DIS - Case Record for 89-1769-EL-BTX Skip to main content
      
      
CASE NUMBER: 89-1769-EL-BTX
CASE DESCRIPTION: COLUMBUS SOUTHERN POWER COMPANY
DOCUMENT SIGNED ON: 8/16/2024
DATE OF SERVICE: ________________________________________
12/23/1991 ICN #0018 Letter stating that Columbus Southern Power may proceed with construction of the portions of the facility depicted on drawings, filed on behalf of the OPSB staff by J. Kennedy.
12/04/1991 ICN #0017 Set of engineering drawings for the remainder of the underground portion, the terminal site and the overhead portion of the line, filed on behalf of applicant by D. Lowry.
09/27/1991 ICN #0016 Letter stating that the staff has reviewed the engineering drawings submitted on September 26, 1991, and that the project is consistent with the description and construction may begin, filed on behalf of the OPSB staff by J. Kennedy.
09/26/1991 ICN #0015 Construction drawings for the underground portion of this line, filed on behalf of applicant by D. Lowry.
06/27/1990 ICN# 0014 Transcript for hearing held June 12, 1990 (RG) 5 pages, Submitted.
06/27/1990 ICN# 0013 Transcript for public hearing held June 11, 1990 (RG) 3 pages, Continued.
06/25/1990 ICN #0012 Opinion, Order, and Certificate ordering that the joint stipulation and recommendation submitted in this proceeding is hereby approved in its entirety; that Certificate of Environmental compatibility and Public Need for the St. Clair-Vine l38 kV Transmission Line Project is hereby issued to allow the construction, operation, and maintenance of such facility; that the certificate shall contain the conditions set forth in Section III of the Opinion. (OPSB)
06/12/1990 ICN #0011 Joint stipulation and recommendation filed on behalf of Columbus Southern Power by F. Dutton and the OPSB staff by D. Cox.
05/29/1990 ICN# 0010 Check for application fee filed on behalf of the applicant by J. Haunty.
05/25/1990 ICN# 0009 Staff report filed.
05/17/1990 ICN #0008 Proof of publication filed on behalf of Columbus Southern Power Company by J. Haunty. (Franklin County)
05/03/1990 ICN #0007 Notice of appearance filed on behalf of OPSB by M. Malone.
04/11/1990 ICN #0006 Entry scheduling hearing on 6/11/90 at 7:00 p.m. and adjudicatory hearing on 6/12/90 at l0:00 a.m., both to be held at the offices of the Commission; notice of hearings be published by CSP as set forth in Finding 3. (OPSB)
04/09/1990 ICN #0005 Letter with copy of the Certificate of Service and a cover letter of transmittal which includes a statement as to when notice of intervention must be filed, filed on behalf of applicant by J. Reeves.
03/29/1990 ICN #0004 Letter stating that the application for the St. Clair to Vine Station l38 kV Transmission Line received 2/14/90 has today been certified as complete in accordance with OAC Rule 4906-l-l4 (A)(l), filed on behalf of the OPSB by Chair J. Butler.
02/14/1990 ICN# 0003 Application of Columbus Southern Power for a 138kV transmission line from St. Clair to Vine.
12/11/1989 ICN# 0002 Entry granting Columbus Southern Power's request for a waiver of the twenty percent requirement. (OPSB)
11/28/1989 ICN# 0001 Application of Columbus Southern Power Company for a request to waive the requirement of rule 4906-5-03, (A) (2)(B)(3).O.A.C.