CASE NUMBER: 23-0785-EL-BNR
CASE DESCRIPTION: Beaver-Black River 138 kV Transmission Line Tap to Serve AMPT Project
DOCUMENT SIGNED ON: 11/22/2024
DATE OF SERVICE: ________________________________________
03/18/2024 Letter of Notification advising construction was completed January 24, 2024 electronically filed by Mr. Lawrence B. Hughes on behalf of American Transmission Systems, Inc..
09/13/2023 Service Notice - Staff Report.
09/13/2023 Staff Report of Investigation electronically filed by Mr. Jason Cross on behalf of Staff of OPSB.
09/12/2023 ATSI's Response to First Set of Data Requests from OPSB Staff electronically filed by Mr. Lawrence B. Hughes on behalf of American Transmission Systems, Inc.
09/11/2023 Notice of Substitution of Counsel electronically filed by Ms. Devan K. Flahive on behalf of American Transmission Systems Incorporated.
08/29/2023 Notice of Construction electronically filed by Ms. Devan K. Flahive on behalf of American Transmission Systems Incorporated.
08/22/2023 In the Matter of the Pre-Application Notification Letter for the Beaver-Black River 138 kV Transmission Line Tap to Serve AMPT Project electronically filed by Ms. Devan K. Flahive on behalf of American Transmission Systems Incorporated.