Date FiledSummaryPages
08/23/1996ICN #0051 Information regarding revegetation of the area previously disturbed by construction filed on behalf of applicant by R. McElfresh. (1 pg.)1
06/10/1996ICN #0050 Letter to Mr. R. McElfresh stating that the engi- neering drawings for the Foster-Lebanon project submitted on June 3, 1996, have been reviewed by the staff, and that they may proceed with construction of the project as depicted by the drawings, filed by K. Wissman, PUCO staff. (1 pg.)1
06/06/1996ICN #0049 Engineering drawings 14W-T11 and 25W-T4 filed on behalf of applicant by R. McElfresh. (3 pgs.)3
01/05/1996Service Notice2
01/05/1996Entry ordering that the applicant's request for expedited process provided under Rule 4906-5-09 (B)(2)(b), O.A.C., is denied. Further ordered that the amendment application be redesignated as Case No. 96-12-EL-BTA, and all future filings be filed under this number.2
09/14/1995ICN #0043 Letter describing the additional erosion control measures to be completed between Fujitec Drive and I-71, filed on behalf of applicant by T. Chaney. (3 pgs.)3
09/14/1995ICN #0042 Letter to Mr. W. Thomas Chaney in response to his transmittal dated August 16, 1995, filed by K. Wissman, OPSB staff. (2 pgs.)2
08/03/1995ICN #0041 Letter to Ms. Darlene S. Radcliffe stating that a portion of the facility represented on the drawings is not consistent with the description of the facility certified in this case, filed by K. Wissman, OPSB staff. (1 pg.)1
08/02/1995ICN #0040 Next three engineering drawings 14W-T11, 25W-T4 25W-TS, filed on behalf of applicant by D. Radcliffe. (1 pg.)1
07/11/1995ICN 0019 Additional information filed on behalf of applicant by W. Chaney. (2 pgs.)2
06/16/1995ICN #0018 Letter in response to the May 2, 1995 letter which references that the erosion control concerns for this project have been satisfactorily addressed, filed by K. Wissman, OPSB staff. (4 pgs.)0
05/19/1995ICN #0017 Information in response to the OPSB letter of April 11, 1995, filed on behalf of applicant by T. Chaney. (96 ps.)0
04/18/1995ICN #0016 Letter to Ms. Darlene S. Radcliffe, CG&E, stating that the company may proceed with the construction of the portion of the project depicted by the engineering draw- ings, filed by K. Wissman, OPSB staff. (1 pg.)0
04/14/1995ICN# 0015 Engineering drawings 27W-T11, 27W-T12 and 27W-T13. filed on behalf of CG&E by D. Radcliffe. (4 pgs)0
04/12/1995ICN #0014 Letter to Mr. W. T. Chaney, CG&E, filed by K. Wissman, PUCO staff. (2 pgs.)0
02/24/1995ICN #0012 Engineering drawings for the project, filed on behalf of applicant by D. Radcliffe. (7 pgs.)0
02/24/1995ICN #0013 Letter stating that the engineering/construction drawings for this project have been reviewed by the OPSB staff, and that applicant may proceed with construction of the portion of the project depicted by the drawings, filed by K. Wissman, OPSB staff. (1 pg.)0
09/28/1994ICN #0010 First four engineering drawings 17W-T1, 17W-T2, 17W-T3, and 28W-T12, filed on behalf of applicant by D. Radcliffe.0
09/28/1994ICN #0011 Letter stating that engineering/construction drawings have been reviewed and CG&E may proceed with construction of the project, filed by K. Wissman, OPSB staff. (1 pg.)0
09/26/1994ICN #0009 Ohio EPA storm water construction permit for the subject project, filed on behalf of applicant by D. Rad- cliffe. (9 pgs.)0
10/25/1993ICN#0028 Entry ordering that the certificate be amended to reflect the amended line route set forth in the amendment application. (OPSB)0
09/15/1993ICN#0027 Proof of Publication filed on behalf of the applicant by W. Chaney.0
08/25/1993ICN #0026 Entry ordering that applicant serve and publish notice of the proposed approval of the amendment within 15 days of this entry. (OPSB)0
08/11/1993ICN #0025 Proof of service for the Foster-Lebanon 138 kV Transmission Line project amendment application, filed on behalf of applicant by W. Chaney.0
07/29/1993ICN# 0024 Amended application to a certificate of environmental compatibility and public need for the Foster-Lebanon 138kV transmission line.0
12/07/1992ICN #0023 Opinion & Order approving the joint stipulation and recommendation in its entirety; that the certificate of environmental compatibility and public need for the project is hereby issued to allow the construction, operation, and maintenance of such facility. (OPSB)0
11/13/1992ICN #0022 Response letter to Mr. & Mrs. Eugene B. Rose, filed on behalf of the PUCO staff by C. Glazer.0
11/04/1992ICN #0021 Transcript filed for hearing held 10/19/92, (RB), 39 pgs., Con't. (Kings Mills, Ohio)0
10/27/1992ICN #0020 Transcript filed for hearing held 10/21/92, (DB), 9 pgs., Submitted.0
10/21/1992ICN #0019 Joint stipulation of findings and recommendations filed on behalf of applicant by D. Musselman and the OPSB staff by M. Malone.0
10/20/1992ICN #0018 Correspondence letter, with attached petition signatures, requesting the Commission to not approve construction of the alternate route through Hamilton Township, filed by C. Baston, O. Bishop, and A. Oeder.0
10/20/1992ICN #0017 Correspondence letter in favor of the line routing which is supposed to go through downtown Maineville, filed by E. Rose.0
10/02/1992ICN #0016 Staff Report filed.0
09/04/1992ICN #0015 Proof of publication filed on behalf of applicant by W. Chaney. (Warren County)0
08/25/1992ICN #0014 Motion to intervene filed on behalf of the Hamilton Township Trustees by C. Baston, O. Bishop, and F. Oeder.0
08/11/1992ICN #0013 1992 Certification letter, dated June 30, 1992, to Mr. W. T. Chaney, Cincinnati Gas & Electric, filed on behalf of the PUCO staff by Chairman Glazer. (FILED 6/30/92)0
08/10/1992ICN #0012 Entry scheduling local public hearing at 7:00 p.m. on 10/19/92 at Kings Mills High School Auditorium, Kings Mills, Ohio; granting the company's motion to amend its application; that the effective date for filing of the application is August 17, 1992; that CG&E publish notice of hearings; non-adjudicatory hearing is scheduled for 7:00 p.m on 10/19/92 in Kings Mills, Ohio; an adjudicatory hearing will commence at 10:00 a.m. on 10/21/92 at the Commission offices. (OPSB)0
07/29/1992ICN#0011 Notice of intervention by the Village of Maineville Ohio, filed by W. Ritchie and J. Detwiler, Mayor.0
07/22/1992ICN #0010 Proof of service for the Foster-Lebanon 138 kV Transmission Line Project, filed on behalf of applicant by W. Chaney.0
07/13/1992ICN #0009 Motion for inclusion of amended pages and additional appendix in the application, filed on behalf of applicant by D. Musselman.0
07/07/1992ICN #0008 Letter regarding statement made on page 11-13 of application regarding a survey for running buffalo clover, filed on behalf of applicant by R. McElfresh.0
07/01/1992ICN #0007 Notice of appearance filed on behalf of the OPSB staff by R. Fowler and M. Malone.0
05/12/1992ICN #0006 Phase I and II investigations of CG&E's proposed Foster-Lebanon Transmission Line, (Preferred and Alternate Alignments), and the proposed Lebanon Substation, Warren County, Ohio, submitted on behalf of applicant by D. Radcliffe.0
04/30/1992ICN #0005 Short-Form Application filed on behalf of applicant by J. Randolph.0
04/20/1992ICN #0004 Entry granting CG&E's request to waive one-year filing requirement set forth in Section 4906.06(A)(6), Revised Code; granting CG&E's request for waiver of the 20 percent limitation set forth in Rule 4906-5-03-(A) (2)(a)(iii), O.A.C. (OPSB)0
04/14/1992ICN #0003 Amended motion for waiver of the R.C. 4905.06(A) and amended memorandum in support filed on behalf of applicant by D. Mussleman.0
04/01/1992ICN #0002 Motion for waiver of OAC 4906-5-03 and memorandum in support filed on behalf of applicant by D. Mussleman.0
04/01/1992ICN #0001 In the matter of the motion for waiver and memorandum in support of the Cincinnati Gas & Electric Company for an Order allowing construction on the electric transmission line between the Foster Substation and Lebanon, Ohio.0