DIS - Case Record for 10-0325-EL-COI Skip to main content
      
      
CASE NUMBER: 10-0325-EL-COI
CASE DESCRIPTION: IN THE MATTER OF THE COMMISSION'S INVESTIGATION INTO THE TESTING AND VERIFICATION OF ADVANCED METERING INFRASTRUCTURE INSTALLATIONS
DOCUMENT SIGNED ON: 4/18/2024
DATE OF SERVICE: ________________________________________
10/29/2015 Case Action Form closing dockets electronically filed by Richard M. Bulgrin on behalf of Public Utilities Commission of Ohio
06/01/2010 Report on the Testing and Verification of Advanced Metering Infrastructure Installations electronically filed by Ms. Kathy J Kolich on behalf of Ohio Edison Company and The Cleveland Electric Illuminating Company and The Toledo Edison Company.
06/01/2010 Response of Duke Energy Ohio, Inc. to commission investigation into the testing and verification of advanced metering infrastructure installations filed by E. Watts.
06/01/2010 Report regarding procedures to ensure AMI meter accuracy filed by J. Sobeki on behalf of The Dayton Power and Light Company.
05/28/2010 Report regarding procedures to ensure AMI meter accuracy filed by J. Sobecki on behalf of The Dayton Power and Light Company. (FAX)
05/28/2010 Advanced metering infrastructure report filed by S. Nourse on behalf of Columbus Southern Power Company.
03/25/2010 Service Notice
03/24/2010 Entry ordering that each electric utility identified in Finding (1) file a report, as described in Finding (3), regarding any proposed or installed AMI equipment by May 31, 2010.
03/24/2010 In the matter of the commission's investigation into the testing and verification of advanced metering infrastructure.