02/12/1999
|
Notification that the construction notice meets the informational requirements and the waiver of the 60 day filing time period in granted. Filed by PUCO staff. (1 pg) |
02/09/1999
|
ICN #0002 Motion for waiver of contruction notice require- ments of Rule 4906-5-03(B)(1) O.A.C. filed on behalf of applicant by M. Beiting. (12 pgs.) |
02/09/1999
|
ICN #0001 In the matter of the application of Toledo Edison Company to relocate a 0.15 mile section of the single cir- cuit wood pole Bryan-Edgerton 69 kV transmission line by construction of a 0.16 mile wood pole single transmission line section. (1 pg.) |