Case Number | Case Title | Open Date | Closed Date |
09-1821-EL-GRD | OHIO EDISON COMPANY/THE CLEVELAND ELECTRIC ILLUMINATING COMPANY/THE TOLEDO EDISON COMPANY | 11/18/2009 | |
18-1595-EL-GRD | IN THE MATTER OF THE POWERFORWARD COLLABORATIVE | 10/23/2018 | |
18-1596-EL-GRD | IN THE MATTER OF THE POWERFORWARD DISTRIBUTION SYSTEM PLANNING WORKGROUP | 10/23/2018 | |
18-1597-EL-GRD | IN THE MATTER OF THE POWERFORWARD DATA AND MODERN GRID WORKGROUP | 10/23/2018 | |
18-1875-EL-GRD | THE DAYTON POWER AND LIGHT COMPANY | 12/21/2018 | |
19-0790-EL-GRD | In the Matter of the Duke Energy Ohio, Inc. Grid Architecture Status Report | 04/01/2019 | |
19-0792-EL-GRD | In the Matter of the Grid Architecture Status Report of Ohio Edison Company, The Cleveland Electric Illuminating Company and The Toledo Edison Company | 04/01/2019 | |
19-0794-EL-GRD | Ohio Power Company | 04/01/2019 | |