DIS - Case Record for 20-1363-EL-BLN Skip to main content
      
      
CASE NUMBER: 20-1363-EL-BLN
CASE DESCRIPTION: Eber-Swanton 138 kV Second Tap to Johnson Controls Substation Project
DOCUMENT SIGNED ON: 9/18/2024
DATE OF SERVICE: ________________________________________
07/16/2021 Construction Completion Notification Letter electronically filed by Ms. Devan K Flahive on behalf of American Transmission Systems Incorporated.
12/23/2020 Notice of the Commencement of Construction of Project electronically filed by Mr. Robert J Schmidt on behalf of American Transmission Systems Inc.
09/10/2020 Service Notice.
09/10/2020 Staff Report of Investigation electronically filed by Mr. Matt Butler on behalf of Staff of OPSB.
08/27/2020 Proof of Pub of Notice of the Filing of the Letter of Notification Application with the Board electronically filed by Mr. Robert J Schmidt on behalf of American Transmission Systems Inc.
08/20/2020 Letter of Notification Application electronically filed by Mr. Robert J. Schmidt on behalf of American Transmission Systems Inc.
08/12/2020 In the matter of the filing of the Pre-Application Notification Letter for Project electronically filed by Mr. Robert J Schmidt on behalf of American Transmission Systems Inc.