DIS - Case Record for 88-1115-GE-PIP Skip to main content

Case Record For:

88-1115-GE-PIP

File a Public Comment
Case Title: PIP PLAN
Status: AR-Archived
Industry Code: GE-GAS & ELECTRIC
Purpose Code: PIP-Percentage Income Plan
Date Opened: 7/27/1988
Date Closed: 12/2/1993
Printable Docket Card Service List
View per page
Date FiledSummaryPages
10/19/1994Oscar report filed on behalf of the PUCO staff by P. Col- bert. (13 pgs.)0
01/13/1994Letter of agreement filed on behalf of the PUCO staff by P. Colbert; General Motors Corp by S. Randazzo; and DP&L by D. George.0
01/03/1994Application for rehearing filed on behalf of General Motors Corp. by S. Randazzo.0
12/30/1993Letter listing the changes that are intended to be made in the current PIPP-related accounting procedures, filed on behalf of West Ohio Gas by R. Wardell.0
12/29/1993Letter listing the changes to be made in their PIPP-related procedures, filed on behalf of East Ohio Gas and River Gas by B. Klink.0
12/15/1993Letter notifying the Commission that Columbia Gas of Ohio, Inc. is changing its current PIPP-related accounting procedures effective December 15, 1993, which are attached as Attachment I, filed by A. Roth.0
12/07/1993Proof of Publication filed. (Cuyahoga County)0
12/07/1993Proof of Publication filed. (Erie County)0
12/02/1993Finding & Order adopting the stipulation and recommen- dation and closing this case.0
12/02/1993Finding & Order adopting the stipulation and recommendation and closing this case.22
11/29/1993Proof of Publication filed (Mahoning)0
11/10/1993Proof of Publication filed. (Scioto County)0
11/10/1993Proof of Publication filed. (Marion County)0
11/08/1993Proof of Publication filed. (Richland County)0
10/25/1993Proof of Publication filed. (Athens County)0
10/22/1993Proof of Publication filed. (Summit County)0
10/20/1993Post hearing brief filed on behalf of IEC by L. Bell.0
10/20/1993Supplemental brief filed on behalf of East Ohio Gas, River Gas Co., and West Ohio Gas by H. Liebman.0
10/20/1993Hearing brief filed on behalf of DP&L by T. Rice.0
10/20/1993Brief filed on behalf of Columbus Southern Power by F. Dutton and Ohio Power Co. by R. Cohen.0
10/20/1993Brief filed on behalf of the Greater Cleveland Welfare Rights Organization by J. Meisner; Appalachian Peoples Action Coalition by M. Smalz; the PUCO staff by P. Col- bert; East Ohio Gas, River Gas, and West Ohio Gas by H. Liebman; and Columbia Gas by A. Roth.0
10/20/1993Brief filed on behalf of OCC by Y. Ranft.0
10/20/1993Post-hearing brief filed on behalf of CG&E by R. Grieme.0
10/20/1993Memorandum in support of proposed stipulation and side agreement with Dayton Power & Light, filed on behalf of the Legal Aid Society of Dayton by S. Hirtle.0
10/20/1993Brief filed on behalf of Ohio Edison by J. Burk.0
10/20/1993Brief by the Centerior Energy Corp. filed on behalf of CEI and Toledo Edison by M. Regulinski.0
10/15/1993Proof of Publication filed. (Stark County)0
10/15/1993Transcript filed for hearing held 10/14/93, (SD), 73 pgs., Submitted. (Volume IV)0
10/15/1993Transcript filed for hearing held 10/12/93, (SD), 158 pgs., Con't. (Volume III)0
10/15/1993Transcript filed for hearing held 10/8/93, (SD), 181 pgs., Con't. (Volume II)0
10/15/1993Transcript filed for hearing held 10/7/93, (SD), 172 pgs., Con't. (Volume I)0
10/14/1993Proof of Publication filed. (Jefferson County)0
10/12/1993Proof of Publication filed. (Hamilton County)0
10/12/1993Proof of Publication filed. (Franklin County)0
10/12/1993Proof of Publication filed. (Lucas County)0
10/12/1993Proof of Publication filed. (Cuyahoga County)0
10/12/1993Proof of Publication filed. (Washington County)0
10/08/1993Proof of Publication filed. (Tuscarawas County)0
10/08/1993Proof of Publication filed. (Montgomery County)0
10/05/1993Comments in opposition to the stipulation and side agree- ments, filed on behalf of IEC by L. Bell. (FILED 10/4/93)0
10/05/1993Signature of a non-objecting party to the stipulation, filed on behalf of the PUCO staff by P. Colbert.0
10/05/1993Motion to strike certain objections filed by The Industrial Energy Consumers and memorandum in support filed on behalf of the PUCO staff by P. Colbert.0
10/04/1993Signature of non-objecting party to stipulation, filed on behalf of the PUCO staff by P. Colbert.0
10/04/1993Reservation of rights to present testimony and conduct cross-examination, filed on behalf of Columbus Southern Power by F. Dutton; DP&L by T. Rice; Centerior Energy Services, CEI, and Toledo Edison by M. Regulinski; Monon- gahela Power by G. Jack; Ohio Power by R. Cohen; and CG&E by R. Grieme.0
10/04/1993Objection to the PIP settlement stipulation, filed on behalf of Ohio Edison Co. by J. Burk.0
09/29/1993FAXED Legal Notices to newspapers.0
09/28/1993Letter memorializing the agreement regarding the proposed state-wide stipulation and recommendation, and approved by P. Colbert, PUCO staff, filed on behalf of DP&L by T. Rice.0
09/28/1993Separate stiupulation and recommendation filed on behalf of Greater Cleveland Welfare Rights Organization by J. Meissner; the PUCO staff by P. Colbert; CEI and Toledo Edison by M. Regulinski; and OCC by Y. Ranft.0
09/27/1993Additional signatures representing approval of the stipu- lation, submitted by P. Colbert, PUCO staff.0
09/24/1993Stipulation and Recommendation.25
09/24/1993Stipulation and recommendation filed on behalf of the PUCO staff by P. Colbert; APAC by M. Smalz; C. Pavalko, Jr.; Columbus Southern Power by J. Reeves; Ohio Power by R. Cohen; T. Rice; CG&E by R. Grieme; Arlington Natural Gas, Orwell Natural Gas, Sheldon Gas, Swickard Gas, Suburban Natural Gas, and Waterville Gas & Oil by D. Pemberton; the Legal Aid Society of Dayton by E. Huttle; OCC by Y. Ranft; J. Meisner; and M. Regulinski.25
09/24/1993Stipulation and Recommendation submitted.9
09/24/1993Entry scheduling a hearing at 10:00 a.m. on 10/7/94 at the Commission offices; parties should file exceptions to objections to the stipulation and any or all of the side agreements by 10/4/93. (AE)0
09/24/1993Stipulation and recommendation filed on behalf of the PUCO staff by P. Colbert; APAC by M. Smalz; C. Pavalko, Jr.; Columbus Southern Power by J. Reeves; Ohio Power by R. Cohen; T. Rice; CG&E by R. Grieme; Arlington Natural Gas, Orwell Natural Gas, Sheldon Gas, Swickard Gas, Suburban Natural Gas, and Waterville Gas & Oil by D. Pemberton; the Legal Aid Society of Dayton by E. Huttle; OCC by Y. Ranft; J. Meisner; and M. Regulinski.0
09/24/1993Stipulation and recommendation filed on behalf of the Legal Aid Society of Dayton, Inc. by E. Huttle; DP&L by T. Rice; OCC by Y. Ranft; and the PUCO staff by P. Colbert.0
05/29/1990Letter requesting approval of an Interim Emergency and Temporary PIP Plan Tariff Schedule Rider filed on behalf of Eastern Natural Gas by R. Park.0
01/02/1990Staff Reply Memorandum to OCC Memorandum Contra Staff Motion to Strike Objections filed by J. Gainer.0
12/26/1989OCC's memorandum contra Staff's motion to strike OCC's objections to the stipulation filed by T. Atzberger.0
12/07/1989Staff motion to strike OCC's objections to the stipulations of August 16, 1989 and August 22, 1989 filed by J. Gainer.0
12/04/1989Comments of the responses to OCC's objections to the stipulations filed by Dayton Power and Light Company, and East Ohio, West OHio and River Gas Companies filed on behalf of OCC by T. Atzberger.0
11/28/1989Response of the East Ohio Gas Company, West Ohio Gas Company and the River Gas Company to the objections of OCC to the stipulations of August 16, 1989 and August 22, 1989 filed by C. Kennedy.0
11/24/1989Memorandum contra OCC's objections to the stipulations of 8/16/89 and 8/22/89 filed on behalf of Dayton Power & Light by E. Rizer.0
11/08/1989Objections to the stipulations of August 16, 1989 and August 22, 1989 filed on behalf of OCC by T. Atzberger.0
10/17/1989Entry denying application for rehearing filed by OCC and requiring OCC file its objections to the stipulation by 11/8/89.0
10/12/1989Notice of withdrawal of Point 2 of OCC's application for rehearing filed September 29, 1989, filed by T. Atzberger.0
10/12/1989Memorandum of Ohio Power Company opposing the application for rehearing of the Office of the Consumers' Counsel filed by R. Cohen.0
10/11/1989Memorandum of The East Ohio Gas Company, West Ohio Gas Company, and The River Gas Company opposing the application for rehearing of the Office of the Consumers' Counsel filed by C. Kennedy.0
10/11/1989Revised tariff sheets, PUCO No. 12, filed by G. Prokesh on behalf of Cleveland Electric Illuminating Company.0
10/10/1989Memorandum contra of Columbia Gas of Ohio, Inc. the applica- tion for rehearing of The Office of Consumers' Counsel filed S. Seiple.0
10/10/1989Memorandum contra of CEI and Toledo Edison to the OCC's application filed by C. Spencer.0
10/10/1989Memorandum contra the application for rehearing of the Office of Consumers' Counsel filed by Ed. Rizer on behalf of the Dayton Power & Light Company.0
10/10/1989Columbus Southern Power Company's memorandum contra to the Office of Consumers' Counsel application for rehearing filed by F. Mitchell Dutton.0
10/10/1989Notice of change of attorney filed by C. Spencer on behalf of Centerior Energy Corporation.0
09/29/1989Application for rehearing filed on behalf of OCC by T. Atzberger.0
09/13/1989Letter filed by D. Marshall on behalf of The Cincinnati Gas & Electric Company, in regards that a tariff filing is not required as the rates referenced in the order for CG&E are currently in effect for both the gas and electric interim emergency and temporary PIPP riders and on file with the Commission.0
09/11/1989OCC's reply memorandum to the memoranda contra of Staff, The Dayton Power and Light Company and Columbia Gas of Ohio, Inc. filed on behalf of OCC by T. Atzberger.0
09/05/1989Memorandum contra of Columbia Gas of Ohio, Inc., filed by K. Christman.0
09/05/1989Reply Memorandum of The Office of The Consumers' Counsel filed by T. Atzberger.0
09/05/1989Memorandum of The Dayton Power and Light Company filed by Ed. Rizer.0
09/01/1989Staff memorandum contra OCC motion for a procedural order and OCC motion for leave to file objections and OCC request for ruling on pending motion filed by J. Gainer on behalf of the PUCO staff.0
09/01/1989Revised tariff sheets, PUOC No. 7, filed by G. Brengartner on behalf of Toledo Edison Company.0
08/30/1989Opinion & Order issued granting the motion for expedited ruling filed by the staff on 8/16/89 and 8/22/89; Ordering each company that has established its currently effective tariff in its assigned TRF docket, file approved final tariffs with the tariff section of the docketing division of the Commission.0
08/28/1989Certificate of service and service list filed on behalf of The East Ohio Gas Company, West Ohio Gas Company and The River Gas Company by H. Liebman.0
08/25/1989Memorandum of the East Ohio Gas Company, West Ohio Gas Company and the River Gas Company contra motion of OCC for procedural order and for leave to file objections and in opposition to the suggestion of the staff that a hearing be held on the reasonableness of the stipulation and recommendation filed by H. Liebman.0
08/22/1989Stipulation and Recommendation filed on behalf of following as listed below: Nancy McClenaghan/The East Ohio Gas Company Nancy McClenaghan/The River Gas Company Kathryn Schroyer/Columbia Gas of Ohio, Inc. Michael Gribler/Cincinnati Gas & Electric Company Samuel Randazzo/Pike Natural Gas Company Nancy McClenaghan/West Ohio Gas Company Edward Rizer/Dayton Power & Light Company P.M. Donahue/The Ohio Valley Gas Corporation Samuel Randazzo/Ohio Gas Company Jim Gainer/The Public Utilities Commission of Ohio0
08/22/1989Staff motion for an expedited ruling putting the stipulated PIP riders into effect immediately subject to the outcome of a hearing on the reasonableness of the stipulation and recommendation filed by J. Gainer.0
08/18/1989The Office of The Consumers' Counsel's motion for a procedural order, and for leave to file objections, and request for ruling on pending motion filed by T. Atzberger.0
08/16/1989Staff Motion for an expedited ruling putting the stipulated PIP Riders into effect immediately subject to the outcome of a hearing on the reasonableness of the stipulation and recommendation filed by J. Gainer.0
08/14/1989Stipulation and Recommendation filed on behalf of following parties: Cleveland Electric Illuminating Company/D. Whitehead Cincinnati Gas & Electric Company/M. Gribler Columbus Southern Power Company/M. Dutton Dayton Power & Light Company/E. Rizer Monongahela Power Company/G. Jack Ohio Edison Company/A. Alexander Ohio Power Company/R. Cohen Toledo Edison Company/D. Whitehead PUCO Staff/J. Gainer0
07/21/1989Revised application filed by A. Alexander on behalf of Ohio Edison Company.0
06/16/1989Staff report filed0
04/27/1989Request for Percentage of Income Payment Plan filed by D. Whitehead on behalf of Centerior Energy Corporation.0
04/18/1989Entry denying OCC's application for rehearing.0
04/17/1989OCC's consolidated reply memorandum for memoranda contra of Ohio Edison Company, Dayton Power & Light Company, and Columbia Gas Ohio, Inc., filed by D. Bergmann.0
04/11/1989Response of Columbia Gas of Ohio, Inc. to OCC's motion to sever, motion for a clarifying order, and memorandum contra filed by K. Christman.0
04/10/1989DP&L's Memorandum contra OCC's motiin to sever and motion for a clarifying order and memorandum in support and memorandum contra the revised application and statement of Columbia Gas of Ohio, Inc., filed by Ed. Rizer.0
04/07/1989Ohio Edison's response to OCC's motion for a clarifying order and memorandum contra filed by M. Beiting on behalf of Ohio Edison Company.0
04/05/1989Memorandum of The East Ohio Gas Company, The River Gas Company and West Ohio Gas Company opposing the application for rehearing of the Office of the Consumers' Counsel filed by C. Kennedy.0
04/04/1989Memorandum in opposition filed by M. Gribler on behalf of The Cincinnati Gas & Electric Company.0
04/03/1989Memorandum contra of The Cleveland Electric Illuminating Company and The Toledo Edison Company to the Office of Consumers' Counsel's application for rehearing filed by D. Whitehead and C. Spencer.0
04/03/1989Response to Staff information request No. 8, filed by K. Shroyer on behalf of Columbia Gas of Ohio, Inc.0
04/03/1989Response to application for rehearing filed by R. Cohen on behalf of Ohio Power Company and M. Dutton on behalf of Columbus Southern Power Company.0
04/03/1989Memorandum contra of Columbia Gas of Ohio, Inc. to the office of Consumers' Counsel's application for rehearing filed by S. Seiple.0
04/03/1989Ohio Edison's response to application for rehearing filed by M. Beiting.0
04/03/1989Response to Consumers' Counsel's application for rehearing filed by G. Jack on behalf of Monongahela Power Company.0
04/03/1989Memorandum contra of The Dayton Power and Light Company to OCC's application for rehearing filed by Ed. Rizer.0
03/24/1989Application for Rehearing filed by T. Atzberger on behalf of OCC.0
03/24/1989OCC's motion to sever and motion for a clarifying Order and memorandum in support and memorandum contra the revised application and statement of Columbia Gas of Ohio, Inc., filed by T. Atzberger.0
03/24/1989OCC's motion to sever and motion for a clarifying Order and memorandum in support and memorandum contra the revised application and statement of Columbia Gas of Ohio, Inc., filed by T. Atzberger.13
02/22/1989Corrected data request filed by S. Randazzo on behalf of Ohio Gas Company.0
02/22/1989Entry ordering all affected electric and gas utilities continue to provide the emergency PIP Plan and the Interim Emergency and Temporary PIP Plan alterative service continue to be made available until long-term solutions are in place.5
02/22/1989Entry ordering all affected electric and gas utilities continue to provide the emrgency PIP plan and the Interim Emergency and Temporary PIP Plan Alternative service continue to be made available until long-term solutions are in place.0
02/21/1989Staff report filed by the PUCO staff.37
02/21/1989Staff report filed by the PUCO staff.0
02/09/1989Motion to Intervene filed by T. Atzberger on behalf of OCC.0
02/08/1989Final Responses to the Data Requests filed by S. Randazzo on behalf of Ohio Gas Company.0
01/31/1989Supplemental data response filed on behalf of Dayton Power & Light Co. by J. Jensen.0
01/25/1989Responses of West Ohio Gas Company to Commission Staff's Data Requests filed by P. Ruxin.0
01/25/1989Response of The East Ohio Gas Company to Commission Staff's data request filed by P. Ruxin.0
01/25/1989Responses of The River Gas Company to Commission Staff's data requests filed by P. Ruxin.0
01/25/1989Response to the first set of data requests, filed by G. Brengartner on behalf of Toledo Edison Company.0
01/25/1989Ohio Edison's Supplemental Response to staff data request of December 15, 1988, filed by M. Beiting.0
01/25/1989Response of Ohio Power Company filed by R. J. Pelger.0
01/25/1989The Cleveland Electric Illuminating Company's updated responses to PUCO staff data request, filed by D. White- head.0
01/25/1989Response filed by G. Hersey on behalf of Pike Natural Gas Company.0
01/25/1989Response filed by G. Jack on behalf of Monongahela Power Company.0
01/25/1989Letter filed by P. McGonagle on behalf of National Gas & Oil Corporation, informing the Commission at this time National does not have a PIP Tariff Rider.0
01/25/1989The Dayton Power and Light Company's Responses to PUCO Staff Data Request filed by Ed. Rizer.0
01/25/1989Infomormation as requested filed by K. Shroyer on behalf of Columbia Gas of Ohio, Inc.0
01/25/1989Supplemental Response of Eastern Natural Gas Company to December 15, 1988 Staff Data Request, filed by S. Howard.0
01/23/1989Information filed on behalf of the Ohio Cumberland Gas Company by M. Ramser.0
01/23/1989Ohio Valley Gas Corporation's application for an original Interim Emergency and Temporary tariff schedule PIP Plan Rider filed by P. Donahue.0
01/20/1989West Millgrove Gas Company's response to PUCO data request filed by M. Ramser.0
01/18/1989Response of Columbus Southern Power Company to staff data request filed by M. Dutton.0
01/17/1989Initial response filed on behalf of the Toledo Edison Company filed by G. Brengartner.0
01/13/1989Data response filed on behalf of Cleveland Electric Illuminating Company filed by D. Whitehead.0
01/09/1989Letter filed on behalf of the Piedmont Gas Company stating that they do not include a PIP rider on the tariff schedule filed by J. Mako.0
01/06/1989Response from Data Request filed by G. Jack on behalf of Monongahela Power Company.0
01/06/1989Initial Response of Eastern Natural Gas Company to December 15, 1988 Staff Data Request filed by S. Howard.0
01/06/1989Response letter filed by K. Shroyer on behalf of Columbia Gas of Ohio, Inc.0
01/06/1989Letter filed on behalf of the Swichard Gas Co. stating that they have no tariff rider to collect PIP arrearages filed by C. Weber.0
01/05/1989Response to data request filed by D. Marshall on behalf of The Cincinnati Gas & Electric Company.0
01/05/1989Response by Columbus Southern Power Company filed by Wm. Forrester.0
01/05/1989Data responses filed by R. J. Pleger on behalf of Ohio Power Company.0
01/05/1989Reply to request for information filed by J. Malicoat on behalf of Pike Natural Gas Company.0
01/05/1989Ohio Edison Company's response to staff Data Request of December 15, 1988, filed by M. Beiting.0
01/05/1989Letter filed by S. Howard on behalf of Eastern Natural Gas Company, informing the Commission that the company does not propose a PIPP Interim Emergency and Temporary Tariff Schedule Rider.0
01/05/1989Response to data request filed by S. Randazzo on behalf Ohio Gas Company.0
12/30/1988Entry ordering that a twenty-day extension of time in which to provide the required data is granted to all gas, natural gas, and electric utilities; Ordering that all affected companies submit as much of the information requested in the Commission's December 15, 1988 Entry as is available by 1/5/89. (AE)0
12/22/1988Joint motion for extension of time file on behalf of Columbus Southern Power, CEI, Toledo Edison, Ohio Power, Ohio Edison, Monongahela Power, DP&L, and Cincinnati Gas and Electric.0
12/22/1988Request for extension to time to file on behalf of the Ohio Gas Association (OGA) and all affected members filed by D. Pemberton.0
12/15/1988Entry adopting the staff proposeal for gathering information as contained on attachment to this entry and ordering each affected utility comply with the requirements within 21 days.0
07/27/1988In the Matter of the Reveiw of the Interim Emergency and Temporary PIP Plan Riders contained in the approved rate schedules of Electric and Gas Companies.0