07/15/2024 | Compliance with Condition 10 – 2024 Second Quarter Complaint Summary Report electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 2 |
07/10/2024 | Notice of Compliance with Condition 10 – Phase II Commercial Operations Date electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 3 |
07/10/2024 | Notice of Compliance with Condition 17 – Updated Decommissioning Plan electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 3 |
04/15/2024 | Notice of Compliance with Condition 10 – 2024 First Quarter Complaint Summary Report electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 3 |
04/02/2024 | Notice - Compliance with Condition 10 – Commercial Operation Date electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 2 |
04/02/2024 | Notice - Compliance with Condition 10 – Start of Operation Notices electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 6 |
01/17/2024 | Notice of Final Vegetation Management Plan electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 30 |
01/16/2024 | Notice of Compliance with Condition 10 – 2023 Fourth Quarter Complaint Summary Report electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 2 |
11/03/2023 | Notice of Compliance with Condition 4 – Memorandum and Updated Maps electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 5 |
10/16/2023 | Notice of Compliance with Condition 10 – 2023 Third Quarter Complaint Summary Report electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 2 |
09/21/2023 | Notice of Withdrawal of Counsel Robert Eubanks (0073386) electronically filed by Mrs. Kimberly M. Naeder on behalf of PUCO. | 5 |
07/17/2023 | Notice of Compliance with Condition 10 – 2023 Second Quarter Complaint Summary Report electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 3 |
05/31/2023 | Report of Compliance Inquiry and Staff recommendations concerning burned trees electronically filed by Eric R. Morrison on behalf of OPSB Staff. | 3 |
04/17/2023 | Notice of Compliance with Condition 10 – 2023 First Quarter Complaint Summary Report electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 3 |
03/28/2023 | Compliance Inquiry Report electronically filed by Mr. Matt Butler on behalf of Staff of OPSB. | 9 |
03/20/2023 | Notice - Staging Area Update electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 3 |
01/17/2023 | Notice of Compliance with Condition 10 – 2022 Fourth Quarter Complaint Summary Report electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 20 |
11/17/2022 | Compliance Inquiry Report electronically filed by Mr. Christopher Douglass on behalf of OPSB Staff. | 28 |
10/17/2022 | Notice of Compliance with Condition 10 – Quarterly Complaint Summary Report electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 3 |
10/11/2022 | Compliance with Amendment Condition 6 – SHPO MOU electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 29 |
10/11/2022 | Compliance with Condition 2 – Second Preconstruction Conference Agenda – Balance of Construction electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC | 3 |
10/11/2022 | Notice of Compliance with Condition 4, Part 12 of 12 - IFC Civil Design Engineering Drawings electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 10 |
10/11/2022 | Notice of Compliance with Condition 4, Part 11 of 12 - IFC Civil Design Engineering Drawings electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 23 |
10/11/2022 | Notice of Compliance with Condition 4, Part 10 of 12 - IFC Civil Design Engineering Drawings electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 22 |
10/11/2022 | Notice of Compliance with Condition 4, Part 9 of 12 - IFC Civil Design Engineering Drawings electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 2 |
10/11/2022 | Notice of Compliance with Condition 4, Part 8 of 12 - IFC Civil Design Engineering Drawings electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 23 |
10/11/2022 | Notice of Compliance with Condition 4, Part 7 of 12 - IFC Civil Design Engineering Drawings electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 7 |
10/11/2022 | Notice of Compliance with Condition 4, Part 6 of 12 - IFC Civil Design Engineering Drawings electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 6 |
10/11/2022 | Notice of Compliance with Condition 4, Part 5 of 12 - IFC Civil Design Engineering Drawings electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 6 |
10/11/2022 | Notice of Compliance with Condition 4, Part 4 of 12 - IFC Civil Design Engineering Drawings electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 6 |
10/11/2022 | Notice of Compliance with Condition 4, Part 3 of 12 - IFC Civil Design Engineering Drawings electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 2 |
10/11/2022 | Notice of Compliance with Condition 4, Part 2 of 12 - IFC Civil Design Engineering Drawings electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 12 |
10/11/2022 | Notice of Compliance with Condition 4, Part 1 of 12 - IFC Civil Design Engineering Drawings electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 14 |
10/07/2022 | Notice of Compliance with Conditions 14 and 15 – Updated Sound Study electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 38 |
10/07/2022 | Notice of Compliance with Condition 19 – Environmentally Sensitive Areas Map electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 3 |
10/06/2022 | Notice of Withdrawal of Counsel electronically filed by Ms. Leah Curtis on behalf of Ohio Farm Bureau Federation. | 4 |
09/22/2022 | Compliance with Condition 30 and 8 – Transportation Plans and Permits electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 211 |
09/16/2022 | Compliance with Condition 4 – 90 % Substation Engineer Design Drawings electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 6 |
09/16/2022 | Compliance with Condition 29 – Spill Prevention, Control, and Countermeasure Plan electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 45 |
09/16/2022 | Compliance with Condition 18 – Tree Clearing electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 13 |
07/29/2022 | Notice of Compliance with Condition 13 & Amendment Conditions 3 & 7 – Landscape Plan,
Lighting Plan, and Glare Study electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 109 |
07/29/2022 | Notice of Compliance with Condition 31 – Water Well Plan electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 6 |
07/29/2022 | Notice of Compliance with Condition 11 – Interim Interconnection Service Agreement electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 20 |
07/29/2022 | Notice of Compliance with Condition 17 – Decommissioning Plan electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 15 |
07/29/2022 | Notice of Compliance with Condition 7 – Construction Start Date – August 1, 2022 electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 2 |
07/29/2022 | Notice - Part 4 of 4 - Compliance with Condition 4 – Detailed Engineering Drawings electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC | 28 |
07/29/2022 | Notice - Part 3 of 4 - Compliance with Condition 4 – Detailed Engineering Drawings electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 28 |
07/29/2022 | Notice - Part 2 of 4 - Compliance with Condition 4 – Detailed Engineering Drawings electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC | 28 |
07/29/2022 | Notice - Part 1 of 4 - Compliance with Condition 4 – Detailed Engineering Drawings electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 29 |
07/29/2022 | Notice of Compliance with Condition 5 – Final Geotechnical Engineering Report electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 2 |
07/27/2022 | Compliance Notice with Condition 1 – Emergency Response Plans electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC | 35 |
07/26/2022 | Compliance with Condition 10 – Updated Complaint Resolution Plan and Proof of Service of Pre-Construction Notices electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 6 |
07/26/2022 | Notice of Compliance with Condition 2 – Preconstruction Conference Agenda – Civil Engineering Construction electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 3 |
07/13/2022 | Compliance with Condition 1 – Archaeological Report electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 785 |
07/01/2022 | Notification of Compliance with Condition 10 - Complaint Resolution Plan electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 7 |
07/15/2021 | Service Notice | 3 |
07/15/2021 | Opinion, Order and Certificate issuing a certificate of environmental compatibility and public need to Fox Squirrel Solar, LLC for the construction, operation, and maintenance of the solar-powered electric generation facility, subject to the conditions set forth in the Stipulation and consistent with this Opinion, Order, and Certificate electronically filed by Ms. Mary E. Fischer on behalf of Ohio Power Siting Board. | 45 |
04/21/2021 | Transcript April 13, 2021
In the Matter of the Application of Fox Squirrel Solar, LLC, for a Certificate of Environmental Compatibility and Public Need to Construct a Solar-Powered Electric Generation Facility in Madison County, Ohio. electronically filed by Mr. Ken Spencer on behalf of Armstrong & Okey, Inc. and Gibson, Karen Sue Mrs. | 17 |
04/13/2021 | Transcript for hearing held on March 30, 2021 at 6:00 p.m., via Webex, before Administrative Law Judges Mr. Nicholas Walstra and Mr. David Hicks electronically filed by Mr. Ken Spencer on behalf of Armstrong & Okey, Inc. and Mrs. Karen Sue Gibson. | 34 |
04/08/2021 | Prefiled Testimony of Grant Zeto on Behalf of the Staff of the Public Utilities Commission of Ohio, Power Siting Department electronically filed by Mrs. Kimberly M. Naeder on behalf of OPSB. | 6 |
04/06/2021 | Direct Testimony of Andrew Dahlen electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 11 |
04/06/2021 | Joint Stipulation and Recommendation electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 15 |
03/29/2021 | Witness/Testimonial List for the Local Public Hearing on March 30, 2021 at 6:00 p.m. electronically filed by Ms. Mary E. Fischer on behalf of Ohio Power Siting Board. | 2 |
03/25/2021 | Proof of Second Publication and Service of Procedural Schedule and
Accepted, Complete Application electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 4 |
03/24/2021 | Service Notice. | 3 |
03/24/2021 | Entry ordering that OFBF’s motion to intervene be granted as stated in paragraph 5 and ordering that Fox Squirrel’s motion for notice finding and waiver be granted as stated in paragraph 9
electronically filed by Kelli C. King on behalf of David M. Hicks, Administrative Law Judge, Public Utilities Commission of Ohio. | 5 |
03/15/2021 | Service Notice. | 4 |
03/15/2021 | Staff Report of Investigation electronically filed by Mr. Matt Butler on behalf of Staff of OPSB. | 44 |
03/01/2021 | Motion for Notice Finding and Waiver Request and Memorandum in Support electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 5 |
03/01/2021 | Proof of Pub and Service of Procedural Schedule and Accepted, Complete Application electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 4 |
03/01/2021 | Response to Fourth Data Request from Staff of the Ohio Power Siting Board electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 7 |
02/18/2021 | Response to Third Data Request from Staff of the Ohio Power Siting Board electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 12 |
02/17/2021 | Motion to Intervene and memorandum in support of Ohio Farm Bureau Federation electronically filed by Amy M Milam on behalf of Ohio Farm Bureau Federation. | 7 |
01/22/2021 | Service Notice. | 2 |
01/22/2021 | Administrative Law Judge Entry ordering that the hearings in this matter be scheduled in accordance with Paragraph 10; ordering that That notice of the application and hearings be published by the Applicant in accordance with Paragraphs 12, 13, 16, and 17; ordering that witness registration occur pursuant to Paragraphs 14,18, and 19; and, ordering that a procedural schedule be established in accordance with Paragraph 24 electronically filed by Heather A Chilcote on behalf of Nicholas Walstra, Administrative Law Judge, Ohio Power Siting Board. | 9 |
01/07/2021 | Notice of the payment of the application fee electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 3 |
12/16/2020 | Certificate of Service of Accepted, Complete Application on Local Public Officials and Libraries electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 4 |
12/16/2020 | Supplemental Response to Second Data Request from Staff of the Ohio Power Siting Board electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 10 |
12/14/2020 | Correspondence regarding application compliance electronically filed by Mr. Matt Butler on behalf of Staff of OPSB. | 3 |
12/09/2020 | Response to Second Data Request from Staff of the Ohio Power Siting Board (Part 2 of 2) electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 271 |
12/09/2020 | Response to Second Data Request from Staff of the Ohio Power Siting Board (Part 1 of 2) electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 254 |
12/08/2020 | Response to First Data Request from Staff of the Ohio Power Siting Board electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 11 |
12/03/2020 | Confidential Release Document: Pages 23-25 and entirety of Exhibit B filed by Dickinson Wright PLL on behalf of Fox Squirrel Solar, LLC on 10/14/20 electronically filed by Docketing Staff. (185 pages) | 186 |
11/23/2020 | Service Notice. | 2 |
11/23/2020 | Administrative Law Judge Entry granting Applicant’s October 14, 2020 motion for waiver as it pertains to Ohio Adm.Code 4906-4-08(D)(2)-(4), as stated in Paragraph 14; granting Applicant’s motion for protective order, in part, and denied, in part; ordering the Commission’s docketing division maintain, under seal, the financial information contained on pages 41-42 and the insurance certificate and policy numbers in Exhibit H of the application; ordering that the Commission’s docketing division move pages 23-25 and Exhibit B of the application to the public docket ten days after the issuance of this Entry; ordering that the Commission’s docketing division maintain as confidential all information and documents afforded protective treatment by this Entry; and finally ordering that this protective order shall be effective for a period of 24 months from the date of issuance of this Entry.
electronically filed by Kelli C. King on behalf of David M. Hicks, Administrative Law Judge, Public Utilities Commission of Ohio. | 9 |
11/03/2020 | Supplement to Application – Ownership and Figure 08-7 Landmark Mapping electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 53 |
10/29/2020 | Memorandum Contra Applicant's Motion for Waiver Submitted on Behalf of the Staff of the Ohio Power Siting Board electronically filed by Mrs. Kimberly M Naeder on behalf of OPSB. | 6 |
10/14/2020 | Motion for Waiver electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 5 |
10/14/2020 | Motion For Protective Order electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 13 |
10/14/2020 | Confidential Document Target: CONFIDENTIAL Application filed by Dickinson Wright PLL on behalf of Fox Squirrel Solar, LLC. (190 pages) | 1 |
10/14/2020 | Application - Part 30 of 30 (Exhibit Z - Drainage Methodology Summary) electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 115 |
10/14/2020 | Application - Part 29 of 30 (Exhibit Y - Agricultural Field Drainage Inventory) electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 84 |
10/14/2020 | Application - Part 28 of 30 (Exhibit X - Hydrologic and Hydraulic Assessment) electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 32 |
10/14/2020 | Application - Part 27 of 30 (Exhibit W - Ground Level Glare Analysis) electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 105 |
10/14/2020 | Application - Part 26 of 30 (Exhibit V - Viewshed Analysis Report and Visual Impact Mitigation Plan) electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 41 |
10/14/2020 | Application - Part 25 of 30 (Exhibit U Architectural Survey and SHPO Concurrence) electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 178 |
10/14/2020 | Application - Part 24 of 30 (Exhibit T - SHPO Approved Work Plan) electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 11 |
10/14/2020 | Application - Part 23 of 30 (Exhibit S - Cultural Resources Literature Review) electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 37 |
10/14/2020 | Application - Part 22 of 30 (Exhibit R - Land Use and Demographics Report) electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 38 |
10/14/2020 | Application - Part 21 of 30 (Exhibit Q - Vegetation Management Plan) electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 13 |
10/14/2020 | Application - Part 20 of 30 (Exhibit P - Ecological Resource Analysis Report - Part 2 of 2) electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 262 |
10/14/2020 | Application - Part 19 (Exhibit P - Ecological Resource Analysis Report - Part 1 of 2) electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 105 |
10/14/2020 | Application - Part 18 of 30 (Exhibit O - Geotechnical Studies) electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 133 |
10/14/2020 | Application - Part 17 of 30 (Exhibit N - Noise Evaluation) electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 27 |
10/14/2020 | Application - Part 16 of 30 (Exhibit M - FAA Determination of No Hazard) electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 23 |
10/14/2020 | Application - Part 15 of 30 (Exhibit L - HDD Inadvertent Return Plan (Frac Out Plan)) electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 7 |
10/14/2020 | Application Part 14 of 30 (Exhibit K – Preliminary Decommissioning Plan) electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 6 |
10/14/2020 | Application - Part 13 of 30 (Exhibit J - Culvert and Bridge Inventory Report) electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 59 |
10/14/2020 | Application - Part 12 of 30 (Exhibit I - Transportation Effect and Route Evaluation Study) electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 53 |
10/14/2020 | Application - Part 11 of 30 (Exhibit H - Certificate of Liability Insurance) electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 4 |
10/14/2020 | Application - Part 10 of 30 (Exhibit G - Complaint Resolution Plan) electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 6 |
10/14/2020 | Application - Part 9 of 30(Exhibit F – Public Information Meeting PowerPoint Presentation) electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 33 |
10/14/2020 | Application - Part 8 of 30 (Exhibit E – Economic Impact Report) electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 52 |
10/14/2020 | Application - Part 7 of 30 (Exhibit D – Interconnection Studies) electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 55 |
10/14/2020 | Application - Part 6 of 30 (Exhibit C – Project Schedule) electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 4 |
10/14/2020 | Application - Part 5 of 30 (Exhibit B – Manufacturer Specifications) electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 3 |
10/14/2020 | Application - Part 4 of 30 (Exhibit A – Preliminary Site Plan) electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 12 |
10/14/2020 | Application - Part 3 of 30 (Figures 08-3 - 08-8) electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 57 |
10/14/2020 | Application - Part 2 of 30 (Figures 03-1 - 08-2) electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 46 |
10/14/2020 | Application - Part 1 of 30 (Cover letter, Affidavit and Narrative) electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 108 |
07/20/2020 | Proof of Pub for Public Information Meeting electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 4 |
07/01/2020 | Notice of Compliance with Service Requirement for Public Information Meeting electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 2 |
07/01/2020 | Preapplication Notification Letter electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 3 |
06/30/2020 | Service Notice | 2 |
06/30/2020 | Administrative Law Judge Entry ordering Applicant’s June 17, 2020 motion for waiver be granted, to the extent it is requesting to waive the Board’s requirement that a public information meeting be held in the area in which the Project is to be located. electronically filed by Kelli C King on behalf of David M. Hicks, Administrative Law Judge, Public Utilities Commission of Ohio. | 5 |
06/24/2020 | Correspondence Staff No Opposition Letter electronically filed by Mrs. Kimberly M Naeder on behalf of OPSB. | 3 |
06/17/2020 | In the matter of the Motion for Waiver and Request for Approval of an Alternative Method for the Public Information Meeting and Request for Expedited Ruling and Memorandum in Support electronically filed by Christine M.T. Pirik on behalf of Fox Squirrel Solar, LLC. | 17 |