energy Portfolio Status Report for Calendar Year 2023 for Green Mountain Energy Company | 04/09/2024 | |
24-0268-EL-ACP | In the Matter of the Alternative Energy Portfolio Status Report for Calendar Year 2023 for Independence Energy Group LLC | 03/22/2024 | |
24-0269-EL-ACP | AP Gas & Electric (OH), LLC RPS Report for 2023 | 03/22/2024 | |
24-0270-EL-GAG | Lemon Township, Butler County | 05/14/2024 | |
24-0275-EL-REN | Markland Hydroelectric Facility | 03/25/2024 | |
24-0278-EL-SSO | Duke Energy Ohio, Inc. | 03/25/2024 | |
24-0279-EL-ATA | Duke Energy Ohio, Inc. | 03/25/2024 | |
24-0280-EL-AAM | Duke Energy Ohio, Inc. | 03/25/2024 | |
24-0281-EL-ACP | Shipley Choice LLC 2023 Annual RPS Report | 03/25/2024 | |
24-0282-EL-ACP | American Power & Gas of Ohio LLC | 03/25/2024 | |
24-0283-EL-BNR | In the Matter of the Construction Notification Report by American Transmission Systems, Incorporated for the Fostoria Central-Lallendorf 345 kV Transm | 06/07/2024 | |
24-0285-EL-ACP | First Point Power 2023 RPS Report | 04/01/2024 | |
24-0287-EL-ACP | In the Matter of the Alternative Energy Portfolio Status Report for Calendar Year 2023 from MidAmerican Energy Services, LLC | 03/27/2024 | |
24-0291-EL-UNC | IN THE MATTER OF THE PROCUREMENT OF PERCENTAGE OF INCOME PAYMENT PLAN PROGRAM GENERATION FOR CUSTOMERS OF OHIO EDISON COMPANY, THE CLEVELAND ELECTRIC | 03/27/2024 | |
24-0293-EL-ACP | EnPowered USA Inc. | 04/02/2024 | |
24-0294-EL-ACP | Engie Power & Gas LLC OH RPS Compliance Report for CY2023 | 03/27/2024 | |
24-0295-EL-ACP | Mpower Energy NJ LLC RPS Compliance Report for CY2023 | 03/27/2024 | |
24-0298-EL-ACP | In the Matter of the Alternative Energy Portfolio Status Report for Calendar Year 2023 from Hudson Energy Services, LLC | 04/10/2024 | |
24-0299-EL-ACP | In the Matter of the Alternative Energy Portfolio Status Report for Calendar Year 2023 from Just Energy Solutions, Inc. | 04/10/2024 | |
24-0302-EL-BNR | In the Matter of the Construction Notification Report of American Transmission Services, Incorporated for the Longview-Nottingham 138 kV Transmission | 05/14/2024 | |
24-0304-EL-ACP | Octopus Energy LLC -Renewable Portfolio Standard (RPS) Compliance Filing Report 2023 Compliance | 03/28/2024 | |
24-0306-EL-ACP | 2023 RPS Report Empowered USA, Inc | 04/01/2024 | |
24-0312-EL-ACP | Freepoint Energy Solutions LLC - Annual RPS Compliance | 04/02/2024 | |
24-0322-EL-ACP | ENGIE Resources 2023 RPS Report Filing | 04/04/2024 | |
24-0326-EL-ACP | WGL Energy Services, Inc. RPS Report for 2023 | 04/08/2024 | |
24-0327-EL-ATA | In the Matter of the Application of Ohio Edison Company, The Cleveland Electric Illuminating Company, and The Toledo Edison Company for Approval of Ta | 04/08/2024 | |
24-0328-EL-ACP | 2023 RPS Compliance - Clearview Electric, inc. | 04/08/2024 | |
24-0333-EL-CSS | Glenn DeMaro vs SmartEnergy Holdings LLC | 04/08/2024 | |
24-0334-EL-BNR | Lammer-Powell Creek Solar 138 kV Transmission Line and East Leipsic-Richland 138 kV Cut-in Project | 04/08/2024 | |
24-0336-EL-RDR | The Dayton Power and Light Company d/b/a AES Ohio | 04/17/2024 | |
24-0337-EL-ACP | The Dayton Power and Light Company d/b/a AES Ohio | 04/15/2024 | |
24-0338-EL-ACP | OH RPS Compliance Filing Report 2023 Compliance Year for Atlantic Energy MD, LLC | 04/12/2024 | |
24-0340-EL-REN | Boiling Springs Wind Farm, LLC | 04/09/2024 | |
24-0341-EL-RDR | Ohio Power Company | 04/10/2024 | |
24-0342-EL-AAM | Ohio Power Company | 04/10/2024 | |
24-0343-EL-ACP | Summer Energy Midwest, LLC RPS Compliance Filings | 04/09/2024 | |
24-0344-EL-ACP | Vista Energy Marketing L.P. RPS Report | 04/09/2024 | |
24-0349-EL-ACP | Tomorrow Energy RPS Compliance Report for CY2023 | 04/10/2024 | |
24-0350-EL-ACP | Approved Energy II 2023 OH RPS Report No Sales | 04/10/2024 | |
24-0352-EL-CSS | Judy Dixon Vs AES Ohio | 04/10/2024 | |
24-0353-EL-ACP | In the Matter of the Alternative Energy Portfolio Status Report for Calendar Year 2023 for NextEra Energy Services Ohio, LLC | 04/12/2024 | |
24-0354-EL-ACP | Frontier Utilities Northeast LLC RPS Compliance Report for CY2023 | 04/15/2024 | |
24-0356-EL-ACP | New Wave Energy LLC RPS Compliance Report for CY2023 | 04/10/2024 | |
24-0357-EL-ACP | Provision Power and Gas, LLC 2023 OH RPS Compliance | 04/10/2024 | |
24-0358-EL-ACP | Grid Power Direct, LLC OH RPS 2023 Filing | 04/10/2024 | |
24-0359-EL-ACP | Cleveland-Cliffs Steel LLC fka Arcelormittal USA LLC Renewable Portfolio Standard Report for the 2022 Compliance Year | 04/10/2024 | |
24-0360-EL-ACP | American Power Net Management LP RPS Compliance Report for CY2023 | 04/11/2024 | |
24-0361-EL-ACP | APN Starfirst LP RPS Compliance Report for CY2023 | 04/11/2024 | |
24-0362-EL-UNC | In the Matter of the Procurement of Percentage of Income Payment Plan Program Generation for Customers of The Dayton Power and Light Company d/b/a AES | 04/11/2024 | |
24-0363-EL-ACP | Discount Power, Inc OH RPS 2023 | 04/11/2024 | |
24-0364-EL-UNC | In the Matter of the Procurement of Percentage of Income Payment Plan Program Generation for Customers of Ohio Power Comppany. | 04/11/2024 | |
24-0365-EL-ACP | bp Energy Retail Company LLC RPS Compliance Filing Report | 04/11/2024 | |
24-0366-EL-FOR | In the Matter of the Long-Term Forecast Report of AMP Transmission, LLC and Related Matters | 04/12/2024 | |
24-0367-EL-ACP | BP Energy Holding Company 2023 RPS Compliance Filing Report | 04/11/2024 | |
24-0368-EL-ACP | Kiwi Energy - RPS RY 2023 | 04/12/2024 | |
24-0369-EL-ACP | 2023 Alternative Energy Report for Calpine Energy Solutions, LLC | 04/12/2024 | |
24-0370-EL-ACP | 2023 Alternative Energy Report for Champion Energy Services, LLC | 04/12/2024 | |
24-0371-EL-ACP | 2023 Alternative Energy Report for North American Power and Gas, LLC
| 04/12/2024 | |
24-0375-EL-ACP | RPS Compliance Report for Interstate Gas Supply, LLC | 04/12/2024 | |
24-0380-EL-ACP | Think Energy, LLC RPS Annual Report | 04/12/2024 | |
24-0381-EL-ACP | SmartEnergy Holdings, LLC | 04/12/2024 | |
24-0383-EL-AEC | In the Matter of the Application of 500 N 4th Street, LLC (d/b/a Standard Power) for the Approval of a Reasonable Arrangement with Ohio Power Company | 04/12/2024 | |
24-0384-EL-ACP | RPS Compliance Filing - AES Solutions Management, LLC | 04/15/2024 | |
24-0385-EL-ACP | Nordic Energy Services, LLC | 04/12/2024 | |
24-0386-EL-ACP | CPV Retail Energy LP RPS Compliance Report for Calendar Year 2023 | 04/15/2024 | |
24-0387-EL-ACP | Realgy LLC - Compliance Year 2023 | 04/15/2024 | |
24-0388-EL-AEC | In the Matter of the Application for Establishment of a Reasonable Arrangement for Chestnut Commerce Center | 04/15/2024 | |
24-0389-EL-RDR | The Dayton Power and Light Company d/b/a AES Ohio - Infrastructure Investment Rider | 05/02/2024 | |
24-0390-EL-ACP | 2023 Archer Energy RPS Report | 04/15/2024 | |
24-0391-EL-ACP | Park Power 2023 RPS Filing | 04/15/2024 | |
24-0392-EL-ACP | Aggressive Energy 2023 RPS Report | 04/15/2024 | |
24-0394-EL-ACP | Great American Power 2023 RPS Compliance Report | 04/15/2024 | |
24-0395-EL-ACP | In the Matter of the Annual Renewable Energy Status Report of Ohio Edison Company, The Cleveland Electric Illuminating Company, and The Toledo Edison | 04/15/2024 | |
24-0396-EL-ACP | AEP Energy RPS Compliance Report for CY2023 | 04/15/2024 | |
24-0397-EL-ACP | Powervine Energy LLC RPS Compliance Report for CY2023 | 04/15/2024 | |
24-0398-EL-ACP | Brookfield Renewable Energy Marketing US 2023 RPS Report | 04/15/2024 | |
24-0399-EL-RDR | Ohio Power Company | 04/15/2024 | |
24-0400-EL-ACP | Energy Harbor LLC RPS Compliance Report for Calendar Year 2023 | 04/15/2024 | |
24-0401-EL-ACP | Ambit Northeast LLC RPS Compliance Report for 2023 | 04/15/2024 | |
24-0402-EL-ACP | Public Power LLC RPS Compliance Report for 2023 | 04/15/2024 | |
24-0403-EL-ACP | Viridian Energy Ohio LLC RPS Compliance Report for CY2023 | 04/15/2024 | |
24-0404-EL-ACP | Viridian Energy PA, LLC RPS Compliance Report for CY2023 | 04/15/2024 | |
24-0405-EL-ACP | Dynegy Energy Services (East), LLC RPS Compliance Report for CY2023 | 04/15/2024 | |
24-0406-EL-ACP | Energy Services Providers LLC RPS Compliance Report for CY2023 | 04/15/2024 | |
24-0408-EL-ACP | Everday Energy LLC RPS Compliance Report for CY2023 | 04/15/2024 | |
24-0412-EL-ACP | TriEagle Energy LP RPS Compliance Report for CY2023 | 04/15/2024 | |
24-0415-EL-ACP | Inspire Energy Holdings, LLC 2023 OH RPS Compliance | 04/15/2024 | |
24-0417-EL-ACP | In the Matter of the Application of Ohio Power Company to Adjust its Adjustment to 2023 Baseline | 04/15/2024 | |
24-0422-EL-ACP | Ohio Power Company RPS Compliance Report for CY2023 | 04/15/2024 | |
24-0423-EL-ACP | Ohio Power Company RPS Compliance Report for CY2023 | 04/15/2024 | |
24-0424-EL-ACP | EcoPlus Power, LLC | 04/15/2024 | |
24-0425-EL-ACP | Santanna Energy Services | 04/15/2024 | |
24-0427-EL-ACP | MP2 Energy NE LLC 2023 RPS Compliance Report | 04/15/2024 | |
24-0433-EL-BNR | South Coshocton – Wooster 138 kV Transmission Line Rebuild Project Phase 1 | 04/16/2024 | |
24-0439-EL-BNR | Beatty – Bixby 345 kV Cut-In Project | 05/02/2024 | |
24-0440-EL-BNR | In the Matter of the Construction Notification Report for American Transmission Systems, Incorporated's Hannah-Highland 345 kV Transmission Line Loop | 05/13/2024 | |
24-0441-EL-BNR | Macy Extension 138 kV Adjustment and Macy-Justice 138 kV Tie Lines #1 and #2 Project | 04/24/2024 | |
24-0443-EL-CSS | Debra A. Baker and Richard A. Baker against Dayton Power and Light Company dba AES Ohio | 04/18/2024 | |
24-0445-EL-RDR | Ohio Edison Company, The Cleveland Electric Illuminating Company, The Toledo Edison Company | 04/19/2024 | |
24-0447-EL-ACP | Catalyst Power & Gas LLC RPS Compliance Filing for CY2022 | 04/22/2024 | |
24-0450-EL-ACP | National Gas & Electric LLC RPS Compliance Report for CY2023 | 04/22/2024 | |
24-0456-EL-UNC | Duke Energy Ohio, Inc. Significantly Excessive Earnings Test 2024 | 05/13/2024 | |
24-0459-EL-ACP | National Gas & Electric LLC RPS Compliance Report for CY2022 | 04/23/2024 | |
24-0460-EL-RPT | RPS Compliance Filing Report | 04/25/2024 | |
24-0461-EL-ACP | Tenaska Power Management LLC RPS Compliance Report for CY2023 | 04/25/2024 | |
24-0465-EL-ATA | In the Matter of the Application of Ohio Power Company to Update its Cogeneration/Small Power Production Tariff. | 04/26/2024 | |
24-0467-EL-RDR | In the Matter the Generation Energy and Generation Capacity riders for Ohio Power Company. | 04/26/2024 | |
24-0468-EL-AIR | In the Matter of the Application of Ohio Edison Company, The Cleveland Electric Illuminating Company and The Toledo Edison Company for an Increase in | 05/01/2024 | |
24-0469-EL-ATA | In the Matter of the Application of Ohio Edison Company, The Cleveland Electric Illuminating Company and The Toledo Edison Company for Tariff Approval | 05/01/2024 | |
24-0470-EL-AAM | In the Matter of the Application of Ohio Edison Company, The Cleveland Electric Illuminating Company and The Toledo Edison Company for Approval to Cha | 05/01/2024 | |
24-0471-EL-UNC | In the Matter of the Application of Ohio Edison Company, The Cleveland Electric Illuminating Company and The Toledo Edison Company for Approval of Mis | 05/01/2024 | |
24-0472-EL-RDR | The Dayton Power and Light Company d/b/a AES Ohio - Distribution Investment Rider | 05/02/2024 | |
24-0475-EL-RDR | In the Matter of the Application of Ohio Power Company to Update its gridSMART Rider Rates. | 04/30/2024 | |
24-0479-EL-CSS | Lynne Pultea against Ohio Edison and Just Energy | 05/01/2024 | |
24-0484-EL-BTA | Althea-Sweetgum 138 kV Transmission Line Project Amendment | 05/02/2024 | |
24-0488-EL-ACP | 2023 Land O'Lakes, Inc. PUCO Annual Report | 05/08/2024 | |
24-0489-EL-WVR | In the Matter of the Application of Ohio Power Company for a Limited Waiver of Ohio Adm. Code 4901:1-18-06(A)(2) | 05/06/2024 | |
24-0490-EL-CSS | Cincinnati Insurance Company and Thomas Huber vs Duke Energy Ohio, Inc. | 05/03/2024 | |
24-0493-EL-RDR | IN THE MATTER OF THE REVIEW OF THE BASIC TRANSMISSION COST RIDER AND PILOT PROGRAM OF OHIO POWER COMPANY | 05/20/2024 | |
24-0494-EL-RDR | The Dayton Power and Light Company dba AES Ohio | 05/31/2024 | |
24-0495-EL-BGN | Eastern Cottontail Solar LLC | 05/08/2024 | |
24-0496-EL-AGG | Application for Energy Analysis Group LLC | 05/13/2024 | |
24-0498-EL-CSS | Annette Goff against AEP Ohio and Dynegy | 05/08/2024 | |
24-0500-EL-FOR | Ohio Valley Electric Corporation | 01/02/2024 | |
24-0501-EL-FOR | AEP Ohio (Ohio Power Company) | 01/02/2024 | |
24-0503-EL-FOR | Duke Energy of Ohio Corporation | 01/02/2024 | |
24-0504-EL-FOR | First Energy Corporation (Ohio Edison Company, The Cleveland Electric Illuminating Company, The Toledo Edison Company) | 01/02/2024 | |
24-0505-EL-FOR | The Dayton Power and Light Company d/b/a AES Ohio | 01/02/2024 | |
24-0508-EL-ATA | Ohio Power Company | 05/13/2024 | |
24-0509-EL-BLN | Bixby-Marion Road 138 kV Transmission Line Relocation Project | 05/17/2024 | |
24-0510-EL-BNR | Bixby-Buckeye Steel 138 kV Structure Replacement Project | 05/17/2024 | |
24-0512-EL-BNR | Tidd-Sunnyside 138 kV Transmission Line Adjustment Project | 05/10/2024 | |
24-0515-EL-UNC | In the Matter of the Determination of the Existence of Significantly Excessive Earnings for 2023 Under the Electric Security Plan of Ohio Edison Compa | 05/13/2024 | |
24-0516-EL-CSS | PATRICIA BENDER against DUKE ENERGY | 05/13/2024 | |
24-0527-EL-UNC | In the Matter of the Application of Ohio Power Company for Administration of the Significantly Excessive Earnings Test for 2023 | 05/15/2024 | |
24-0530-EL-UNC | The Dayton Power and Light Company d/b/a AES Ohio | 05/15/2024 | |
24-0531-EL-CSS | Dr. Lora Elias vs Illuminating Company First Energy | 05/15/2024 | |
24-0535-EL-ACP | Annual Adjustment of the Alternative Compliance Payment for 2024, Pursuant to 4928.64(C)(2)(b), Revised Code | 05/29/2024 | |
24-0542-EL-CSS | Douglas Morgan vs. AEP Ohio | 05/20/2024 | |
24-0547-EL-BNR | Innovation-Brie 138 kV Transmission Line Project | 05/21/2024 | |
24-0548-EL-BNR | Hartman Farms 138 kV Extension No. 3 & No. 4 Transmission Line Project | 06/03/2024 | |
24-0549-EL-RDR | Legacy Generation Resource Rider Update | 05/23/2024 | |
24-0582-EL-RDR | In the Matter of the Alternative Energy Rider and Auction Cost Recovery Rider for Ohio Power Company. | 05/29/2024 | |
24-0585-EL-CSS | Andrea Walczak vs. Clearview Energy | 05/30/2024 | |
24-0586-EL-BLN | Red Run Station, Howard – Fostoria 138 kV Cut-in, and Red Run – Sycamore Creek Solar 138 kV Transmission Line Project. | 06/03/2024 | |
24-0588-EL-USF | Application of the Ohio Development Services Agency for an Order Approving Adjustments to the Universal Service Fund Riders | 05/31/2024 | |
24-0589-EL-AGG | Straightline Energy Consultants, LLC | 05/31/2024 | |
24-0592-EL-CSS | PETE ZOLOTAS VS DUKE ENERGY | 05/31/2024 | |
24-0599-EL-BNR | Miami Fort to Hebron Transmission Line Rebuild | 06/20/2024 | |
24-0600-EL-AGG | Great Lakes Energy Brokers, LLC for certification as an aggregator. | 06/04/2024 | |
24-0603-EL-BTX | In the Matter of the Application of American Transmission Systems, Incorporated for a Certificate of Environmental Compatibility and Public Need for t | 06/07/2024 | |
24-0612-EL-GAG | Village of Rushsylvania | 06/05/2024 | |
24-0622-EL-CSS | Alexandra Latala vs. AEP Ohio | 06/06/2024 | |
24-0625-EL-REN | Seneca Landfill | 06/10/2024 | |
24-0630-EL-BLN | AEP Ohio Transmission Company, Inc. - Adjustments to the Hayden-Roberts 345 kV Cut-in (Beacon Station) Project | 06/12/2024 | |
24-0633-EL-CSS | Isadore Pilart vs. AES Ohio | 06/12/2024 | |
24-0635-EL-PEB | Ohio Power Company/The Frontier Power Company Proposed Reallocation of 26941 Township Road 348 Warsaw | 06/12/2024 | 10/22/2024 |
24-0636-EL-PEB | Ohio Power Company/Holmes-Wayne Electric Proposed Reallocation of 1395 Kada Lane, Wooster. | 06/12/2024 | 10/22/2024 |
24-0637-EL-RDR | IN THE MATTER OF THE ANNUAL REVIEW OF DUKE ENERGY OHIO, INC.’S DISTRIBUTION CAPITAL INVESTMENT RIDER | 07/05/2024 | |
24-0640-EL-BLN | In the Matter of the Letter of Notification Application of Grover Hill Wind, LLC to Adjust the Grover Hill Wind Transmission Facility | 06/13/2024 | |
24-0644-EL-CSS | BRANDIE LANHAM against DUKE ENERGY | 06/17/2024 | |
24-0646-EL-BLN | In the Matter of the Letter of Notification Application by American Transmission Systems, Incorporated for the Knox-Nottingham 138 kV Transmission Lin | 07/15/2024 | |
24-0653-EL-BGA | In the Matter of the Amendment to the Certificate of Environmental Compatibility and Public Need for Arche Solar Project | 06/18/2024 | |
24-0656-EL-UEX | In the Matter of the Application of Duke Energy Ohio, Inc., to Adjust and Set its Electric Uncollectible Recovery Rate Under Rider UE-ED. | 06/28/2024 | |
24-0657-EL-UEX | In the Matter of the Application of Duke Energy Ohio, Inc., to Set its Electric Uncollectible Recovery Rate Under Rider UE-GEN. | 06/28/2024 | |
24-0658-EL-RDR | In the Matter of the Application of Duke Energy Ohio, Inc., to Adjust and Set the Rate for Rider BTR. | 07/15/2024 | |
24-0660-EL-AGG | American Wholesale Energy Inc Competitive Retail Electric Service Provider Application | 06/20/2024 | |
24-0668-EL-BNR | American Transmission Systems, Incorporated for the Gailion-Roberts South 138 kV Transmission Line Loop to Selma Project. | 10/02/2024 | |
24-0670-EL-BNR | Horizon 138 kV Transmission Line Extension Project | 07/03/2024 | |
24-0671-EL-ACP | ConocoPhillips Company (CRES ID 13-717E) RPS Filings for No Retail Sales for Years 2013 - 2023. | 06/25/2024 | |
24-0673-EL-CSS | Lillian Ruffini vs. AEP Ohio | 06/25/2024 | |
24-0676-EL-BNR | Hillsboro - Millwood Park 138 kV Transmission Line Cut-In (south Lucasville Station) Rebuild Project | 07/18/2024 | |
24-0688-EL-BNR | Philo-Crooksville and Philo-Rutland 138 kV Structure Addition Project | 07/03/2024 | |
24-0689-EL-BLN | West Lancaster – South Baltimore – West Millersport 138-kV Transmission Line Rebuild Project | 07/03/2024 | |
24-0690-EL-ACP | Diamond Energy East, LLC - 2023 RPS Compliance Report | 07/01/2024 | |
24-0691-EL-RDR | In the Matter of the Application of Ohio Power Company to Update Its Smart City Rider | 07/01/2024 | |
24-0692-EL-ACP | In The Matter of Great American Gas & Electric RPS Annual Reporting | 07/02/2024 | |
24-0694-EL-CSS | Krista Cross against Ohio Edison | 07/02/2024 | |
24-0701-EL-REN | WWTC Renewable Energy Facility | 07/03/2024 | |
24-0706-EL-BNR | Ebersole – Fostoria Central #2 138 kV Cut-In and Rocky Ford – Border Basin 138 kV Tie Line Project | 09/03/2024 | |
24-0707-EL-BLN | Rocky Ford 138 kV Station Project | 09/03/2024 | |
24-0708-EL-CSS | Jeffrey S. Abney vs. AES Ohio | 07/08/2024 | |
24-0711-EL-BNR | West Mount Vernon – North Waldo 138kV Transmission Line Relocation (Fulton Station) Project | 07/10/2024 | |
24-0717-EL-CSS | John M. Hill vs Duke Energy | 07/10/2024 | |
24-0721-EL-ACP | RPS Report for PBF Power Marketing LLC - 2022 and 2023 | 07/12/2024 | |
24-0723-EL-ACP | Josco Energy USA LLC | 07/15/2024 | |
24-0727-EL-REN | Cuyahoga Generating Facility | 07/16/2024 | |
24-0730-EL-RDR | Ohio Edison Company, The Cleveland Electric Illuminating, The Toledo Edison Company
| 07/18/2024 | |
24-0731-EL-AGG | Southeast Ohio Public Energy Council dba Sustainable Ohio Public Energy Council | 07/16/2024 | |
24-0732-EL-BLN | Astor – East Broad 138 kV Transmission Line Rebuild Project | 07/26/2024 | |
24-0734-EL-AEC | In the Matter of the Application of Ohio Power Company for Approval of a Reasonable Rate Arrangement Under R.C 4905.31 OAC Chapter 4901:1-38 | 07/19/2024 | |
24-0745-EL-CSS | SGRT SUMMIT WOODS LLC VS AP GAS & ELECTRIC | 07/23/2024 | |
24-0752-EL-RDR | In the Matter of the Application of Ohio Power Company to Update Its Enhanced Service Reliability Rider
| 07/29/2024 | |
24-0754-EL-ATA | Ohio Edison Company, The Cleveland Electric Illuminating Company, The Toledo Edison Company | 07/31/2024 | |
24-0755-EL-ACP | CMS Energy Resource Management Company RPS Compliance Filling | 07/30/2024 | |
24-0756-EL-ACP | ETRP 2017 AEC Report | 07/30/2024 | |
24-0763-EL-RDR | In the Matter of the Application of Ohio Power Company to Adjust the Economic Development Cost Recovery Rider Rate. | 07/31/2024 | |
24-0764-EL-ACP | RPS Compliance Filing Report for 2023 Compliance Year | 07/31/2024 | |
24-0768-EL-AIS | The Dayton Power and Light Company d/b/a AES Ohio | 08/02/2024 | |
24-0769-EL-ACP | Energy Transfer Retail Power LLC RPS Compliance Reports 2020-2023 | 08/02/2024 | |
24-0776-EL-CSS | Terence Martter and Lori Martter vs OhioEdison | 08/05/2024 | |
24-0777-EL-AGG | In the Matter of Fairtrade Marketing LLC | 08/05/2024 | |
24-0787-EL-RDR | In the Matter of the Application of Ohio Power Company to Initiate its gridSMART Phase 3 DACR Project | 08/06/2024 | |
24-0791-EL-BLN | Vassell-Green Chapel 345 kV Transmission Line Adjustment Project | 08/07/2024 | |
24-0792-EL-BLN | Vassell-Curleys 345 kV Transmission Line Adjustment Project | 08/13/2024 | |
24-0794-EL-BTA | Amendment #3 to Vigo-Pine Ridge Switch 138 kV Transmission Line Project | 08/21/2024 | |
24-0795-EL-ACP | RPS Compliance Filing Reports 2022, 2023 and 2024 for Enel Energy North America Ohio, LLC | 08/12/2024 | |
24-0796-EL-BNR | Ohio Power Company - Hillsboro-Millbrook Park 138 kV Transmission Line Cut-In (South Lucasville Station) Rebuild Project | 08/12/2024 | |
24-0797-EL-BNR | Ohio Power Company - Badger-Gondor 138 kV Transmission Tie-Lines Project | 08/12/2024 | |
24-0799-EL-PEB | Petition for Reallocation | 08/09/2024 | |
24-0800-EL-CRS | U.S. Power Supply, LLC - CRES Provider Application | 08/26/2024 | |
24-0801-EL-BGN | Grange Solar, LLC | 08/14/2024 | |
24-0809-EL-BNR | In the Matter of the Construction Notice Application by American Transmission Systems, Incorporated for the East Springfield-North Titus 138 kV Transm | 09/30/2024 | |
24-0815-EL-CSS | Esther Jefferson-Moore vs AEP Ohio | 08/15/2024 | |
24-0824-EL-AGG | Application of Ohio Schools Council to Provide Electric Aggregation Service | 08/26/2024 | |
24-0830-EL-BLN | South Point – Portsmouth 138 kV (Millbrook Park – South Point) Rebuild Project | 09/30/2024 | |
24-0837-EL-AGG | CGE Renewables LLC | 08/23/2024 | |
24-0845-EL-BGA | In the Matter of the Application of Firelands Wind, LLC for a Second Amendment to its Certificate Issued in Case No. 18-1607-EL-BGN. | 08/30/2024 | |
24-0849-EL-RPT | Energy Transfer Motion to Correct Annual Reports for Fiscal Assessment 2018 and 2022 | 08/28/2024 | |
24-0850-EL-BLN | Hayden-Hyatt 345 kV Adjustment Project | 09/04/2024 | |
24-0860-EL-BTA | Amendment #3 Pine Ridge Switch-Heppner 138 kV Transmission Line Project | 09/17/2024 | |
24-0865-EL-CSS | Robert A. Kohl vs Toledo Edison | 09/03/2024 | |
24-0867-EL-UNC | In the Matter of the Application of Ohio Edison Company, The Cleveland Electric Illuminating Company, and the Toledo Edison Company to Amend Their Cor | 09/03/2024 | |
24-0878-EL-PEB | Northwestern REC | 09/10/2024 | |
24-0881-EL-BGN | Carnation Solar, LLC | 09/18/2024 | |
24-0882-EL-PEB | In the matter of the Petition for Reallocation of Electric Service Territory | 09/11/2024 | |
24-0883-EL-RDR | Dayton Power and Light Company - Authority to Recover Certain Storm-Related Service Restoration Costs | 10/01/2024 | |
24-0886-EL-CSS | Linda Shatteen vs The Illuminating Company | 09/12/2024 | |
24-0887-EL-BLN | In the Matter of the Letter of Notification Application of Grover Hill Wind, LLC to Modify the Facility Collection Substation Location | 09/12/2024 | |
24-0889-EL-CSS | LaShai L. Wood vs AES Ohio | 09/16/2024 | |
24-0897-EL-CSS | NewGen Legacy Property Services, LP v The Illuminating Company | 09/17/2024 | |
24-0920-EL-RDR | In the Matter of the 2024 Review of the Delivery Capital Recovery Rider of Ohio Edison Company, the Cleveland Electric Illuminating Company, and the T | 10/24/2024 | |
24-0928-EL-BGN | CG Fulton County LLC | 10/02/2024 | |
24-0929-EL-BTX | GC Fulton County LLC | 10/02/2024 | |
24-0935-EL-BNR | Sadiq Switch – East Wheelersburg 138 kV Transmission Line Rebuild Project | 10/16/2024 | |
24-0936-EL-BLN | Celtic 345 kV Extension Project | 10/16/2024 | |
24-0939-EL-AIS | In the Matter of the Application of Ohio Edison Company for Authority to Issue, Renew, or Assume Liability on Notes and Other Evidences of Indebtednes | 10/09/2024 | |
24-0940-EL-AIS | In the Matter of the Application of The Cleveland Electric Illuminating Company for Authority to Issue, Renew, or Assume Liability on Notes and Other | 10/09/2024 | |
24-0941-EL-AIS | In the Matter of the Application of The Toledo Edison Company for Authority to Issue, Renew, or Assume Liability on Notes and Other Evidences of Indeb | 10/09/2024 | |
24-0942-EL-AIS | In the Matter of the Application of American Transmission Systems, Incorporated for Authority to Issue, Renew, or Assume Liability on Notes and Other | 10/09/2024 | |
24-0945-EL-BNR | Sadiq Switch-Texas Eastern 138 kV Transmission Line Project | 10/16/2024 | |
24-0946-EL-BNR | Haviland – North Delphos 138 kV Transmission Line Adjustment Project | 10/17/2024 | |
24-0947-EL-BNR | Haviland-Grover Hill 138 kV Transmission Line Project | 10/17/2024 | |
24-0948-EL-BNR | Fields Ertel, McCauly, and Conrey Roads Transmission Pole Relocation and Replacements | 10/10/2024 | |
24-0960-EL-MER | Joint Application for Limited Change in Control of AES Ohio | 10/09/2024 | |
24-0961-EL-AIS | In the matter of application of Ohio Valley Electric Corporation for authority to issue evidence of short-term indebtedness | 10/10/2024 | |
24-0963-EL-AIS | AEP OHIO TRANSMISSION COMPANY, INC. Application for Authority to Issue Long-Term Debt
| 10/11/2024 | |
24-0964-EL-AIS | AEP Ohio Transmission Company, Inc. Application for Authority to Issue Short-Term Debt | 10/11/2024 | |
24-0965-EL-AGG | Atlas Energy Services Inc. | 10/11/2024 | |
24-0978-EL-BTX | Elliott-Lee 138 kV Transmission Line Rebuild Project | 10/23/2024 | |
24-0986-EL-ACP |
In the Matter of the Annual RPS Compliance Filing Application for the 2023 Compliance Year | 10/21/2024 | |
24-0991-EL-PEB | Pioneer REC
EV Charging Station | 10/23/2024 | |
24-0992-EL-ESS | AEP Ohio (Ohio Power Company) | 01/02/2024 | |
24-0993-EL-ESS | FirstEnergy Corporation (Ohio Edison Company, The Cleveland ELectric Illuminating Company, The Toledo Edison Company) | 01/02/2024 | |
24-0994-EL-ESS | Duke Energy Ohio | 01/02/2024 | |
24-0995-EL-ESS | The Dayton Power and Light Company d/b/a AES Ohio | 01/02/2024 | |
24-0996-EL-ESS | AEP Ohio (Ohio Power Company) | 01/02/2024 | |
24-0997-EL-ESS | FirstEnergy Corporation (Ohio Edison Company, The Cleveland Electric Illuminating Company, The Toledo Edison Company) | 01/02/2024 | |
24-0999-EL-ESS | Duke Energy Ohio, Inc. | 01/02/2024 | |
24-1000-EL-ESS | The Dayton Power and Light Company d/b/a AES Ohio | 01/02/2024 | |
24-1001-EL-ESS | Ohio Valley Electric Corporation | 01/02/2024 | |
24-1006-EL-CSS | Patrick O'Brien against American Electric Power | 10/24/2024 | |
24-1008-EL-CRS | Digital Power USA, Inc. - Competitive Retail Electric Service Provider Application | 10/25/2024 | |
24-1009-EL-AIR | In the Matter of the Application of The Dayton Power and Light Company for an Increase in its Electric Distribution Rates | 10/30/2024 | |
24-1010-EL-AAM | In the Matter of the Application of The Dayton Power and Light Company for Accounting Authority | 10/30/2024 | |
24-1011-EL-ATA | In the Matter of the Application of Dayton Power and Light Company for Approval of Revised Tariffs | 10/30/2024 | |
24-1012-EL-GAG | In the Matter of the Application of Marion County for Certification as an Electric Governmental Aggregator electronically filed by Mr. Mark R. Frye. | 10/28/2024 | |
24-1021-EL-CSS | Anthoney Hill against America Elictric Power | 10/30/2024 | |
24-1501-EL-FOR | AEP Ohio Transco | 01/02/2024 | |
24-2381-EL-BNR | In the Matter of the Construction Notification Report of American Transmission Systems, Incorporated for the Brookside-Henrietta 138 kV Transmission L | 05/17/2024 | |
24-2383-EL-BLN | In the Matter of the Letter of Notification for American Transmission Systems, Incorporated's Leroy Center-Mayfield Q1 and Q2 138 kV Transmission Line | 08/07/2024 | |
24-2384-EL-BNR | Sifford-Ruble 2A 138 kV Transmission Tie-Lines Project | 04/10/2024 | |
24-2385-EL-ACP | RPS Compliance Filing Report of IDT Energy, Inc. | 04/03/2024 | |
24-2386-EL-ACP | RPS Compliance Filing Report of Residents Energy, LLC | 04/03/2024 | |
24-2387-EL-ACP | RPS Compliance Filing Report of Town Square Energy East, LLC | 04/03/2024 | |
24-2388-EL-ACP | LE Energy d/b/a Utility Gas and Power RPS Compliance Filing Report for the 2023 Compliance Year | 04/03/2024 | |
24-2389-EL-ACP | SunSea Energy OH, LLC's Calendar Year 2023 RPS Compliance Filing Report. | 04/04/2024 | |
24-2390-EL-ACP | Eligo Energy OH LLC RPS Compliance Report for CY2023 | 04/10/2024 | |
24-2391-EL-ACP | Calendar Year 2023 RPS Compliance Filing Report for All American Power and Gas OH, LLC. | 04/04/2024 | |
24-2392-EL-ACP | Catalyst Power & Gas LLC RPS Compliance | 04/04/2024 | |
24-2394-EL-ACP | RPS Compliance Filing Report for Pure Energy USA OH, LLC, Calendar Year 2023. | 04/05/2024 | |
24-2396-EL-ACP | Holcim US Inc 2023 RPS Compliance Filing | 04/04/2024 | |
24-7000-EL-FAD | ARCHIVE COMMISSION DOCUMENTS/ELECTRIC | 01/02/2024 | |
25-0004-EL-ACP | 2024 Annual Report | 04/01/2024 | 04/01/2024 |
25-0007-EL-ACP | WGL Energy Services RPS Report for 2023 | 04/01/2024 | 04/01/2024 |