DIS - Case Record for 12-2462-EL-BLN Skip to main content

Case Record For:

12-2462-EL-BLN

File a Public Comment
Case Title: AMERICAN TRANSMISSION SYSTEMS INC
Status: OPEN-OPEN
Industry Code: EL-ELECTRIC
Purpose Code: BLN-letter of notification
Date Opened: 9/12/2012
Date Closed:
Printable Docket Card Service List
View per page
Date FiledSummaryPages
07/25/2014Letter of Notification that the project was completed approximately April 22, 2014 filed by S. Humphrys on behalf of FirstEnergy.1
09/11/2013Letter stating that construction on Allen Junction-Midway 345 kV Transmission Line Loop to Fulton Substation and North Star Steel 345 kV Transmission Line Tap Relocation is expected to begin on or shortly after September 12, 2013 filed by S. Humphrys on behalf of FirstEnergy Service Company1
11/05/2012Staff Report Filed - Allen Junction.1
09/12/2012In the matter of the notification of FirstEnergy Services Company for Allen Junction-Midway 345 kV Transmission Line Loop to Fulton Substation and North Star Steel 345 kV Transmission Line Tap Relocation filed by S. Humphrys.29