07/20/2015 Notice of construction completion filed by J. Thacker on behalf of FirstEnergy Service Corporation.
02/25/2014 Notice of Acceptance of Staff's Proposed Conditions on Certificate electronically filed by Mr. Robert J. Schmidt on behalf of American Transmission Systems Inc.
02/18/2014 Report of investigation electronically filed by Mr. Adam S Bargar on behalf of Staff of OPSB.
02/11/2014 Supplement to construction notice electronically filed by Mr. Robert J. Schmidt on behalf of American Transmission Systems Inc.
02/04/2014 In the matter of the notice of Construction of the Boardman – Sammis 138 kV Transmission Line Loop to Nevada Substation Project electronically filed by Mr. Robert J. Schmidt on behalf of American Transmission Systems Inc.