DIS - Case Record for 86-2275-EL-BTX Skip to main content
      
      
CASE NUMBER: 86-2275-EL-BTX
CASE DESCRIPTION: OHIO EDISON COMPANY
DOCUMENT SIGNED ON: 5/10/2024
DATE OF SERVICE: ________________________________________
10/16/2000 ICN #0002 Entry ordering that the listed certificates of environmental compatibility and public need previously granted to OE, TE, and CEI for the construction and opera- tion of numerous electric transmission facilities (and associated transmission facilities) shall be transferred to ATSI; that, as a result of these transfers, ATSI shall be bound by and comply with all terms and conditions of these certificates.
10/16/2000 ICN #0002 Entry ordering that the listed certificates of environmental compatibility and public need previously granted to OE, TE, and CEI for the construction and opera- tion of numerous electric transmission facilities (and associated transmission facilities) shall be transferred to ATSI; that, as a result of these transfers, ATSI shall be bound by and comply with all terms and conditions of these certificates
10/16/2000 ICN #0029 Entry ordering that the listed certificates of environmental compatibility and public need previously granted to OE, TE, and CEI for the construction and opera- tion of numerous electric transmission facilities (and associated transmission facilities) shall be transferred to ATSI; that, as a result of these transfers, ATSI shall be bound by and comply with all terms and conditions of these certificates. (6 pgs.)
08/07/1992 ICN #0028 Information response filed on behalf of applicant by T. Burgess.
05/28/1992 ICN #0027 Semi-annual report of citizen complaints and equipment problems, stating that the previous six months of operation (November 1, 1991 - April 30, 1992) had no citizen complaints or equipment problems associated with this project, filed on behalf of applicant by T. Burgess.
01/03/1992 ICN #0026 Second semi-annual report of citizen complaints and equipment problems that may occur during the two-year period of initial operation, filed on behalf of applicant by T. Burgess.
08/06/1991 ICN #0025 First semi-annual report of citizen complaints and equipment problems, filed on behalf of applicant by T. Burgess.
12/13/1990 ICN #0024 Letter filed on behalf of the applicant stating that the transmission line tap was completed on November 20, 1990 filed by T. Burgess.
11/16/1989 ICN# 0023 Letter filed by J. Kennedy on behalf of the OPSB stating that the transmission lines are consistent to the application, and construction may proceed.
11/09/1989 ICN# 0022 Engineering drawings filed on behalf of the applicant by T. Burgess.
12/14/1987 ICN. #0021 Opinion, Order, and Certificate issued, Ordering that the Administrative Law Judge's Report and Recommenda- tions be adopted within the Board's order and certificate in this case as though fully restated therein; Ordered that Ohio Edison Company comply with all applicable laws and regulations in this matter and with all conditions contained within the joint stipulation adopted herein. (AE)
12/14/1987 ICN. #0020 Comments to report and recommendations of administrative law judge filed by T. Kayuha on behalf of applicant.
12/10/1987 ICN. #0019 Comments of Staff of Ohio Power Siting Board on report and recommendations of administration law judge filed by J. Payne, Jr.
11/24/1987 ICN# 0018 Report and recommindations of ALD filed by E. Cruttenden.
11/03/1987 ICBN. #0016 Joint Stipulation of Findings and Recommenda- tions filed by T. Kayuha on behalf of applicant and M. Malone on behalf of the PUCO staff.
11/03/1987 Trans., for hearing held on 10/28/87, (OL) Submitted Vol. I, 1-6 pages.
10/26/1987 ICN# 15 Notice of appearance filed on behalf of the Attorney General by P.Malone and J. Payne, Jr.
10/13/1987 ICN. #0014 Staff Report of Investigation and Recommended Findings.
10/01/1987 ICN. #0013 Proof of Publication/Warren Tribune Chronicle (County/Trumbull)
09/29/1987 INC. #0012 Response for additional information as requested filed by C. H. Fleming, Manager on behalf of applicant.
09/01/1987 ICN. #0011 Letter filed by Chairman Chema, to Mr. L. Firestone, RE: to application has been accepted for filing with the Board, the effective date is 8/26/87.
08/12/1987 ICN. #0010 Affidavit of Service lists the name, address, telephone number and official title of each person who is being served a copy of the application, filed by L. Fire- stone on behalf of applicant.
07/17/1987 ICN# 0009 Letter filed on behalf of the Commission stating that the application is complete and that Ohio Edison now has to file the certified application.
07/14/1987 ICN# 0008 Letter granting the request for waiver filed on behalf of the applicant by J. Kennedy.
06/01/1987 ICN# 0007 Revisied table 07-2 to short form application filed on behalf of Ohio Edison Company by T. Burgess.
05/18/1987 Short form application for Certification of the Central- Packard to Cortland 138kV project Trumbull County, Ohio filed by L. Firestone.
05/12/1987 ICN# 0005 Request to waiver the requirement of rule 4906-5-03 (A) (2) (a) (iii) O.A.C. filed on behalf of Ohio Edison by T. Kayuha.
01/07/1987 ICN. #0004 Memo from J. Borrows, Director Utilities Department, PUCO, Relative to assignment of Litigation Counsel for this matter.
12/31/1986 ICN. #0003 Letter filed by T. C. Burgess on behalf of applicant, Relative to application fee.
12/29/1986 ICN. #0002 Copy of opening remarks from conference held 12/19/86 and list of attendees filed by R. Stamper.
12/09/1986 ICN. #0001 Request for Pre-Application Conference Central Packard 138 kV Transmission Line Tap to Cortland Substation