CASE NUMBER: 90-0454-EL-BTX
CASE DESCRIPTION: DAYTON POWER & LIGHT COMPANY
DOCUMENT SIGNED ON: 10/19/2024
DATE OF SERVICE: ________________________________________
06/04/1992 ICN #0027 Letter stating that an application fee has not been submitted, filed on behalf of the OPSB staff by J. Kennedy.
02/27/1991 ICN #0026 Letter filed on behalf of the applicant stating that the construction was completed on January 25, 1991 filed by H. Shamash.
11/20/1990 ICN #0025 Letter stating that construction on this project will begin November 5, 1990, filed on behalf of applicant by H. Shamash.
10/31/1990 ICN #0024 Letter filed on behalf of the OPSB stating that engineering drawings submitted are consistent with the description of the certificated project filed by J. Kennedy.
10/29/1990 ICN #0023 Opinion, Order, and Certificate issued approving the joint stipulation and recommendation and ordering the certificate of Environmental Compatibility and Public Need be issued. (OPSB)
10/24/1990 ICN #0022 Transcript filed for hearing held l0/ll/90, (DC), 4 pgs., Continued.
10/19/1990 ICN #0021 Transcript filed for hearing held 10/12/90, (DC), 6 pgs., Submitted.
10/12/1990 ICN #0020 Joint stipulation and recommendation filed on behalf of staff of OPSB by D. Cox and applicant by E. Rizer.
10/10/1990 ICN #0019 Complete set of engineering drawings for applicant's Logan-Liberty transmission line rebuild project, Circuit 6646 in Logal County, Ohio, filed on behalf of applicant by H. Shamash.
10/04/1990 ICN #0018 Withdrawal of petition for leave to intervene filed on behalf of Buckeye Power, Inc. by R. Mone and T. Lodge.
09/28/1990 ICN #0017 Page 7, which is to replace the original page 7 in the Staff Report filed 9/26/90.
09/26/1990 ICN #0016 Staff report filed.
09/24/1990 ICN #0015 Entry ordering that Buckeye Power Inc.'s petition for leave to intervene is held in abeyance until further notice. (OPSB)
08/31/1990 ICN #0014 Responses to the interrogatories filed on behalf of applicant by E. Rizer.
08/27/1990 ICN #0013 Proof of publication filed.
08/03/1990 ICN #0012 Entry scheduling local public hearing on l0/11/90 at 7:00 p.m. at the City Building, Bellfontaine, Ohio; adjudicatory hearing will commence on l0/12/90 at l0:00 a.m. at the Commission offices; notice of hearings be published by DP&L as set forth in Finding (3). (OPSB)
07/31/1990 ICN #0011 Combined interrogatories and requests for production of documents filed on behalf of the OPSB staff by D. Cox.
07/26/1990 ICN #0010 Letter to Hertzel Shamash, DP&L, from J. Corn, Fluor Daniel, Inc., discussing the plan regarding crossing the Mad River during the rebuild of Circuit 6646.
07/26/1990 ICN #0009 Proof of service of the application filed on behalf of applicant by E. Rizer.
07/24/1990 ICN #0008 Notice of appearance filed on behalf of the OPSB by D. Cox.
07/19/1990 ICN #0007 Letter stating that application for the Logan to Liberty Rebuild (Circuit 6646) From 69 kV to l38 kV has been certified as complete in accordance with Ohio Administrative Code Rule 4905-1-l4 (A) (l) as of July 17, l990, filed on behalf of the OPSB by Chair Butler.
05/25/1990 ICN# 0006 Short for application filed on behalf of the applicant by T. Jenkins.
04/11/1990 ICN #0005 Petition for leave to intervene filed on behalf of Buckeye Power, Inc. by T. Lodge.
03/26/1990 ICN #0004 Entry ordering that DP&L's request for waiver of the one-year filing requirement set forth in Section 4906.06)A)(6), Revised Code, is granted and that DP&L's request for waiver of the requirement of fully developed information on alternate routes and sites, where the information is requested in Chapter 4906-15, OAC, be granted. (OPSB)
03/23/1990 ICN #0003 Correspondence letter filed on behalf of Buckeye Power, Inc. by R. Mone.
03/15/1990 ICN 0002 Motion for waiver of time requirement filed on behalf of the applicant by E. Rizer.
03/15/1990 ICN# 0001 Application of Dayton Power & Light Company for certificate to rebuild existing circuit 6646 from 69kv to 138kv between Logan and Liberty. Request for waiver of full development of alternate transmission line route.