Date Filed | Summary | Pages |
04/03/2000 | Memo filed by J. Reinhardt, PUCO staff, with attached memorandum from Mr. Robert J. Reustle, Railroad Division Inspector, verifying the upgrade of track circuits. (2 pgs.) | 2 |
04/03/2000 | Memo filed by J. Reinhardt, PUCO staff, with attached memorandum from Mr. Robert J. Reustle, Railroad Division Inspector, verifying the upgrade of track circuits. | 2 |
04/23/1999 | Communication stating plan and estimates are approved and construction should proceed filed by J. Reinhardt. (6 pgs) | 6 |
03/18/1999 | Entry ordering that the request of Conrail to upgrade the circuitry be granted; that Conrail submit to the Commission site plans and cost estimates for the project within 90 days of this entry; that Conrail proceed with construction of the project following submission of the required site plans, with the installation to be completed by March 25, 2000; that Conrail notify Commission staff at the time the updated warning devices are placed in service so that staff can perform a final project inspection. (2 pgs.) | 2 |
03/10/1999 | Request for approval to upgrade the circuitry of the grade crossing at Main Street grade crossing (MP 147.41, AAR/DOT# 523818S) and Maple Street grade crossing (MP 147.59, AAR/DOT #523817K) of the Chicago Line in Perry, Lake Co., Ohio, filed on behalf of applicant by D. Sands. (1 pg.) | 1 |
03/05/1999 | In the matter of the circuitry upgrade request of the Consolidated Rail Corporation. (2 pgs.) | 2 |
|