Date Filed | Summary | Pages |
11/18/1998 | Revised tariff, PUCO No. 20, Part 4, Section 1, 4th sheet 5, 5th sheet 6, original sheet 6.1, filed on behalf of Ameri- tech Ohio by J. Matz. (4 pgs.) | 4 |
06/23/1997 | Tariff, PUCO No. 20, Part 4, Section 1, 3rd sheet 5; Section 2, 5th sheet 15.2, filed on behalf of Ameritech Ohio by D. McKenzie. (3 pgs.) | 3 |
06/18/1997 | Revised tariff, PUCO No. 6, Check List, 366th sheet 1; Section 2.3, 45th sheet 4, filed on behalf of GTE North by J. Kennedy. (3 pgs.) | 3 |
11/18/1996 | Information response filed on behalf of respondent, Ameri- tech Ohio, by C. Rawlings. (2 pgs.) | 2 |
11/13/1996 | Letter stating that the in-service date for the institution of two-way measured-rate EAS between GTE's Brewster ex- change and the Canton exchange of Ameritech is June 29, 1997 at 12:01 a.m., filed on behalf of GTE North by J. Ken- nedy. (1 pg.) | 1 |
07/18/1996 | Finding & Order approving the petition in its entirety. (5 pgs.) | 5 |
07/17/1996 | Letter stating the calling rate for Brewster to Canton, filed on behalf of respondent, GTE North, by J. Stewart. (1 pg.) | 1 |
05/21/1996 | In the matter of the joint petition of Ameritech Ohio and GTE North Incorporated for approval of the stipulation, agreement and recommendation between and among the Village of Brewster, Ameritech Ohio and GTE North Incorporated for the provision of two-way, non-optional measured rate extended area service between the Brewster exchange of GTE North Incorporated and the Canton exchange of Ameritech Ohio. (12 pgs.) | 12 |
|