08/10/2009
|
Notice that Duke Energy line F5680 138kV Electric Transmission Line Loop through Nickel Substation was completed and made operational on June 5, 2009 filed by S. Lane. |
01/02/2009
|
Staff investigation report and recommendation filed by J. O'Dell. |
11/24/2008
|
In the matter of the notification of Duke Energy for the Line F5680 138 kV electric transmission line loop through Nickel Substation. |
|