01/04/1996
|
Entry closing the case. (2 pgs.) |
10/24/1995
|
Memo stating that corrective action taken by the carrier removing weeds and vegetation has elimated cause for this complaint, filed by T. King, PUCO staff. (1 pg.) |
10/18/1995
|
Letter stating that corrective actions have been taken by defendant CSX Transportation to eliminate the cause of the complaint, and a follow-up inspection report will be docketed in the near future confirming this act, filed behalf of the PUCO staff by W. Wright. (1 pg.) |
10/02/1995
|
Entry scheduling a hearing at 10:00 a.m. on 10/24/95 at the Commission offices; scheduling a prehearing conference at 10:00 a.m. on 10/19/95 at the Commission offices. (AE) (2 pgs.) |
09/12/1995
|
Report filed on behalf of the PUCO staff by T. King. (6 pgs.) |
07/19/1995
|
Complaint letter and copy of complaint mailed to: T.M. Lee, CSX Transportation. (1 pg.) |
07/17/1995
|
In the matter of the complaint of The Co-Operative Legis- lative Committee, United Transportation Union, (vs) CSX Transportation relative to the alleged excessive growth of weeds and vegetation, NA Tower on CSX No. 1 Main Line to Head on Connection at Winton Place, Cincinnati, Ohio. (3 pgs.) |