DIS - Case Record for 06-1142-GA-BIN Skip to main content

Case Record For:

06-1142-GA-BIN

File a Public Comment
Case Title: ROCKIES EXPRESS PIPELINE
Status: OPEN-OPEN
Industry Code: GA-GAS
Purpose Code: BIN-Study or investigation
Date Opened: 9/19/2006
Date Closed:
Printable Docket Card Service List
View per page
Date FiledSummaryPages
04/22/2010Weekly Report #95 filed on behalf of Rockies Express Pipeline, LLC by R. Harrington. 46
04/13/2010Weekly Report # 94 filed on behalf of Rockies Express Pipeline, LLC.42
04/08/2010Weekly Report # 83 filed on behalf of Rockies Express Pipeline by S. Howe.36
04/08/2010Weekly Report # 93 filed on behalf of Rockies Express Pipeline by S. Howe.40
03/26/2010Weekly report #88, period ending February 24, 2010, filed by S. Howe on behalf of Rockies Express Pipeline LLC. 38
03/26/2010Weekly report #89, period ending March 3, 2010, filed by S. Howe on behalf of Rockies Express Pipeline LLC. 39
03/26/2010Weekly report # 92, period ending March 24, 2010, filed by S.Howe, on behalf of Rockies Express Pipeline LLC. 38
03/26/2010Weekly report #91, period ending March 17, 2010, filed by S. Howe on behalf of Rockies Express Pipeline.40
03/26/2010Weekly report #90, period ending March 10, 2010, filed by S. Howe on behalf of Rockies Express Pipeline. 41
02/25/2010Weekly Report #84, period ending January 27, 2010 filed by S. Howe on behalf of Rockies Express Pipeline LLC.37
02/25/2010Weekly Report #85, period ending February 3, 2010, filed by S. Howe on behalf of Rockies Express Pipeline LLC.38
02/25/2010Weekly Report #86, period ending February 10, 2010, filed by S. Howe on behalf of Rockies Express Pipeline LLC.38
02/25/2010Weekly Report #87, period ending February 17, 2010, filed by S. Howe on behalf of Rockies Express Pipeline LLC.37
01/27/2010Report for environmental condition No. 60, filed on behalf of Rockies Express Pipeline by S. Howe.2
01/15/2010Weekly report # 82, period ending January 13, 2010 filed on behalf of Rockies Express Pipeline by S. Howe.34
01/13/2010Weekly report #81, period ending January 6, 2010 filed by S. Howe on behalf of Rockies Express Pipeline LLC. 34
01/13/2010Weekly report #80, period ending December 30, 2009 filed by S. Howe on behalf of Rockies Express Pipeline LLC.34
12/24/2009Weekly Report #79, period ending December 23, 2009 filed by S. Howe on behalf of Rockies Express Pipeline LLC.32
12/18/2009Weekly Report #78, period ending December 16, 2009 filed by S. Howe on behalf of Rockies Express Pipeline LLC.31
12/11/2009Weekly Report # 77, period ending December 9, 2009 filed on behalf of Rockies Express Pipeline by S. Howe.29
12/10/2009Weekly report #76, period ending December 2, 2009 filed by S. Howe on behalf of Rockies Express Pipeline LLC.29
12/10/2009Weekly report #75, period ending November 25, 2009 filed by S. Howe on behalf of Rockies Express Pipeline LLC.30
12/10/2009Weekly report #74, period ending November 18, 2009 filed by S. Howe on behalf of Rockies Express Pipeline LLC.32
12/10/2009Weekly report #73, period ending November 11, 2009 filed by S. Howe on behalf of Rockies Express Pipeline LLC.35
12/10/2009Weekly report #72, period ending November 4, 2009 filed by S. Howe on behalf of Rockies Express Pipeline LLC.22
11/13/2009Letter granting request of Rockies Express Pipeline to place into service the listed facilities in Ohio filed by L. O'Donnell, FERC.3
11/06/2009Weekly report #71, period ending October 28, 2009 filed by S. Howe on behalf of Rockies Express Pipeline LLC.33
11/06/2009Rockies Express Pipeline LLC's request to commence service for facilities from milepost 444.0 to milepost 639.1 filed by R. Walker.48
11/05/2009Weekly report #70, period ending October 21, 2009 filed by S. Howe on behalf of Rockies Express Pipeline LLC.25
11/05/2009Weekly report #65, period ending September 16, 2009 filed by S. Howe on behalf of Rockies Express Pipeline LLC.34
10/27/2009Weekly report #67, period ending September 30, 2009 filed by S. Howe on behalf of Rockies Express Pipeline LLC.27
10/27/2009Weekly report #68, period ending October 7, 2009 filed by S. Howe on behalf of Rockies Express Pipeline LLC.24
10/27/2009Weekly report #69, period ending October 14, 2009 filed by S. Howe on behalf of Rockies Express Pipeline LLC.26
10/02/2009Weekly report #66, period ending September 23, 2009 filed by S. Howe on behalf of Rockies Express Pipeline LLC.31
09/18/2009FERC weekly report #60 for the month of August, 2009 filed on behalf of Rockies Express Pipeline LLC.54
09/18/2009Weekly report #56, period ending July 15, 2009 filed by S. Howe on behalf of Rockies Express Pipeline LLC.47
09/18/2009FERC weekly report No. 61, update-summary of restoration activities filed on behalf of Rockies Express Pipeline.57
09/18/2009Weekly Report #64, period ending September 9, 2009 filed by S. Howe on behalf of Rockies Express Pipeline LLC.51
09/16/2009Weekly report #63 filed by S. Howe on behalf of the Rockies Express Pipeline LLC.57
09/04/2009Weekly Report #62, Period Ending August 26, 2009, filed on behalf of Rockies Express Pipeline by S. Howe. 56
08/18/2009Weekly Report #59 for the period ending August 5, 2009 filed by S. Howe on behalf of the Rockies Express Pipeline.61
08/11/2009Weekly Report #58 for the period ending July 29, 2009 filed by S. Howe on behalf of the Rockies Express Pipeline.51
07/31/2009Weekly Report #57, period ending July 22, 2009, filed by S. Howe on behalf of Rockies Express Pipeline LLC. 54
07/21/2009Weekly report #55, period ending July 8, 2009, filed by S. Howe on behalf of Rockies Express Pipeline, LLC.48
07/10/2009Weekly report #54, period ending July 1, 2009, filed by S. Howe on behalf of Rockies Express Pipeline, LLC.53
07/02/2009Correspondence of Rockies Express Pipeline LLC submitting its weekly construction report, #53, for the period ending June 24, 2009 filed by S. Howe.40
06/23/2009Weekly construction progress report #51 for activities of Rockies Express Pipeline LLC for the week ending June 10, 2009 filed by S. Howe.44
06/23/2009Weekly report #52 of Rockies Express Pipeline LLC for the period ending June 17, 2009 filed by S. Howe.40
06/22/2009Weekly report #50, period ending June 3, 2009 filed by S. Howe on behalf of the Rockies Express Pipeline LLC.47
06/05/2009Weekly report #49, period ending May 27, 2009 filed by S. Howe on behalf of Rockies Express Pipeline LLC.60
05/28/2009Weekly Report # 48, period ending May 20, 2009 filed on behalf of Rockies Express Pipeline by S. Howe.37
05/21/2009Weekly construction progress report for activities for the week ending May 13, 2009 filed on behalf of Rockies Express Pipeline LLC by S. Howe. 37
05/18/2009Weekly construction progress report #45, for activities for the week ending April 29, 2009 filed on behalf of Rockies Express Pipeline LLC by S. Howe. 38
05/18/2009Weekly construction progress report #46. for activities for the week ending May 6, 2009 filed on behalf of Rockies Express Pipeline LLC by S. Howe. 32
04/30/2009Weekly construction progress report #44 for activities for the week ending April 22, 2009 filed by S. Howe on behalf of Rockies Express Pipeline LLC.35
04/17/2009Weekly construction progress report for the week ending April 8, 2009 filed by S. Howe on behalf of Rockies Express Pipeline LLC.28
04/10/2009Weekly construction progress report #41, for activities the week ending April 1, 2009, filed by S. Howe on behalf of Rockies Express Pipeline LLC. 32
04/06/2009Weekly construction progress report for activities for the week ending March 25, 2009, filed by S. Howe on behalf of Rockies Express Pipeline LLC. 37
04/06/2009Letter requesting authorization to commence construction at three contractor yards in Ohio filed by S. Howe on behalf of Rockies Express Pipeline, LLC. 6
03/30/2009Weekly construction progress report, #39, for activities for the week ending March 18, 2009, filed by S. Howe on behalf of Rockies Express Pipeline LLC. 37
03/19/2009Weekly construction progress report for activities for the week ending March 11, 2009 filed on behalf of Rockies Express Pipeline LLC by S. Howe. 35
03/12/2009Weekly Report #37, Period Ending March 4, 2009 of the Rockies Express Pipeline, LLC filed by S. Howe.40
03/06/2009Weekly report # 36 for period ending February 25, 2009 filed on behalf of Rockies Express Pipeline by S. Howe.34
02/20/2009Rockies Express Pipeline weekly report #34, period ending February 11, 2009 filed by S. Howe.42
02/13/2009Weekly Report #33 for the period ending February 4, 2009 filed by S. Howe on behalf of Rockies Express Pipeline LLC.45
02/06/2009Weekly report #32, period ending January 28, 2009 filed by S. Howe on behalf of Rockies Express Pipeline LLC. 43
01/23/2009Weekly Report #30, period ending January 14, 2009 concerning the Rockies Express Pipeline filed by S. Howe.38
01/15/2009Weekly Report #29, period ending January 7, 2009 filed by S. Howe on behalf of Rockies Express Pipeline, LLC.53
01/13/2009Weekly Report #28, period ending 12/31/08 filed by S. Howe on behalf of Rockies Express Pipeline LLC.41
01/09/2009Weekly Report #26 for period ending 12/17/08 filed on behalf of Rockies Express Pipeline LLC. 36
01/09/2009Weekly report #27 for the period ending 12/24/08 filed by S. Howe on behalf of the Rockies Express Pipeline LLC.37
12/17/2008Weekly report #25 filed by S. Howe on behalf of Rockies Express Pipeline LLC.42
12/11/2008Weekly construction report, #24, regarding Rockies Express Pipeline LLC Project filed by S. Howe.36
12/11/2008Weekly construction progress report, #23, regarding the Rockies Express Pipeline LLC Project filed by S. Howe.44
11/26/2008Correspondence concerning Rockies Express Pipeline by S. Howe.43
11/26/2008Correspondence concerning Rockies Express Pipeline by K. Janik.50
11/14/2008Correspondence letter regarding the Rockies Express East Pipeline Project filed on behalf of the Rockies Express Pipeline LLC by S. Howe. 51
11/05/2008Weekly Report #19- construction progress for activities for the week ending October 29, 2008 on behalf of Rockies Express Pipeline LLC filed by S. Howe.44
10/30/2008Correspondence in regard to Rockies Express Pipeline LLC filed by S. Howe.50
10/22/2008Weekly construction progress report #17 for activities for the week ending October 15, 2008, filed by S. Howe on behalf of Rockies Express Pipeline LLC.48
10/22/2008Weekly construction progress report #16 for activities for the week ending October 8, 2008, filed by S. Howe on behalf of Rockies Express Pipeline LLC.48
10/22/2008Letter regarding the Rockies Express East Pipeline project, filed by M. Heide.4
10/15/2008Memo regarding the Rockies Express East Pipeline project filed by Staff. 1
10/15/2008Letter regarding the Rockies Express Pipeline LLC, REX-East project revision Spread F, filed by S. Howe. (Ohio)8
10/15/2008Letter regarding the Rockies Express Pipeline LLC, REX-East project Spread F, filed by S. Howe. (Ohio)31
10/15/2008Letter regarding the Rockies Express Pipeline LLC project filed by J. Peconom on behalf of FERC.2
10/15/2008Letter regarding the Rockies Express Pipeline LLC project construction of Spread F (Millepost 404.7 to 432.9) filed by L. Turner. on behalf of FERC.3
10/15/2008Withdrawal of June 30, 2008, request for rehearing on behalf of OPSB filed by Staff. (Ohio)6
10/10/2008Response to notification of required corrective action regarding the Rockies Express Pipeline project, filed by S. Howe. 11
10/10/2008Letter requesting that alternative routes be considered for the Rockies Express Pipeline project, filed by concerned resident A and C Stim. 3
10/10/2008Supplemental information filed on behalf of Rockies Express Pipeline by S. Howe. 12
10/10/2008Weekly report #15 for the period ending October 1, 2008, on behalf of Rockies Express Pipeline LLC., filed by S. Howe. 39
10/10/2008Supplemental information on behalf of Rockies Express Pipeline filed by S. Howe.32
10/10/2008Letter regarding objections to Illinois River/200th Rockies Express Pipeline project, filed by M. Langston. 5
10/10/2008Letter on behalf of the Rockies Express Pipeline regarding implementation of Treatment Plan No. 3, filed by S. Howe. (Indiana)5
10/10/2008Letter on behalf of the Rockies Express Pipeline project regarding request to proceed for construction in Exclusion Zones- Spread E, filed by S. Howe. (Indiana)8
10/10/2008Letter regarding Rockies Express Pipeline Project, filed by J. Glass. 1
10/10/2008Letter regarding Phase II testing results pertaining to the Rockies Express Pipeline Project, filed by J. Glass. (Indiana) 1
10/06/2008Letter requesting for a notice to proceed ("NTP") for previously identified Exclusion Zones surrounding sensitive resources in Spreads A-1, D, E, and F of the REX-East Project filed by S. Howe.23
10/06/2008Letter on behalf of and filed by FERC regarding transmission pricing plan for Western Grid.2
10/06/2008Correspondence regarding the Rockies Express Pipeline project filed by S. Howe.29
10/06/2008 Letter regarding the Rockies Express Pipeline LLC project filed by P. King.5
10/06/2008Letter regarding the Rockies Express LLC authorization to commence construction in previously excluded areas filed by E. Onge.3
10/06/2008Correspondence regarding the Rockies Express Pipeline LLC project filed by S. Howe42
10/06/2008Letter regarding the Rockies East Pipeline project located in Warren County, Ohio filed by A. Lykens.4
09/30/2008Rockies Express Pipeline submits its weekly construction progress report for the week ending September 24, 2008 field by S. Howe.45
09/30/2008Rockies Express filed a request for a Notice to Proceed for previously identified Exclusion Zones in Spreads A-1 and D filed by S. Howe.10
09/30/2008Letter of clarification with respect to the REX September 23, 2008 filing, filed by S. Howe.6
09/30/2008Letter regarding the REX Pipeline project filed by J. Forman.5
09/30/2008Rockies Express Pipeline submits supplemental data with respect to its authority to commence construction on the Indiana portion of Spread F filed by S. Howe.7
09/30/2008Authorization to start construction of Spread F (Indiana) filed by L. Turner, FERC.3
09/30/2008Rockies Express Pipeline submits supplemental data with respect to its request for authority to commence construction filed by S. Howe.9
09/26/2008Letter regarding the Rex-East Project filed by J. Smith.2
09/26/2008Letter regarding the REX-East Project filed by J. Kelliher, FERC.1
09/26/2008Letter regarding the REX East Project filed by J. Smith. 1
09/26/2008Letter regarding the REX-East Project filed by S. Howe on behalf of Rockies Express Pipeline LLC.50
09/26/2008Letter regarding the REX-East Project filed by S. Howe on behalf of Rockies Express Pipeline LLC.18
09/24/2008Supplemental information and request for "Notice to Proceed" for the Indiana portion of Spread F, filed by S. Howe. 59
09/24/2008Letter providing additional information concerning cultural information regarding a property on the REX East Project route filed by S. Howe. 2
09/24/2008Weekly report #13, period ending September 17, 2008, filed by S. Howe on behalf of Rockies Express Pipeline LLC. 33
09/24/2008Correspondence letter regarding spill prevention, containment, and countermeasure plan filed by S. Howe on behalf of Rockies Express Pipeline LLC. 16
09/24/2008Correspondence regarding authorization too commence construction in previously excluded areas filed by L. Turner. 3
09/24/2008Correspondence regarding authorization to commence construction in skipped areas and data recovery at two sites in Indiana filed by l. Turner. 3
09/24/2008Correspondence regarding the Rockies Express pipeline project submitted electronically. 12
09/19/2008Request for Notice to proceed in exclusion zones- Spreads C, D, and E filed by S. Howe on behalf of Rockies Express Pipeline LLC. 184
09/19/2008Correspondence expressing concern over the Rockies Express Pipeline filed by J. Rust. 7
09/19/2008Correspondence stating the files supplemental cultural resources information filed by S. Howe on behalf of Rockies Express Pipeline LLC. (Ohio) 24
09/19/2008Memorandum containing the approval granted to Rockies Express Pipeline LLC (Rockies Express) by the Federal Energy Regulatory Commission (FERC) staff's environmental monitors in August 2008 filed by L. Turner. 4
09/19/2008Weekly construction progress report for activities for the week ending September 10, 2008, filed by S. Howe on behalf of Rockies Express Pipeline LLC. 30
09/19/2008Letter of revised Spill Prevention Containment and Countermeasure (SPCC) Plan for the REX-East Project filed by S. Howe. 15
09/10/2008Correspondence concerning the Rockies Express Pipeline project filed by S. Howe. 5
09/10/2008Correspondence concerning the Rockies Express Pipeline project filed by S. Howe.16
09/10/2008Hoosier Hills-North Dearborn 5 year time of travel flow map. 1
09/10/2008Correspondence concerning the Rockies Express Pipeline project filed by R. Harrington.6
09/10/2008Correspondence concerning the Rockies Express Pipeline project filed by S. Howe. 10
09/10/2008Correspondence concerning the Rockies Express Pipeline project filed by S. Howe. 2
09/10/2008Correspondence concerning the Rockies Express Pipeline project filed by P. King. 3
09/10/2008Correspondence concerning the Rockies Express Pipeline project filed by J. Peconom. 3
09/05/2008Correspondence concerning the Rockies Express Pipeline project filed by S. Howe.32
09/05/2008Correspondence concerning the Rockies Express Pipeline project filed by M. Tandon.13
09/05/2008Correspondence concerning the Rockies Express Pipeline project filed by J. Smith. (Ohio)2
09/05/2008Correspondence concerning the Rockies Express Pipeline project filed by L. Turner. 3
09/05/2008Correspondence concerning the Rockies Express Pipeline project filed by S. Howe.12
09/05/2008Correspondence concerning the Rockies Express Pipeline project filed by S. Howe. 28
09/05/2008Correspondence concerning the Rockies Express Pipeline project filed by S. Howe. 3
09/05/2008Correspondence concerning the Rockies Express Pipeline project filed by S. Howe.3
09/05/2008Correspondence concerning the Rockies Express Pipeline project filed by S. Howe.4
09/05/2008Correspondence concerning the Rockies Express Pipeline project filed by L. Turner. 3
09/05/2008Correspondence concerning the Rockies Express Pipeline project filed by Indiana Department of Natural Resources by J. Glass.1
08/29/2008Correspondence regarding the Rockies Express Pipeline Project filed by S. Howe.142
08/29/2008Correspondence regarding the Rockies Express Pipeline Project filed by S. Howe.34
08/29/2008Correspondence regarding the Rockies Express Pipeline Project filed by C. Moffair.4
08/29/2008Correspondence regarding the Rockies Express Pipeline Project filed by L. Turner.2
08/29/2008Correspondence regarding the Rockies Express Pipeline Project filed by M. Miles.45
08/29/2008Correspondence regarding the Rockies Express Pipeline Project filed by J. Kelliher.4
08/29/2008Correspondence regarding the Rockies Express Pipeline Project filed by S. Howe.35
08/29/2008Correspondence regarding the Rockies Express Pipeline Project filed by S. Howe.2
08/29/2008Correspondence regarding the Rockies Express Pipeline Project filed by S. Howe.3
08/29/2008Correspondence regarding the Rockies Express Pipeline Project filed by S. Howe.18
08/29/2008Correspondence regarding the Rockies Express Pipeline Project filed by S. Howe.18
08/29/2008Correspondence regarding the Rockies Express Pipeline Project filed by S. Howe.7
08/29/2008Correspondence regarding the Rockies Express Pipeline Project filed by A. Connie.6
08/26/2008Correspondence regarding the Rockies Express Pipeline Project filed by J. Glass.1
08/26/2008Correspondence regarding the Rockies Express Pipeline Project filed by J. Glass. 1
08/26/2008Correspondence regarding the Rockies Express Pipeline Project filed by J. Peconom.1
08/26/2008Correspondence regarding the Rockies Express Pipeline Project filed by J. Haaker on behalf of Illinois Historic Preservation Agency.1
08/26/2008Letter regarding the Rockies Express Pipeline LLC REX East Project filed by S. Howe.2
08/26/2008Correspondence regarding the Rockies Express Pipeline LLC, REX-East Project filed by S. Howe.2
08/22/2008Correspondence regarding Rockies Express Pipeline, LLC filed by S. Howe.5
08/22/2008Correspondence regarding Rockies Express Pipeline, LLC filed by S. Howe.6
08/22/2008Correspondence regarding Rockies Express Pipeline, LLC filed by M. Tandon.3
08/22/2008Correspondence regarding Rockies Express Pipeline, LLC filed by S. Howe.2
08/22/2008Correspondence regarding Rockies Express Pipeline, LLC filed by S. Howe.7
08/22/2008Correspondence regarding Rockies Express Pipeline, LLC filed by S. Howe.17
08/22/2008Correspondence regarding Rockies Express Pipeline, LLC filed by P. King.11
08/22/2008Correspondence regarding Rockies Express Pipeline, LLC filed by S. Howe.5
08/22/2008Correspondence in regard to Rockies Express Pipeline, LLC filed by A. Lykens.33
08/19/2008Correspondence in regard to the Rockies Express Pipeline LLC filed by S. Howe.4
08/19/2008Correspondence in regard to the Rockies Express Pipeline LLC filed by R. Murray on behalf of Murray Energy Corporation. (Ohio)8
08/19/2008Correspondence in regard to the Rockies Express Pipeline LLC filed by J. Smith. (Ohio)2
08/19/2008Correspondence in regard to the Rockies Express Pipeline LLC filed by S. Howe3
08/19/2008Correspondence in regard to the Rockies Express Pipeline LLC filed by R. Murray on behalf of Murray Energy Corporation. (Ohio)2
08/19/2008Correspondence in regard to the Rockies Express Pipeline LLC filed by J. Peconom.2
08/18/2008Correspondence in regard to the Rockies Express Pipeline LLC filed by S. Howe.6
08/18/2008Correspondence in regard to the Rockies Express Pipeline LLC filed by J Peconom.3
08/18/2008Correspondence in regard to the Rockies Express Pipeline LLC filed by E. Bayh.8
08/18/2008Correspondence letter regarding the Rockies Express Pipeline, LLC. filed by M. Tandom.7
08/18/2008Biological Survey form regarding Rockies Express Pipeline Project filed by M. Tandom.49
08/18/2008Weekly Report #7, period ending August 6, 2008 filed by S. Howe on behalf of Rockies Express Pipeline LLC.24
08/18/2008Correspondence in regard to the Rockies Express Pipeline LLC filed by S. Howe.2
08/18/2008Correspondence in regard to the Rockies Express Pipeline LLC filed by S. Howe.6
08/12/2008Correspondence regarding Rockies Express Pipeline LLC filed by S. Howe.49
08/12/2008Correspondence regarding Rockies Express LLC the Pennington Road and Big Blue River HDDs filed by A. Lykens.1
08/12/2008Correspondence concerning Rockies Express Pipeline LLC filed by S. Howe.3
08/12/2008Letter concerning Rockies Express Pipeline LLC construction on Spread F. filed by P. King.6
08/12/2008Letter regarding the Rockies Express Pipeline project filed by M. Tandon.2
08/12/2008Letter regarding the Rockies Express Pipeline project filed by P. King.4
08/12/2008Letter regarding the Rockies Express Pipeline project filed by M. Tandon.5
08/12/2008Letter of response regarding the Rockies Express Pipeline project filed by J. Moffatt.2
08/12/2008Letter regarding the Rockies Express Pipeline, LLC project filed by S. Howe. 3
08/08/2008Correspondence concerning Rockies Express Pipeline filed by S. Howe.24
08/08/2008Correspondence concerning Rockies Express Pipeline filed by S. Howe.3
08/08/2008Correspondence concerning Rockies Express Pipeline filed by S. Howe.3
08/08/2008Correspondence concerning Rockies Express Pipeline filed by S. Howe.2
08/08/2008Correspondence concerning Rockies Express Pipeline filed by L. Turner.2
08/08/2008Correspondence concerning Rockies Express Pipeline filed by R. Murray. (Ohio)2
08/08/2008Correspondence concerning Rockies Express Pipeline filed by A. Lykens. (Ohio)2
08/08/2008Correspondence concerning Rockies Express Pipeline filed by S. Howe.2
08/08/2008Correspondence concerning Rockies Express Pipeline filed by J. Glass.2
08/08/2008Correspondence concerning Rockies Express Pipeline filed by J. Peconom.2
08/08/2008Correspondence concerning Rockies Express Pipeline filed by J. Glass.2
08/08/2008Correspondence concerning Rockies Express Pipeline filed by S. Howe.2
08/08/2008Correspondence concerning Rockies Express Pipeline filed by M. and G. Yane.1
08/08/2008Correspondence concerning Rockies Express Pipeline filed by J. Glass.1
08/08/2008Correspondence concerning Rockies Express Pipeline filed by J. Glass. 1
08/08/2008Correspondence concerning Rockies Express Pipeline filed by S. Howe.4
08/08/2008Weekly Report for the week ending July 30, 2008 regarding the Rockies Express Pipeline, filed by C. C. Moffit.15
08/08/2008Correspondence concerning Rockies Express Pipeline filed by S. Howe. 2
08/04/2008Correspondence letter regarding the Rockies Express Pipeline LLC, REX-East project replacement pages for Cultural Resources Survey Coverage Maps for Spreads A-1, B, C and D, filed by S. Howe.3
08/04/2008Letter regarding the Rockies Express Pipeline LLC, project order granting rehearing for further consideration filed by K. Bose.2
08/04/2008Letter regarding the Rockies Express Pipeline LLC, project authorization to start construction of Spread D filed by L. Turner.2
08/04/2008Correspondence letter regarding the Rockies Express Pipeline LLC, REX-East projects request for Notice to Proceed- Spread E privileged and confidential versions of alignment sheets for request for notice to proceed, filed by S. Howe.2
08/04/2008Letter regarding the Rockies Express Pipeline LLC project notice of technical conference filed by K. Bose.2
08/04/2008Letter regarding the Rockies Express Pipeline LLC REX-East project cultural information for travel lanes in Ohio, CP07-208 Attachment A - C (Ohio), filed by S. Howe.6
08/04/2008Correspondence letter regarding memorandum of agreement for the Rockies Express Pipeline LLC project filed by J. Glenn.6
08/04/2008Letter regarding the Rockies Express Pipeline LLC Weekly Report #5, period ending July 23, 2008. filed by S. Howe.14
08/04/2008Letter regarding the Rockies Express Pipeline LLC (REX) weekly report #15, July 26, 2008, covering Phase 2 activities at the Big Hole Compressor Station, filed by R. Harrington.4
07/25/2008Correspondence regarding the Rockies Express Pipeline Project filed by P. Schaub. (Ohio)2
07/25/2008Correspondence regarding the Rockies Express Pipeline Project filed by J. Moffatt.6
07/25/2008Correspondence regarding the Rockies Express Pipeline Project filed by S. Howe.7
07/25/2008Correspondence regarding the Rockies Express Pipeline Project filed by L. Turner. 3
07/25/2008Correspondence regarding the Rockies Express Pipeline Project filed by S. Howe. (Ohio)55
07/25/2008Correspondence regarding the Rockies Express Pipeline Project filed by J. Waters.4
07/25/2008Correspondence regarding the Rockies Express Pipeline Project filed by S. Howe.49
07/25/2008Correspondence regarding the Rockies Express Pipeline Project filed by L. Turner.3
07/25/2008Correspondence regarding the Rockies Express Pipeline Project filed by F. Clark.2
07/25/2008Correspondence regarding the Rockies Express Pipeline Project filed by S. Howe. (Ohio)162
07/25/2008Correspondence regarding the Rockies Express Pipeline Project filed by L. Turner.3
07/25/2008Correspondence regarding the Rockies Express Pipeline Project filed by J. Smith. (Ohio)2
07/25/2008Correspondence regarding the Rockies Express Pipeline Project filed by M. Tandon.35
07/25/2008Correspondence regarding the Rockies Express Pipeline Project filed by P. King.2
07/25/2008Correspondence regarding the Rockies Express Pipeline Project filed by J. Glass.1
07/25/2008Correspondence regarding the Rockies Express Pipeline Project filed by J. Glass.7
07/25/2008Correspondence regarding the Rockies Express Pipeline Project filed by S. Howe.45
07/25/2008Correspondence regarding the Rockies Express Pipeline Project filed by J. Glass.1
07/18/2008Letter regarding the Rockies Express Pipeline LLC ("Rockies Express") project.3
07/18/2008Letter regarding the Rockies Express Pipeline LLC ("Rockies Express") project.3
07/18/2008Letter regarding the Rockies Express Pipeline LLC ("Rockies Express") project.1
07/18/2008Letter regarding the Rockies Express Pipeline LLC ("Rockies Express") project.5
07/18/2008Letter regarding the Rockies Express Pipeline LLC ("Rockies Express") project.1
07/18/2008Letter regarding the Rockies Express Pipeline LLC ("Rockies Express") project.3
07/18/2008Letter regarding the Rockies Express Pipeline LLC ("Rockies Express") project.68
07/18/2008Letter regarding the Rockies Express Pipeline LLC ("Rockies Express") project.10
07/18/2008Letter regarding the Rockies Express Pipeline LLC ("Rockies Express") project.5
07/18/2008Letter regarding the Rockies Express Pipeline LLC ("Rockies Express") project.18
07/18/2008Letter regarding the Rockies Express Pipeline LLC ("Rockies Express") project.12
07/18/2008Letter regarding the Rockies Express Pipeline LLC ("Rockies Express") project.10
07/18/2008Letter regarding the Rockies Express Pipeline LLC ("Rockies Express") project.3
07/18/2008Letter regarding the Rockies Express Pipeline LLC ("Rockies Express") project.4
07/18/2008Letter regarding the Rockies Express Pipeline LLC ("Rockies Express") project.7
07/18/2008Letter regarding the Rockies Express Pipeline LLC ("Rockies Express") project.5
07/16/2008Letter asking that REX Pipeline is kept out of Caesar's Creek State Park filed by Genevieve & David Schreyver concerned citizens. 1
07/11/2008Letter stating the REX's - East Project information to supplement its application filed by S. Howe. 32
07/11/2008Letter approving the request to start construction of the Spread B and the American Meter Station to the Rockies Express Pipeline Project filed by A. M. Lykens, Chief Gas Branch 2. 3
07/11/2008Letter express concern over the Rockies Express Pipeline Project on behalf of the Village of Mount Zion and Macon County, Illinois filed by J. Kelliher, Chairman. 2
07/11/2008Weekly report #2 for activities for the week ending July 2, 2008, filed by S. Howe on behalf of Rockies Express Pipeline LLC. 6
07/11/2008Letter stating Rockies Express Pipeline hereby clarifies and revises the alignment sheets and data tables previously filed with the Federal Energy Regulatory Commission filed by S. Howe. 4
07/11/2008Letter approving the request to use the Decatur Contractor Yard filed by L. Turner Environmental Project Manager Gas Branch 2. 2
07/11/2008Letter expressing concern over the Rockies Express Pipeline Project filed by J. Kelliher, Chairman. 1
07/08/2008Letter pertaining to the Rockies Express Pipeline LLC, installation of a 622 mile long natural gas pipeline through Illinois, Indiana and Ohio filed by J. Glass PhD on behalf of DNR Indiana Department of Natural Resources. 1
07/08/2008Letter pertaining to the Rockies Express Pipeline LLC installation of a 622 mile long natural gas pipeline through Illinois, Indiana and Ohio filed by J. Glass, PhD on behalf of DNR Indiana Department of Natural Resources. 1
07/08/2008Letter notifying the Commission that Rockies Express Pipeline, LLC has accepted the Commission's order filed by S. Howe. 2
07/08/2008Map of the Decatur contractor yard in Macon County, Illinois involving the Rockies Express Pipeline-East Project. 1
07/08/2008Letter stating the structure of the landlord, tenant relationship concerning the Rockies Express Pipeline project. 1
07/08/2008Report of the Decatur contractor yard in Macon County, Illinois involving the Rockies Express Pipeline-East Project. 1
07/08/2008Map of the Decatur contractor yard in Macon County, Illinois involving the Rockies Express Pipeline-East Project. 1
07/08/2008Correspondence regarding the Biological Assessment, filed by various interested parties on behalf of Rockies Express Pipeline, LLC. 8
07/08/2008Letter requesting a notice to proceed and to commence certain construction activities associated with the Rockies Express Pipeline Project by and on behalf of Rockies Pipeline Express, LLC. 18
07/08/2008Letter clarifying the previous ATWS and Route Changes tables filed for the REX-East Project, filed on behalf of Rockies Express Pipeline, LLC by S. Howe. 8
07/08/2008Letter of notice of commencement of construction filed by R. Harrington, President on behalf of Rockies Express Pipeline, LLC.3
07/08/2008Letter clarifying ATWS and the route change table; Decatur contractor yard and residences near the right of way that were previously submitted to the Commission, filed by S. Howe on behalf of Rockies Express Pipeline LLC. 11
07/08/2008Letter concerning the signature page of the Commission issued memorandum agreement for the Rockies Express Pipeline Project in Missouri, filed by S. Howe. 13
07/07/2008Rockies Express Pipeline LLC weekly construction progress report #1, period ending June 25, 2008 filed by J. Moffatt.4
07/03/2008Correspondence regarding the Rockies Express East Pipeline Project filed by M. Detcher. (Ohio)11
07/03/2008Correspondence letter expressing concern over the Rowe Variation filed by C. Carmichael. (Ohio)2
07/03/2008Signed memorandum of agreement for the Rockies Express Pipeline East Project in Illinois filed by S. Howe.16
07/03/2008Letter urging the FERC not to approve the Condition 50 Plan filed on behalf of Murray Energy Corp. et al. by J. Waters. 4
07/03/2008Revised construction exclusion tables, table 2-4 filed on behalf of the Rockies Express Pipeline LLC by S. Howe. 24
07/03/2008Letter approving the request to start construction of the Blue Mound Compressor Station in Illinois filed by L. Turner. 2
07/03/2008Revised data tables filed on behalf of Rockies Express Pipeline LLC by S. Howe. 12
06/27/2008Correspondence letter regarding the Rockies Express East Pipeline project filed by P. Campbell King.2
06/27/2008Correspondence letter regarding the Rockies Express East Pipeline project filed by S. Howe. (Ohio)15
06/27/2008Correspondence letter regarding the Rockies Express East Pipeline project filed by S. Howe.2
06/27/2008Correspondence letter regarding the Rockies Express East Pipeline project filed by J. Curtis Moffatt.5
06/27/2008Correspondence letter regarding the Rockies Express East Pipeline project filed by M. Smith.5
06/27/2008Correspondence regarding the REX-East Project filed by J. Moffatt on behalf of Rockies Express Pipeline LLC.2
06/25/2008Correspondence letter regarding the Rockies Express East Project compressor station plot plans filed on behalf of Rockies Express Pipeline LLC by S. Howe. (Ohio)2
06/25/2008Letter notifying the Federal Energy Regulatory Commission of the filing of supplemental information to the Rockies Express East Project's application filed on April 30, 2007, filed on behalf of Rockies Express Pipeline LLC by S. Howe. (Ohio)2
06/25/2008Letter authorizing the start of construction of the Arlington and Bertrand compressor stations filed on behalf of the Federal Energy Regulatory Commission by A. Lykens. 2
06/25/2008Second and final notice of workshop on regulatory compliance filed by K. Bose, FERC.4
06/24/2008Correspondence letter regarding the Rockies Express East Pipeline project filed by C. Carmichael. (Ohio)2
06/24/2008Correspondence letter regarding the Rockies Express East Pipeline project filed by J. Smith PhD. (Ohio)2
06/24/2008Request for notice to proceed filed on behalf of Rockies Express Pipeline LLC by J. Moffatt.2
06/24/2008Request for notice to proceed-Cloverdale Contractor Yard filed by J. Moffatt on behalf of Rockies Express Pipeline LLC. (Ohio)2
06/24/2008Revised request for notice to proceed filed by J. Moffatt. 3
06/23/2008Correspondence stating that the section 106 process has been completed for the facilities requested and that the requirements of certificate condition 141 have been met, filed on behalf of the Rockies Express Pipeline LLC by S. Howe. (Ohio)3
06/23/2008Request for notice to commence construction at the Ameren Meter Station filed on behalf of Rockies Express Pipeline LLC by M. Tandon. 31
06/20/2008Correspondence in regard to Rockies Express Pipeline, LLC filed by J. Kelliner.1
06/20/2008Correspondence in regard to Rockies Express Pipeline, LLC filed by D. Hanselmann.3
06/20/2008Correspondence in regard to the Rockies Express Pipeline, LLC filed by G. Brunton.20
06/16/2008Correspondence concerning Rockies Express Pipeline filed by J. Kelliher. (Ohio)1
06/16/2008Correspondence concerning Rockies Express Pipeline filed by J. Kelliher. (Ohio)1
06/16/2008Correspondence concerning Rockies Express Pipeline filed by J. Kelliher. (Ohio)1
06/16/2008Correspondence concerning Rockies Express Pipeline filed by J. Kelliher. (Ohio)1
06/16/2008Correspondence concerning Rockies Express Pipeline filed by J. Kelliher. (Ohio)1
06/16/2008Correspondence concerning Rockies Express Pipeline filed by J. Kelliher. (Ohio)1
06/16/2008Correspondence concerning Rockies Express Pipeline filed by J. Kelliher. (Ohio)1
06/16/2008Correspondence concerning Rockies Express Pipeline filed by J. Kelliher. (Ohio)1
06/16/2008Correspondence concerning Rockies Express Pipeline filed by J. Kelliher. (Ohio)1
06/16/2008Correspondence concerning Rockies Express Pipeline filed by J. A. Husted. (Ohio)2
06/16/2008Correspondence concerning Rockies Express Pipeline filed by J. C. Moffat. 2
06/16/2008Correspondence concerning Rockies Express Pipeline filed by A. Lykens. (Ohio)3
06/16/2008Correspondence concerning Rockies Express Pipeline filed by D. Gadd. (Ohio)16
06/16/2008Correspondence concerning Rockies Express Pipeline filed by J. C. Moffat. 17
06/16/2008Correspondence concerning Rockies Express Pipeline filed by J. C. Moffat. 6
06/16/2008Correspondence concerning Rockies Express Pipeline filed by M. Pence.6
06/16/2008Correspondence concerning Rockies Express Pipeline filed by C. Carmichael. (Ohio)2
06/16/2008Correspondence concerning Rockies Express Pipeline filed by S. Howe.32
06/16/2008Correspondence concerning Rockies Express Pipeline filed by J. C. Moffat. 2
06/16/2008Correspondence concerning Rockies Express Pipeline filed by S. Mauer. (Ohio)7
06/16/2008Correspondence concerning Rockies Express Pipeline filed by A. Lykens.2
06/16/2008Correspondence concerning Rockies Express Pipeline filed by J. C. Moffiat. 3
06/16/2008Correspondence concerning Rockies Express Pipeline filed by J. C. Moffiat. 2
06/16/2008Correspondence regarding Rockies Express Pipeline LLC filed by J. Glass.1
06/16/2008Correspondence regarding Rockies Express Pipeline LLC filed by B, Chase.3
06/16/2008Correspondence regarding Rockies Express Pipeline LLC filed by J, Rowe.3
06/16/2008Correspondence regarding Rockies Express Pipeline LLC filed by J, Moffatt.55
06/16/2008Correspondence regarding Rockies Express Pipeline LLC filed by J. Kelliher.1
06/16/2008Correspondence in regard to Rockies Express Pipeline LLC filed J. Kelliher.1
06/04/2008Correspondence regarding FERC authorizes REX East Pipeline to transport Rockies gas to markets. (Ohio)3
06/04/2008Correspondence regarding REX East Project filed by J. Kelliher. (Ohio)1
06/04/2008Correspondence regarding REX East Project filed by J. Kelliher. (Ohio)1
06/04/2008Correspondence regarding REX East Project filed by T. Johnson.1
06/04/2008Correspondence regarding REX East Project filed by J. Kelliher.1
06/04/2008Request of Rockies Express for written authorization to commence construction at the listed locations filed by C. Moffatt.53
06/04/2008Correspondence regarding the Rockies Express Pipeline Project filed by R. Harrington.3
06/04/2008Correspondence letter regarding the Rockies Express Pipeline Project filed by J. Kelliher.1
06/04/2008Request of Rockies Express for written authorization to commence construction on the listed locations filed by C. Moffatt.30
06/02/2008Order issuing certificate filed by FERC.84
06/02/2008News release regarding REX East Project filed by FERC. (Ohio)3
06/02/2008Correspondence regarding REX East Project filed by J. Kelliher.1
06/02/2008Correspondence regarding REX East Project filed by C. Wilson. (Ohio)1
05/30/2008Correspondence regarding the REX East Project filed by P. King.6
05/30/2008Correspondence regarding the REX East Project filed by M. Carey.3
05/30/2008Correspondence regarding the REX East Project filed by J. Smith. (Ohio)2
05/30/2008Correspondence regarding the REX East Project filed by N. Mowrey. (Ohio)2
05/30/2008Correspondence regarding the REX East Project filed by M. Pence.6
05/30/2008Correspondence regarding the REX East Project filed by R. Lugar.2
05/30/2008Correspondence regarding the REX East Project filed by J. Smith. (Ohio)2
05/30/2008Correspondence regarding the REX East Project filed by J. Smith. (Ohio)2
05/30/2008Correspondence regarding the REX East Project filed by K. Kellher.2
05/30/2008Correspondence regarding the REX Pipeline filed by M. Yane.2
05/30/2008Correspondence regarding the proposed REX East project filed by M. Pence.6
05/30/2008Correspondence regarding the REX Pipeline filed by S. Howe. (Ohio)22
05/22/2008Correspondence regarding the REX East Project filed by J. Smith.2
05/22/2008Correspondence regarding the REX East Project filed by N. Mowrey.3
05/22/2008Correspondence regarding the REX East Project filed by M. Costigan.2
05/22/2008Correspondence regarding the REX East State Agricultural Impact Mitigation Agreements (AIMA) filed by J. Moffatt.58
05/22/2008Correspondence regarding the REX East Project filed by C. Wilson.1
05/22/2008Correspondence regarding the REX East Project filed by H. Quinn, Jr. on behalf of the National Mining Association.3
05/20/2008Correspondence regarding the REX East Project filed by J. Rust.(Indiana)5
05/20/2008Correspondence regarding the REX East Project filed by R. Hutchison (Ohio)7
05/20/2008Correspondence regarding the REX East Project filed by N. Mowrey. (Ohio)7
05/19/2008Correspondence regarding the REX East Project filed by J. Hyde.2
05/19/2008Correspondence regarding the REX East Project filed by Senator E. Bayh.9
05/19/2008Correspondence regarding the REX East Project filed by S. Howe.2
05/19/2008Correspondence regarding the REX East Project filed by City of Monroe council members. (Ohio)11
05/19/2008Correspondence regarding the REX East Project filed by Senator G. Voinovich. (Ohio)2
05/16/2008Correspondence regarding the REX East Project filed by J. Kelliher.2
05/16/2008Correspondence regarding the REX East Project filed by FERC.2
05/16/2008Correspondence regarding the REX East Project filed by J. Rowe.2
05/16/2008Correspondence regarding the REX East Project filed by FERC.2
05/16/2008Correspondence regarding the REX East Project filed by J. Kelliher.1
05/16/2008Correspondence regarding the REX East Project filed by FERC.3
05/16/2008Correspondence regarding the REX East Project filed by FERC.3
05/15/2008Correspondence regarding the REX East Project filed by B. Kelley.1
05/15/2008Correspondence regarding the REX East Project filed by C. Carmichael.2
05/15/2008Correspondence regarding the REX East Project filed by J. Glass.2
05/15/2008Correspondence regarding the REX East Project filed by P. King.4
05/15/2008Correspondence regarding the REX East Project filed by J. Waters and R. McCrum.5
05/15/2008Correspondence regarding the REX East Project filed by S. Howe.2
05/15/2008Correspondence regarding the REX East Project filed by S. Howe.15
05/13/2008Correspondence regarding the REX East Project filed by J. Moffatt.2
05/13/2008Correspondence regarding the REX East Project filed by J. Smith.2
05/13/2008Supplemental information regarding REX-East Project filed by FERC.1
05/13/2008Correspondence regarding the REX East Project filed by J. Smith.2
05/13/2008Correspondence regarding the REX East Project filed by J. Forman.3
05/13/2008Correspondence regarding the REX East Project filed by P. King.3
05/13/2008Correspondence regarding the REX East Project filed by D. Hobson.2
05/13/2008Correspondence regarding the REX East Project filed by B. Newsome.2
05/13/2008Correspondence regarding the REX East Project filed by J. Forman.5
05/13/2008Correspondence regarding the REX East Project filed by L. Lewis.2
05/09/2008Correspondence regarding the REX East Project filed by J. Moffatt.9
05/09/2008Correspondence regarding the REX East Project filed by N. Holscher. (Ohio)3
05/09/2008Correspondence regarding the REX East Project filed by J. Smith. (Ohio)3
05/09/2008Correspondence regarding the REX East Project filed by H. Gilzow.4
05/09/2008Correspondence regarding the REX East Project filed by C. Rowe. (Ohio)3
05/09/2008Initial Implementation Plan for the REX-East Project filed by S. Howe on behalf of Rockies Express Pipeline LLC.47
05/06/2008Letter expressing concern of the Rockies Express Project filed by J. Rust 9
05/06/2008Letter with the concerns of the Village of Mt. Zion filed by J. Potts.2
05/06/2008Letter regarding potential conflicts between the proposed Rockies Express-East Project and certain mining operations in Ohio filed by A. Lykens, FERC. (Ohio)4
05/02/2008Correspondence regarding the REX East Project filed by J. Rust.4
05/02/2008Correspondence regarding the REX East Project filed by J. Smith. (Ohio) 2
05/02/2008Response regarding the proposed REX Project filed by P. King on behalf of Hoosier Hills Regional Water District. 22
05/02/2008Letter in regards to Rockies Express Pipeline East project filed by D. Lake. 3
05/02/2008Letter in regards to Rockies Express Pipeline East project filed by D. Mowrey. 2
05/02/2008Letter in regards to Rockies Express Pipeline East project filed by L. Branzman. 21
04/25/2008Correspondence supporting the recommendation of the Ohio Power Siting Board and ODNR-DNAP, that an alternative that avoids Caesar's Creek State Park and Crosses the Little Miami below the reservoir be considered as a preferred route filed on behalf of and by concerned consumer. (Ohio)2
04/25/2008Letter regarding the Rockies Express Pipeline project filed by M. Detcher.1
04/25/2008Letter regarding the Rockies Express Pipeline project filed by G. Alford. (Ohio)5
04/25/2008Letter regarding the Rockies Express Pipeline project filed by J. Smith PhD. (Ohio)2
04/25/2008Letter regarding the Rockies Express Pipeline project filed by J. Kelliher.1
04/25/2008Letter regarding the Rockies Express Pipeline project filed by J. Kelliher.1
04/25/2008Letter in regards to the Rockies Express Pipeline project filed by N. Mowrey. (Ohio)2
04/18/2008Impact statement continued. (Part 3 of 3)57
04/18/2008Impact statement continued. (Part 2 of 3)200
04/18/2008Final environmental impact statement for the Rockies Express East Project. (Part 1 of 3)200
04/18/2008Correspondence regarding the Rockies Express East Pipeline Project filed by J. Rust. 2
04/18/2008Correspondence stating that Appendixes A-O are available for viewing and downloading on the FERC website. 1
04/18/2008Correspondence regarding the Rockies Express East Pipeline Project filed by C. Rowe. 1
04/17/2008Correspondence letter regarding the Rockies Express Pipeline East Project filed by J. Smith. (Ohio)2
04/17/2008Correspondence letter regarding the Rockies Express East Project filed by G. Alford. 2
04/17/2008Congressional Submittal from US Senator Richard G Lugar requesting FERC to direct their reply regarding their findings to his Washington Office. 1
04/17/2008Correspondence letter opposing the proposed site of the Bainbridge Compressor Station filed by T. Branson. 3
04/17/2008Correspondence letter regarding the Rockies Express East Pipeline Project filed by D. Schaffer. (Ohio)4
04/17/2008Correspondence letter regarding the Rockies Express East Pipeline Project filed by B. Kelley. (Ohio)2
04/17/2008Correspondence letter regarding the Rockies Express East Pipeline Project filed by H. Profitt. 3
04/17/2008Correspondence letter regarding the Rockies Express East Pipeline Project filed by T. Branson. 2
04/17/2008Correspondence letter regarding the Rockies Express East Pipeline Project filed by J. Rust. 3
04/17/2008Supplemental information to the application filed on April 30, 2007 with the Federal Energy Regulatory Commission by Rockies Express Pipeline LLC, filed by S. Howe. 86
04/15/2008Correspondence supporting the recommendation of the Ohio Power Siting Board and ODNR-DNAP, that an alternative that avoids Caesar's Creek State Park and Crosses the Little Miami below the reservoir be considered as a preferred route filed by M. Moore. (Ohio)2
04/14/2008Correspondence supporting the recommendation of the Ohio Power Siting Board and ODNR-DNAP, that an alternative that avoids Caesar's Creek State Park and Crosses the Little Miami below the reservoir be considered as a preferred route filed by concerned consumer. (Ohio)2
04/11/2008Correspondence letter expressing concern over the Rockies Express East Pipeline Project filed by J. Nugent. 2
04/11/2008Correspondence letter opposing the proposed site of the Bainbridge Compressor station filed by T. and C. Branson. 2
04/11/2008Correspondence letter expressing concern over the proposed construction routes of the Rockies Express East Pipeline Project filed by C. Stirn. 1
04/11/2008Correspondence letter requesting findings and views in duplicate form along with the return of the enclosure should be directed to Darlee McCollum filed by R. Lugar. 1
04/11/2008Notice of availability of the final environmental impact statement for the proposed Rockies Express East Pipeline Project filed on behalf of the FERC by K. Bose. 4
04/11/2008Correspondence letter regarding the Rockies Express East Pipeline Project filed by A. and C. Stirn, D. Oetzel, and B. Schulte. 3
04/11/2008Correspondence letter regarding the Rockies Express East Pipeline Project.1
04/11/2008Correspondence letter regarding the Rockies Express East Pipeline Project filed by S. Parker. 3
04/11/2008Correspondence letter regarding the Rockies Express East Pipeline Project filed by J. Forman. (Ohio) 14
04/11/2008Biological opinion in response to Rockies Express Pipeline letter, filed on behalf of the United States Department of the Interior Fish and Wildlife Service by B. Kelly.8
04/11/2008Correspondence letter regarding the Rockies Express East Pipeline project filed by D. Abney. 6
04/11/2008Reply to answer of Rockies Express Pipeline LLC in opposition to motion to intervene out of time filed on behalf of Murray Energy Corporation by J. Waters. 5
04/11/2008Correspondence letter regarding the Rockies Express East Pipeline project filed by J. Rust. 4
04/09/2008Correspondence supporting the recommendation of the Ohio Power Siting Board and ODNR-DNAP, that an alternative that avoids Caesar's Creek State Park and Crosses the Little Miami below the reservoir be considered as a preferred route filed by P. Marshall.2
04/08/2008Guidelines for achieving compliance with the migratory bird treaty act and Executive Order No. 13186 through voluntary conservation measures, regarding the Rockies Express East Pipeline Project filed by M. Kochhar on behalf of Rockies Express Pipeline LLC and U.S. Fish and Wildlife Service.28
04/08/2008Correspondence letter regarding the Rockies Express East Pipeline Project filed by D. & R. Kile. (Ohio)2
04/08/2008Correspondence letter regarding the Rockies Express East Pipeline Project filed by J. Kellher.1
04/08/2008Correspondence letter regarding the Rockies Express East Pipeline Project filed by Congressman Zack Space. (Ohio)3
04/08/2008Correspondence stating that FERC approves an $85.7 Million settlement stemming from its investigation into wholesale power markets during Western energy crisis of 2000-2001 reported by B. Connors, news media contact.2
04/08/2008Correspondence letter regarding the Rockies Express East Pipeline Project filed by S. Parker.2
04/08/2008Correspondence letter regarding the Rockies Express East Pipeline Project filed by A. Black.1
04/08/2008Correspondence letter regarding the Rockies Express East Pipeline Project filed by J. Moffatt.4
04/08/2008Correspondence letter regarding the Rockies Express East Pipeline Project filed by N. Mowrey. (Ohio)3
04/08/2008Correspondence letter regarding the Rockies Express East Pipeline Project filed by J. Rowe. (Ohio)4
04/08/2008Correspondence letter regarding the Rockies Express East Pipeline Project filed by C. Stirn.1
04/08/2008Correspondence letter regarding the Rockies Express East Pipeline Project filed by Congressman M. Turner. (Ohio 3rd District)3
04/08/2008Correspondence letter regarding the Rockies Express East Pipeline Project filed by J. Smith, PhD. (Ohio)2
04/02/2008Correspondence in opposition of Rocky Mountain Express Pipeline East filed by James and Jennifer Ledbetter. (Ohio)2
04/02/2008Correspondence opposing Rocky Mountain Express East filed by M. Hall. (Ohio)2
03/31/2008Memorandum requesting to place letter from property owner John Forman and record of phone communication of 3/13/2008 into the public file for the Rockies Express East Pipeline Docket filed by E. Onge.5
03/31/2008Correspondence letter regarding biological assessment for the Rockies Express East Project and request for FWS Concurrence and FOIA request filed by R. Clark. 4
03/31/2008Correspondence letter regarding the Rockies Express East Pipeline Project filed by J. Kelliher. 3
03/31/2008Correspondence letter regarding biological assessment for the Rockies Express East Project and request for FWS Concurrence and FOIA request filed by R. Clark. 4
03/31/2008Correspondence letter regarding the Rockies Express East Pipeline Project filed by J. Kelliher. 3
03/31/2008Motion to intervene of North Dearborn Water Corporation, Franklin County Water Association, Inc., Tri-Township Water Corporation filed by N. Shoultz. 5
03/31/2008Correspondence letter regarding the Rockies Express East Pipeline Project filed by J. Forman. (Ohio)2
03/31/2008Correspondence letter regarding the Rockies Express East Pipeline Project filed by C. Duncan. 11
03/31/2008Correspondence letter regarding the Rockies Express East Pipeline Project filed by S. Jones. (Ohio)7
03/31/2008Motion to intervene of North Dearborn Water Corporation, Franklin County Water Association, Inc. Tri-Township Water Corporation by N. Shoultz. 10
03/31/2008Correspondence letter regarding the Rockies Express East Pipeline Project filed by M. Hartley. 1
03/31/2008Correspondence letter regarding submittal of biological assessment and request for concurrence for the Rockies Express East Project filed by A. Lykens. 5
03/31/2008Correspondence letter expressing concern over the proposed route of the Rockies Express Pipeline through Franklin County, Indiana filed by J. Worth. 4
03/31/2008Correspondence letter requesting that FERC require Rockies Express to re-survey property located between mile marker 521 and 522 in Pickaway County, Ohio filed by C. McCloskey. (Ohio)1
03/28/2008Correspondence supporting the recommendation of the Ohio Power Siting Board and ODNR-DNAP, that an alternative that avoids Caesar's Creek State Park and Crosses the Little Miami below the reservoir be considered as a preferred route filed by S. Fawley. (Ohio)2
03/28/2008Correspondence supporting the recommendation of the Ohio Power Siting Board and ODNR-DNAP, that an alternative that avoids Caesar's Creek State Park and Crosses the Little Miami below the reservoir be considered as a preferred route. (Ohio)2
03/28/2008Correspondence supporting the recommendation of the Ohio Power Siting Board and ODNR-DNAP, that an alternative that avoids Caesar's Creek State Park and Crosses the Little Miami below the reservoir be considered as a preferred route filed by Rattan. (Ohio)2
03/28/2008Correspondence supporting the recommendation of the Ohio Power Siting Board and ODNR-DNAP, that an alternative that avoids Caesar's Creek State Park and Crosses the Little Miami below the reservoir be considered as a preferred route filed by M. Fawley. (Ohio)2
03/28/2008Correspondence supporting the recommendation of the Ohio Power Siting Board and ODNR-DNAP, that an alternative that avoids Caesar's Creek State Park and Crosses the Little Miami below the reservoir be considered as a preferred route filed by W. Anderson. (Ohio)2
03/28/2008Correspondence supporting the recommendation of the Ohio Power Siting Board and ODNR-DNAP, that an alternative that avoids Caesar's Creek State Park and Crosses the Little Miami below the reservoir be considered as a preferred route filed by D. Tayler. (Ohio)2
03/28/2008Correspondence supporting the recommendation of the Ohio Power Siting Board and ODNR-DNAP that an alternative that avoids Caesar's Creek State Park and Crosses the Little Miami below the reservoir be considered as a preferred route filed by L. Mays.2
03/26/2008Correspondence letter regarding the Rockies Express Pipeline filed by consumer.1
03/26/2008Correspondence regarding the Rockies Express-East Interstate Natural Gas Pipeline Project, that was inadvertently docketed in case no. 07-171-EL-BTX, filed by K. Lambeck, OPSB.1
03/26/2008Correspondence letter regarding Rockies Express-East Pipeline, LLC that was inadvertently docketed in case no. 07-171-EL-BTX, filed by K. Lambeck, OPSB.1
03/26/2008Response letter sent to R. Surrell filed by K. Lambeck, OPSB.2
03/26/2008Response letter sent to J. Schock filed by K. Lambeck, OPSB.2
03/25/2008Correspondence letter regarding REX East Pipeline filed by J. Smith. (Ohio)2
03/25/2008Correspondence letter regarding the REX East Pipeline Project filed by Rep. R. Bischoff. (Indiana)3
03/25/2008Correspondence letter concerning the REX East Pipeline Project filed by J. Keilliher on behalf of Mr. and Mrs. L. Chastain. (Indiana)2
03/25/2008Correspondence letter from Rep. T. Johnson regarding the REX Pipeline Project.3
03/24/2008Correspondence concerning Rockies Express Pipeline filed by Dr. John P. Jackson. (Ohio)3
03/24/2008Correspondence concerning Rockies Express Pipeline filed by Andy Stim. 8
03/24/2008Correspondence concerning the Rockies Express Pipeline filed by Virgil B. Stillion. (Ohio)2
03/24/2008Correspondence concerning Rockies Express Pipeline filed by Curtis Moffatt. 3
03/24/2008Correspondence concerning Rockies Express Pipeline filed by John M. Forman. (Ohio)6
03/19/2008Correspondence concerning Rockies Express Pipeline filed by J. Smith. (Ohio)3
03/19/2008Correspondence concerning Rockies Express Pipeline filed by L. Turner.3
03/19/2008Correspondence concerning Rockies Express Pipeline filed by J. Smith. (Ohio)2
03/18/2008Correspondence concerning Rocky Express Pipeline filed by B. Schults. (Indiana)5
03/18/2008Correspondence concerning Rocky Express Pipeline East filed by J. Smith. (Ohio)2
03/18/2008Correspondence of joint motion to intervene out-of-time of Murray Energy Corporation, Consolidated Land Company, and American Energy Corporation filed by J. Waters. (Ohio)9
03/17/2008Correspondence regarding the Rockies Express Pipeline filed by C. McCloskey. (Ohio)1
03/17/2008Correspondence letter regarding the Rockies Express Pipeline filed by J. Smith.1
03/14/2008Correspondence concerning Rockies Express Pipeline, LLC filed by R. Lugar.2
03/14/2008Correspondence concerning Rockies Express Pipeline, LLC filed by R. Lugar.4
03/14/2008Correspondence concerning Rockies Express Pipeline, LLC filed by J. Forman. (Ohio)7
03/14/2008Correspondence concerning Rockies Express Pipeline, LLC filed by N. Mowrey. (Ohio)3
03/14/2008Correspondence concerning Rockies Express Pipeline, LLC filed by J. Smith.3
03/14/2008Correspondence concerning Rockies Express Pipeline, LLC filed by L. Franzman.1
03/14/2008Correspondence concerning Rockies Express Pipeline, LLC filed by C. McCloskey.3
03/14/2008Correspondence concerning Rockies Express Pipeline, LLC filed by D. & J. Oetzel.1
03/14/2008Correspondence concerning Rockies Express Pipeline, LLC filed by J. Smith.2
03/14/2008Correspondence concerning Rockies Express Pipeline, LLC filed by K. Farro.1
03/14/2008Correspondence concerning Rockies Express Pipeline, LLC filed by S. Lowry.5
03/14/2008Correspondence concerning Rockies Express Pipeline, LLC filed by B. Chase.3
03/14/2008Correspondence concerning Rockies Express Pipeline, LLC filed by J. Smith.2
03/07/2008Correspondence concerning Rockies Express Pipeline, LLC filed by N. Mowrey.3
03/07/2008Correspondence concerning Rockies Express Pipeline, LLC filed by B. and R. Lecher.1
03/07/2008Correspondence concerning Rockies Express Pipeline, LLC filed by J. Moffatt.8
03/07/2008Correspondence concerning Rockies Express Pipeline, LLC filed by J. Moffatt.8
03/07/2008Correspondence concerning Rockies Express Pipeline, LLC filed by M. Fellerhoff.4
03/07/2008Correspondence concerning Rockies Express Pipeline, LLC filed by R. Profitt.5
03/07/2008Correspondence concerning Rockies Express Pipeline, LLC filed by R. Childs.8
03/07/2008Correspondence concerning Rockies Express Pipeline, LLC filed by the Stirn family.6
03/07/2008Correspondence concerning Rockies Express Pipeline, LLC filed by consumer.1
03/07/2008Correspondence concerning Rockies Express Pipeline, LLC filed by R. Harrington.8
03/07/2008Correspondence concerning Rockies Express Pipeline, LLC filed by A. Stirn.6
03/04/2008Official comment of Elrod Water Company, Inc. dba Hoosier Hills Regional Water District in reply to Rockies Express' response to FERC's February 8 Environmental information request and to newly-disclosed developments filed by G. Dole and P. King.7
03/04/2008Correspondence concerning Rockies Express Pipeline, LLC filed by D. Parrish.2
03/04/2008Correspondence concerning Rockies Express Pipeline filed by D. Gadd.2
03/04/2008Correspondence concerning the Rockies Express Pipeline, LLC requesting authorization of the construction and operation filed by S. Howe. 4
03/04/2008Correspondence concerning the Rockies Express Pipeline LLC, REX-East Project filed by S. Howe. (Ohio)40
03/03/2008Correspondence concerning Rockies Express Pipeline filed by the Stirn family. 4
03/03/2008Correspondence concerning Rockies Express Pipeline filed by B. and R. Lecher. 2
03/03/2008Correspondence concerning Rockies Express Pipeline filed by C. Rowe. (Ohio)2
03/03/2008Correspondence concerning Rockies Express Pipeline filed by J.C. Moffatt.2
03/03/2008Correspondence concerning Rockies Express Pipeline filed by V. and M. Stillion. (Ohio)6
03/03/2008Correspondence concerning Rockies Express Pipeline filed by C. McCloskey on behalf of the Scothorns. (Ohio)3
02/29/2008Correspondence concerning Rockies Express Pipeline filed by D. Parish.1
02/29/2008Correspondence concerning Rockies Express Pipeline C. Rowe. (Ohio)2
02/29/2008Correspondence concerning Rockies Express Pipeline filed by L. Turner.3
02/29/2008Correspondence concerning Rockies Express Pipeline. filed by C. Rowe. (Ohio)1
02/29/2008Correspondence concerning Rockies Express Pipeline filed by J. Smith. (Ohio)2
02/29/2008Correspondence concerning Rockies Express Pipeline filed by J. Rust.2
02/29/2008Correspondence concerning Rockies Express Pipeline filed by J. Smith. (Ohio)2
02/29/2008Correspondence concerning Rockies Express Pipeline filed by R. Clark.4
02/29/2008Correspondence concerning Rockies Express Pipeline filed by J. Smith. (Ohio)2
02/29/2008Correspondence concerning Rockies Express Pipeline filed by C. Rowe. (Ohio)3
02/29/2008Correspondence concerning Rockies Express Pipeline by J. Smith. (Ohio)2
02/29/2008Correspondence in reply concerning Rockies Express Pipeline filed by L. Turner.3
02/29/2008Correspondence concerning Rockies Express Pipeline filed by D. Plumby. (Ohio)3
02/29/2008Correspondence concerning Rockies Express Pipeline filed by L. O'Donnell.2
02/29/2008Correspondence concerning Rockies Express Pipeline filed by C. Rowe. (Ohio)2
02/29/2008Correspondence requesting response from Rockies Express Pipeline Filed by J. Donaho.3
02/29/2008Correspondence concerning Rockies Express Pipeline filed by S. Howe.1
02/22/2008Correspondence opposing the REX Pipeline East project filed by M. Detcher. 16
02/22/2008Correspondence regarding the locations that pipe are being stored off right-of-way, filed by J. C. Moffatt on behalf of Rockies Express Pipeline, LLC. 4
02/22/2008Correspondence regarding concern over the REX Pipeline East project filed by J. Smith, PhD. 2
02/22/2008Correspondence opposing the REX East Pipeline Project filed by H. Profitt. 2
02/22/2008Correspondence regarding epoxy glue used by Rockies Express Pipeline East filed by J. Smith PhD. 2
02/22/2008Correspondence concerning the Rockies Express Pipeline, LLC project filed by concern citizen.1
02/21/2008Correspondence regarding concern over cultural issues for the Rockies Express Pipeline LLC, project filed by J. Curtis-Moffatt. 13
02/21/2008Correspondence regarding concern over the Rockies Express Pipeline LLC, project filed by J. Curtis Moffatt. 2
02/21/2008Correspondence regarding the legal representation of Carl and Wilma Messerly in response to the Rockies Express East Project filed by S. Davis. 2
02/21/2008Correspondence regarding concern over the Federal Goverrment's guaranteed funding in loans for the Rockies Pipeline East Project filed by J. Smith. 2
02/21/2008Correspondence regarding concern over the risk to Little Miami Wild and Scenic River and Ceasar's Creek State Park and Wildlife Preserve filed by C. Rowe. 5
02/21/2008Correspondence regarding concern over the pipeline project proposed by the Rockies Express Pipeline LLC filed by W. Phillips. 3
02/21/2008Letter expressing concern over toxic material in the pipeline filed by J. Smith, PhD. 2
02/21/2008Correspondence regarding notification to the Commission of the illegal activities of Rockies Express LLC in Greensburg (Decator County), Indiana filed by J. Rust.6
02/21/2008Comments regarding the Rockies Express Pipeline LLC to modify the implementation of the procedure regarding cultural sites filed by D. Mowrey.5
02/21/2008Correspondence supporting the Rockies Express East Pipeline proposed alignment in Macon County filed by Stephen Bean, Clerk for the County of Macon, State of Illinois and R. Sampson, Chairman, Macon County Board.7
02/21/2008Correspondence regarding Alaska's progress in fifth pipeline report to Congress filed by Federal Energy Regulatory Commission. 1
02/21/2008Letter in response to Rockies Express Pipeline LLC request to eliminate the construction exclusion zones filed by N. Mowrey.3
02/21/2008Correspondence regarding request for technical conference J. Moffatt on behalf of Rockies Express Pipeline LLC. 5
02/21/2008Correspondence letter regarding the REX-East Pipeline Project filed by A., J. Stirn. 7
02/21/2008Correspondence letter regarding the REX-East Pipeline Project filed by C. Rowe. (Ohio)4
02/21/2008Correspondence letter regarding the REX-East Pipeline Project filed by R. Clark.3
02/21/2008Correspondence letter regarding the REX-East Pipeline Project filed on behalf of the Jacobs Family Farms by C. Schimke. 3
02/21/2008Correspondence letter regarding the REX-East Pipeline Project filed by R. and S. Amburgey. (Ohio)2
02/21/2008Supplemental information to the pipe yard data that was submitted to the FERC on February 20, 2007, filed on behalf of the Rockies Express Pipeline LLC by C. Moffatt. 4
02/15/2008Correspondence letter responding to FERC Staff's February 8, 2008 request for data, filed on behalf of Rockies Express Pipeline LLC by J. Moffatt. 2
02/15/2008Correspondence letter regarding the REX-East Pipeline Project filed by B. Chase. (Ohio)2
02/15/2008Supplemental information to the application filed April 30, 2007 with the FERC regarding the REX-East Project, filed on behalf of the Rockies Express Pipeline LLC by J. Moffatt. 11
02/15/2008Correspondence letter regarding the REX-East Pipeline Project filed by S. Marmie. (Ohio)32
02/15/2008Correspondence letter regarding data for co-location of pipeline with panhandle filed on behalf or the Rockies Express Pipeline LLC by J. Moffatt. 4
02/15/2008Correspondence letter regarding the REX-East Pipeline Project filed by J. Kelliher. 1
02/15/2008Correspondence letter regarding the REX-East Pipeline Project filed by A. C. C. Z, L, and J. Stirn. 4
02/15/2008Correspondence letter regarding the REX-East Pipeline Project filed by V. Stillion. (Ohio)6
02/15/2008Correspondence letter regarding the REX-East Pipeline Project filed by J. Smith. (Ohio)2
02/15/2008Response to the Department of Interior and supplemental information for the Big Darby Creek and the Little Miami River filed by J. Moffatt. (Ohio)9
02/15/2008Environmental data request for the Rockies Express East Project filed by A. Lykens. 8
02/15/2008Supplemental information for crossing of the Big Walnut Creek by means of horizontal directional drill filed by J. Moffatt. 11
02/15/2008Correspondence letter regarding the REX-East Pipeline Project filed by S. and R. Davidson. 2
02/15/2008Correspondence letter regarding the REX-East Pipeline Project filed by J. Smith. (Ohio)2
02/15/2008Correspondence letter regarding the REX-East Pipeline Project filed by W. and M. Knau. (Ohio)1
02/15/2008Correspondence letter regarding the Rockies Express, LLC East Project filed by J. Rust. 3
02/12/2008Correspondence letter stating that a technical conference will be held on Monday, January 28, 2008 to discuss the Biological Assessment and agreements required under the Migratory Bird Treaty Act. 2
02/12/2008Correspondence letter regarding the REX East Project filed by L. and D. Chastain. 6
02/12/2008Correspondence letter regarding the REX East Project filed by Senator R. Lugar. 14
02/12/2008Correspondence letter regarding the REX East Project filed by C. Rowe. (Ohio)2
02/12/2008Correspondence letter regarding the REX East Project filed by S. Howe. 3
02/12/2008Notice of amendment to the application filed by Rockies Express Pipeline LLC on January 25, 2008 in Docket No. CP07-208-001 filed by K. Bose. 2
02/12/2008Correspondence letter regarding the REX East Project filed filed on behalf of the Indiana Department of Natural Resources by J. Glass. 2
02/12/2008Correspondence letter regarding the REX Pipeline East Project filed by J. Smith. (Ohio)2
02/12/2008Notice that the staff of the Office of Energy Projects will hold a technical conference for the REX East Project on February 20, 2008, at 1:00 pm (EST), in Room 3M-2B at the Commission Headquarters, 888 First Street NE, Washington D.C. filed by K. Bose. 1
02/12/2008Correspondence letter regarding the REX East Project filed by Congressman Z. Space. (Ohio)1
02/12/2008Correspondence letter regarding the REX East Project filed on behalf of the Ohio Department of Natural Resources by S. Logan. (Ohio)1
02/12/2008Correspondence letter regarding the REX East Project filed by S. Lehman. (Ohio)1
02/12/2008Correspondence letter regarding the Rockies Express Project-Eastern Phase filed by B. and R. Lecher. 1
02/07/2008Letter expressing concern over the Rockies Express Pipeline LLC. project.1
02/04/2008Revised draft Biological Assessment filed on behalf of Rockies Express Pipeline Company LLC by J. Moffatt. 67
02/04/2008Correspondence letter regarding the Rockies Express Pipeline project filed by T. Johnson. 4
02/04/2008Correspondence letter regarding the REX East pipeline project filed by J. and C. Rowe.(Ohio consumer)4
02/04/2008Correspondence stating the FERC accepted the Midwest ISO-PJM transmission pricing plan and rejected AEP’s challenge. 2
02/04/2008Correspondence letter regarding the deadline for commenting on the draft EIS for the Rockies Express Pipeline LLC-REX East Project filed by J. Witt. (Ohio)1
01/31/2008Correspondence from S. Howe regarding the Rockies Express Pipeline. 2
01/31/2008Correspondence from M. Reed regarding the REX East Project.5
01/31/2008Response of Rockies Express Pipeline LLC filed by Rockford G. Meyer.5
01/31/2008Correspondence from M. Fellerhoff regarding the REX East Project.4
01/31/2008Correspondence from P. Hunkler regarding the REX East Project.1
01/31/2008Correspondence from L. Graham regarding the REX East Project.8
01/31/2008Correspondence from R. Kremer regarding the REX East Project.24
01/31/2008Correspondence from Andy, Connie, Clay, Zach, Luke and Jack Stirn regarding the REX East Project.5
01/29/2008Correspondence from S. Howe in regard to the Rockies Express Pipeline.12
01/29/2008Correspondence from J. Smith, PhD in regard to the REX Pipeline.2
01/29/2008Correspondence from Shane & Natasha White regarding the Rockies Express Pipeline.2
01/29/2008Correspondence from J. Forman regarding the Rockies Express Pipeline. 9
01/29/2008Correspondence from Andy, Connie, Clay, Zach, Luke and Jack Stim regarding the REX East Project.5
01/29/2008Correspondence from Gary W. Moody regarding the REX East Project.7
01/29/2008Notice of technical conference from K. Bose concerning issues raised by the U.S. Fish and Wildlife Service for the REX East Project.1
01/29/2008Correspondence from Roger and Nancy Holland regarding the Rockies Express Project.2
01/29/2008Correspondence concerning Rockies Express proposed project filed by concerned homeowner, D.L. Robinson.2
01/29/2008Correspondence concerning Rockies Express proposed project filed by concerned homeowner, J. Plumly.2
01/29/2008Correspondence from K. Smith regarding the Rockies Express Project.2
01/29/2008Correspondence concerning Rockies Express proposed project filed by concerned homeowner, R. Kemp.2
01/29/2008Correspondence concerning Rockies Express proposed project filed by concerned homeowner, J. Barnett.2
01/29/2008Correspondence concerning Rockies Express proposed project filed by concerned homeowner, N. Schaljo.2
01/29/2008Correspondence concerning Rockies Express proposed project filed by concerned homeowners, C. Storck-Stump, Ted and Sarah Storck.6
01/29/2008Correspondence concerning Rockies Express proposed project filed by Pike Grain Company. 1
01/29/2008Correspondence concerning Rockies Express proposed project filed by concerned homeowner, B. Chase. 7
01/29/2008Correspondence concerning Rockies Express proposed project filed by concerned homeowner, C. Rowe.3
01/29/2008Correspondence concerning Rockies Express proposed project filed by concerned homeowner, C. Rowe. 3
01/29/2008Correspondence concerning Rockies Express proposed project filed by K. Westlake.12
01/29/2008Correspondence concerning Rockies Express proposed project filed by R. Clark.5
01/29/2008Correspondence concerning Rockies Express proposed project filed by concerned homeowner, G. Archambault. 5
01/29/2008Correspondence concerning Rockies Express proposed project filed by concerned homeowner, M. Gladden.1
01/29/2008Correspondence concerning Rockies Express proposed project filed by concerned homeowner, D. Smith. 2
01/29/2008Correspondence concerning Rockies Express proposed project filed by J. Smith.2
01/29/2008Correspondence concerning Rockies Express proposed project filed by concerned homeowner, H. Stegmiller.2
01/29/2008Correspondence concerning Rockies Express proposed project filed by concerned homeowner, C. Rowe.7
01/29/2008Correspondence concerning Rockies Express proposed project filed by concerned homeowners J. & K. Costello.3
01/29/2008Correspondence concerning Rockies Express proposed project filed by concerned homeowners L. & B. Billings3
01/24/2008Correspondence regarding the Rockies Express Project from A. Stirn.6
01/24/2008Correspondence from C. Costello regarding the Rockies Express Project.8
01/24/2008Correspondence from Richard and Sandy Petty regarding the Rockies Express Project.4
01/24/2008Motion to intervene out-of-time of the Central Illinois Pipeline Association filed by K. Zachers.6
01/24/2008Correspondence from R. Rowe regarding the Rockies Express Project.3
01/22/2008Correspondence from Pike Grain Company regarding the Rockies Express Project.1
01/22/2008Correspondence from J. Robinson regarding the Rockies Express Project.3
01/22/2008Correspondence from Michael and Barbara Robertson regarding the Rockies Express Project.3
01/22/2008Correspondence from Stephen and Karen Brown regarding the Rockies Express Project.1
01/22/2008Correspondence from D. Smith regarding the Rockies Express Project.2
01/22/2008Public comment meeting held at Presser Hall, Mexico, MO on January 7, 2008. 3
01/22/2008Correspondence from B. Chase regarding the Rockies Express Project.7
01/22/2008Notice of technical conference to be held on Monday, January 28, 2008 at 1:30 p.m. (EST) in Room 3M-2B at the Commission Headquarters in Washington D.C. for the REX East Project.1
01/22/2008Correspondence from Charlene Storck-Stump, Ted and Sarah Storck regarding the Rockies Express Project.6
01/22/2008Correspondence from W. and O. Paulsen regarding the Rockies Express Project.1
01/22/2008Correspondence from R. Fuller regarding the Rockies Express Project.4
01/22/2008Correspondence from Lawrence and Shirley Khune regarding the Rockies Express Project.2
01/22/2008Correspondence from G. Moody regarding the Rockies Express Project.7
01/22/2008Correspondence from John and Catherine Rowe regarding the Rockies Express Project.5
01/22/2008Correspondence from V. and M. Stillion regarding the Rockies Express Project.2
01/22/2008Correspondence from H. Stegemiller regarding the Rockies Express Project.2
01/22/2008Correspondence from M. Yane regarding the Rockies Express Project.1
01/22/2008Comments of Elrod Water Company Inc. dba Hoosier Hills Reginal Water District opposing the location of the Rockies Express Pipeline filed by P. King.16
01/22/2008Correspondence from M. Hartley regarding the Rockies Express Project.6
01/22/2008Correspondence from M. Hartley regarding the Rockies Express Project.1
01/18/2008Correspondence concerning the Rockies Express Pipeline project filed by E. Johnson.1
01/18/2008Comments on the Draft Environmental Impact Statement filed on behalf of Rockies Express Pipeline.1
01/18/2008Post meeting comments regarding the REX Project filed by J. and C. Rowe.4
01/18/2008Protest and objections to the Draft Environmental Impact Statement filed by K. Zacheis on behalf of Central Illinois Pipeline Association.4
01/18/2008Environmental data request for the Rockies Express-East Project filed by L. Turner on behalf of FERC.2
01/18/2008Correspondence from V. Stillion regarding the Rockies Express Project.3
01/18/2008Report of site visits on January 8-9, 2008 of FERC staff.5
01/18/2008Letter requesting comments on or before February 19, 2008 filed by A. Lykens, FERC.4
01/18/2008Public comment meeting held at Pittsfield High School, Pittsfield, Illinois on January 8, 2008.19
01/18/2008Public comment meeting held at Lanphier High School, Springfield, Illinois on January 7, 2008.24
01/18/2008Public comment meeting held at Greenwood Community High School, Greenwood, Indiana on January 9, 2008.96
01/18/2008Public comment meeting held at Greensburg High School, Greensburg, Indiana on January 8, 2008.101
01/18/2008New map for comments to Draft Environmental Impact Statement of John Forman filed by M. Fellerhoff. 5
01/18/2008Public comment meeting held at Edgwood High School, Trenton, Ohio on January 9, 2008.142
01/18/2008Public comment meeting held at Teays Valley High School, Ashville, Ohio on January 8, 2008.47
01/15/2008Comment on REX-East draft filed by J. Suhre.5
01/15/2008Correspondence concerning Rockies Express Pipeline Project additional information.1
01/15/2008Correspondence concerning Rockies Express Pipeline Project filed by S. Pepin.4
01/15/2008Correspondence concerning Rockies Express Pipeline Project filed by M. Langston.4
01/15/2008Motion to intervene out of time of Richard and Sandy Petty filed by C. McCloskey.4
01/15/2008Correspondence concerning Rockies Express Pipeline Project filed by R. and S. Petty.3
01/15/2008Correspondence concerning Rockies Express Pipeline Project filed by F. Gilzow.5
01/15/2008Correspondence concerning Rockies Express Pipeline Project filed by K. Smith.3
01/15/2008Correspondence concerning Rockies Express Pipeline Project filed by J. Smith.2
01/15/2008Correspondence concerning Rockies Express Pipeline Project additional data.1
01/15/2008Correspondence concerning Rockies Express Pipeline Project filed by D.,K.,D. and S. Forni.4
01/15/2008Correspondence concerning Rockies Express Pipeline Project filed by R. Clark.6
01/15/2008Correspondence concerning Rockies Express Pipeline Project filed by D. and E. Anderson.3
01/15/2008Correspondence concerning Rockies Express Pipeline Project filed by T. Hougham.5
01/15/2008Correspondence concerning Rockies Express Pipeline Project filed by G. Moody.9
01/15/2008Correspondence concerning Rockies Express Pipeline Project filed by D. Arnold.5
01/15/2008Correspondence concerning Rockies Express Pipeline Project filed by M. Cochran and M. Barton.4
01/15/2008Correspondence concerning Rockies Express Pipeline Project filed by J. Smith.2
01/15/2008Correspondence concerning Rockies Express Pipeline Project filed by J. Glass.2
01/15/2008duplicate. delete5
01/15/2008Motion to intervene out-of-time of Central Illinois Pipeline Association filed by J. Robinson, and K. Zacheis.6
01/15/2008Correspondence concerning Rockies Express Pipeline Project filed by G. and M. Burton.2
01/15/2008Correspondence concerning Rockies Express Pipeline Project filed by B. Lecher.6
01/15/2008Correspondence concerning Rockies Express Pipeline Project filed by N. Mowrey.4
01/15/2008Correspondence concerning Rockies Express Pipeline Project filed by M. Buffington.5
01/15/2008Correspondence concerning Rockies Express Pipeline Project filed by M. Fellerhon.10
01/15/2008Correspondence concerning Rockies Express Pipeline Project.1
01/15/2008Correspondence concerning Rockies Express Pipeline Project filed by D. Brown.7
01/15/2008Correspondence concerning Rockies Express Pipeline Project filed by Charlene, Ted and Sarah Storck.4
01/15/2008Correspondence concerning Rockies Express Pipeline Project filed by The Stim Family.6
01/15/2008Correspondence concerning Rockies Express Pipeline Project filed by M. Chezik.18
01/15/2008Correspondence regarding the Rockies Express Pipeline, LLC East project filed by D. Tutas.2
01/15/2008Correspondence regarding the Rockies Express Pipeline, LLC project filed by G. Dole.3
01/15/2008Correspondence regarding the Rockies Express (REX) Pipeline, LLC project, Hoosier Hills Regional Water District Exhibit 2 is attached, filed by C. King.17
01/15/2008Comments submitted on behalf of the Ohio Power Siting Board by W. Wright.88
01/15/2008Document information Natural Resource Group's Additional Phase I Archaeological Survey for June - October 2007, for Rockies Express Pipeline-East Project - Spread 4 (MP 238.2MP 301.1) including the Wabash Reroute etc, CP07-208. Part 8, filed by J. Milner 1
01/14/2008Correspondence filed on behalf of FERC regarding the Rockies Express Pipeline LLC project filed by P. King.4
01/14/2008Correspondence letter regarding the REX-East project filed by J. Smith.2
01/14/2008Correspondence regarding the Rockies Express Pipeline LLC, REX-East project filed by R. Hutchison.2
01/14/2008Correspondence regarding Rockies Express Pipleline LLC, filing information to supplement its application related to cultural resources filed by J. Moffatt.15
01/14/2008Correspondence regarding Rockies Express Pipeline LLC, East project filed by L. Harmon on behalf of Illinois Farm Bureau..3
01/14/2008Correspondence letter serve as follow up to a meeting held January 9, 2008, for the purpose of FERC receiving comments regarding the published DEIS for the REX LLC, East project filed by N. Mowrey.2
01/14/2008Response letter regarding Rockies Express Pipeline LLC, East project filed by N. Mowrey.2
01/14/2008Correspondence regarding Rockies Express Pipeline LLC, East project filed by Michele and Marvin Steed.5
01/11/2008Correspondence for the proposed Rockies Express Pipeline East project on behalf of Natural Resource Group.1
01/10/2008Correspondence concerning REX Pipeline filed by David and Ronald Kile.2
01/10/2008Correspondence concerning REX Pipeline filed by J. Smith.1
01/10/2008Correspondence concerning REX Pipeline filed by Jeff and Maureen McCarty.2
01/10/2008Correspondence concerning REX Pipeline filed on behalf of "eog resources" by M. Eschenburg.2
01/10/2008Correspondence concerning REX Pipeline filed by B. Wade.1
01/10/2008Correspondence concerning REX Pipeline East filed by J. Smith.1
01/10/2008Correspondence concerning REX Pipeline East filed by J. Smith.2
01/10/2008Correspondence concerning REX Pipeline East filed by concerned consumer Mary Detcher.2
01/10/2008Correspondence concerning REX Pipeline filed by D. Robinson.1
01/10/2008Correspondence concerning REX Pipeline filed by B. Bird and R. Sampson.7
01/10/2008Correspondence concerning REX Pipeline East filed by J. Smith.2
01/10/2008Correspondence regarding technical conference held by the Commission to hear the concerns of the Rockies Express Pipeline and the Panhandle Pipe Line Company, filed by L. Turner.13
01/10/2008Correspondence regarding filing preliminary responses to Certificate Conditions 24-39 of the Rockies Express Pipeline-East LLC, project filed by J. Moffatt.66
01/10/2008Correspondence regarding the Rockies Express Pipeline East project filed by R. Lugar.14
01/10/2008Correspondence regarding the Rockies Express Pipeline East project filed by J. Schneider.3
01/10/2008Correspondence regarding the Rockies Express Pipeline East project filed by J. Smith.1
01/10/2008Correspondence regarding the Rockies Express Pipeline East project filed by J. Smith.2
01/10/2008Correspondence regarding the Rockies Express Pipeline project filed by J. Schneider.2
01/10/2008Correspondence regarding the Rockies Express Pipeline East project filed by J. Smith.2
01/10/2008Supplemental information filed with FCC, on behalf of Rockies Express Pipeline LLC, REX-East project filed by S. Howe.12
01/10/2008Correspondence regarding the Rockies Express Pipeline project filed by N. Long.2
01/09/2008Executive Summary for the Environmental Impact Statement, (EIS), filed on behalf of FERC. 8
01/09/2008Introduction, (1.0), to the draft Environmental Impact Statement for the REX East Project filed on behalf of FERC.15
01/09/2008Description of the proposed action, (2.0), regarding the REX East Project filed on behalf of FERC.28
01/09/2008Conclusions and recommendations, (5.0), regarding the REX East Project filed on behalf of FERC.34
01/09/2008Letter filed by K. Bose on behalf of FERC.4
01/09/2008Draft EIS for the REX East Project, filed on behalf of FERC.13
01/09/2008Alternatives (3.0) to the proposed action in the REX East Project filed on behalf of FERC.50
12/28/2007Letter regarding the status of negotiations between REX and ODNR filed by S. Logan.2
12/28/2007Letter regarding REX Pipeline Project filed by D. Parker.1
12/28/2007Letter regarding approval of Rockies Express Pipeline Project filed by H. Detling.1
12/28/2007Correspondence notice issued by (FERC) regarding the availability of the draft Environmental Impact Statement for the Rockies Express Pipeline, LLC Project.4
12/21/2007Correspondence regarding licensing for the Makah Bay Offshore Wave Pilot Project filed by and on behalf of FERC. 2
12/21/2007Natural Resource Group's Phase I Archaeological Survey for the proposed Rockies Express East Pipeline Project. 2
12/21/2007Natural Resource Group's summary of test excavations to evaluate mound 5. 1
12/21/2007Natural Resource Group Inc's Phase II Archaeological Site Assessments in Northern Missouri segment of the proposed Rockies Express Pipeline East Project. 1
12/21/2007Natural Resources Group Inc's Phase I Archaeological Survey for the proposed Rockies Express East Pipeline Project. 1
12/21/2007Natural Resource Group submits Phase I Archaeological Survey for the proposed Rockies Express East Pipeline Project. 1
12/21/2007Letter stating ( FERC ) today granted Xcel Energy Services, Inc. request for incentive transmission rates as part of its plan for sic transmission upgrades to meet state renewable energy generation standards and serve increased power demand in the Upper Midwest. 2
12/21/2007Letter stating ( FERC ) today acted to expand the due process protections of subjects of investigations in civil penalty cases under the Federal Power Act. 1
12/21/2007Letter stating that ( FERC ) today largely affirmed its rule on open access transmission order No. 890 issued earlier this year. 2
12/21/2007Letter stating ( FERC ) today approved a final rule and proposed a new rule to increase transparency in the wholesale markets for physical natural gas. 2
12/21/2007Letter stating that the Makah Bay pilot project is both symbolic and substantive. 1
12/21/2007Letter stating that the funds from the REX Pipeline Project will help the Barnesville Schools filed by J. Smith, PhD. 2
12/21/2007Letter stating the ( FERC ) today approved three reliability standards to further ensure the reliability of the nation's bulk power electricity market. 1
12/21/2007Request for revised biological assessment filed by L. Turner on behalf of FERC.2
12/18/2007Letter expressing concerns over property rights due to the REX project filed by M. Bartley1
12/18/2007Notice stating a special Township meeting with the Rockies Express Pipeline Partnership on December 18, 2007 the public is invited. 2
12/18/2007Letter notifying that the reference project is located outside of the area of concern filed by G. Thompson on behalf of Seneca Nation Tribal Historic Preservation. 1
12/18/2007Notice of technical conference to be held of December 19, 2007, at 10:00 a.m. in room 3M-3 at the Commission Headquarters in Washington, D.C. filed by K. Bose. 1
12/18/2007 News release of FERC authorizing guardian pipeline expansion, (Wisconsin, Illinois)1
12/18/2007Letter in agreement with the Commission recommended route variation filed by Nancy & Dean Mowrey.1
12/18/2007FERC news release commending all parties involved in the hydroelectric licensing project. 1
12/18/2007Letter stating no objection to the proposed construction project filed by J. Froman, Chief on behalf of Peoria Tribe of Indians of Oklahoma. 1
12/18/2007Request for technical conference filed by J. Moffatt on behalf of Rockies Express Pipeline LLC4
12/18/2007Teleconference to discuss agency concerns with Rockies Express Pipeline - East project. 2
12/18/2007Record of communication between third party consultants and outside parties filed by Rockies Express East EIS. 29
12/07/2007Correspondence letter regarding the Rockies Express Pipeline LLC East Project cultural resource information filed by S. Howe.24
12/07/2007Correspondence regarding final report on 1st mobilization of phase 1 surveys for Rockies Express Pipeline East Project (REX-East) in Ohio filed by K. Krause.2
12/07/2007Correspondence regarding the Rockies Express Pipeline LLC East project filed by W. and M. Knau. 13
12/07/2007Rockies Express Pipeline LLC, REX-East project response to November 27, 2007 data request filed by J. Moffat.34
12/07/2007Correspondence regarding the Rockies Express Pipeline LLC East project filed by J. Kelliher.8
12/07/2007Correspondence regarding the Rockies Express Pipeline LLC East project filed by D. Shaffer.3
12/07/2007Correspondence regarding the Rockies Express Pipeline LLC East project filed by J. Smith.2
12/07/2007Correspondence regarding the Rockies Express Pipeline LLC East project filed by R. Hutchison.5
12/07/2007Correspondence regarding the Rockies Express Pipeline East project filed by D. and R. Kile. 7
12/07/2007Motion to intervene out of time and comments and requests of Tom and Linda Scothorn filed by C. McCloskey.8
12/07/2007Correspondence regarding the Rockies Express East Pipeline project filed by D. Kile and R. Kile.1
12/07/2007FERC fact sheet from November 30, 2007 regarding Amaranth Advisors, LLC. et al.1
12/07/2007Correspondence letter regarding the Rockies Express Pipeline project filed by E. and S. Maus.1
11/28/2007Correspondence regarding Rockies Express Pipeline Project-East filed by J. Kelliher.2
11/28/2007Correspondence regarding Rockies Express Pipeline-East filed by M. and W. Knau.4
11/28/2007Correspondence regarding environmental data request for the Rockies Express-East Project (Docket No. CP07-208-000) filed by L. Turner.2
11/26/2007Notice of availability of the draft environmental impact statement for the proposed REX East Project.4
11/26/2007Correspondence regarding public meeting being held December 18, 2007, at the Somerton Firehouse, 6:30 p.m., between REX Pipeline and the people of Somerset Township filed by J. Smith.2
11/26/2007Environmental analysis report filed on behalf of and by of Rockies Express. (Part 1 of 2)200
11/26/2007Report continued. (Part 2 of 2)42
11/16/2007Correspondence regarding Rockies Express Pipeline -East filed by R. Lugar.3
11/16/2007Correspondence regarding Rockies Express Pipeline-East filed by S. Rust.8
11/16/2007Correspondence of the people of Somerset Township filed by J. Smith.2
11/16/2007Correspondence letter in regards to the Rockies Express-East Pipeline Project filed by M. and L. Butler.1
11/16/2007Letter responding to October 24, 2007 FERC data requests filed by S. Howe on behalf of Rockies Express Pipeline.14
11/09/2007Response to data request filed by J. Moffatt on behalf of Rockies Express Pipeline, LLC.3
11/08/2007Correspondence regarding the Rockies Express Pipeline case filed by J.Smith.2
11/08/2007Correspondence regarding the Rockies Express Pipeline case filed by R. Hutchison.2
11/08/2007Correspondence regarding landowner supplemental information to the data request, filed by J. Moffatt on behalf of Rockies Express Pipeline, LLC.4
11/08/2007Correspondence regarding correction of the location of Raven Rock County from Belmont to Monroe filed by J. Smith.2
11/08/2007Response to data requests filed by J. Moffatt on behalf of Rockies Express Pipeline, LLC.23
11/06/2007Correspondence regarding the Rockies Express Pipeline case filed by R. Hutchison, M.S., M.Ed.2
11/06/2007Correspondence regarding the Rockies Express Pipeline case filed by L. Turner.3
11/06/2007Correspondence regarding the Rockies Express Pipeline case filed by J. Smith, PhD.2
11/06/2007Correspondence regarding the Rockies Express Pipeline case filed by J. Smith, PhD.2
11/06/2007Correspondence regarding the Rockies Express Pipeline case filed by J. Smith.2
11/01/2007Correspondence regarding the Rockies Express Pipeline case from REX East Project Filing-upland construction plan filing of 7/06/07.15
11/01/2007Correspondence regarding the Rockies Express Pipeline case from REX East Project Filing-upland construction plan filing of 4/30/07.16
11/01/2007Correspondence regarding the Rockies Express Pipeline case from REX East Project-dredge plan filing of 5/18/07.8
11/01/2007Correspondence regarding the Rockies Express Pipeline case from REX East Project-weed management plan filing of 7/9/07.9
11/01/2007Correspondence regarding the Rockies Express Pipeline case from REX East Project-wetland and waterbody filing of 4/30/07.20
11/01/2007Correspondence regarding the Rockies Express Pipeline case from REX East Project-road and railroad crossings filing of 10/9/07.36
11/01/2007Correspondence regarding the Rockies Express Pipeline case from REX East Project-spill prevention filing of 4/30/07.17
11/01/2007Correspondence regarding the Rockies Express Pipeline LLC case filed by REX East.108
11/01/2007Correspondence regarding the Rockies Express Pipeline LLC case filed by Natural Resource Group Inc.12
11/01/2007Correspondence regarding the Rockies Express Pipeline case from REX East Project Filing of 4/30/07.13
11/01/2007Correspondence regarding the Rockies Express Pipeline case filed by K. Krause.37
11/01/2007Correspondence regarding the Rockies Express Pipeline case filed by L. Turner.3
11/01/2007Correspondence regarding the Rockies Express Pipeline case filed by E. and K. Issacs.3
11/01/2007Correspondence regarding the Rockies Express Pipeline case filed by R. Kemp.1
11/01/2007Correspondence regarding the Rockies Express Pipeline case ( FERC news article).2
10/30/2007Correspondence regarding the Rockies Express Pipeline LLC case filed by S. Jones.3
10/30/2007Correspondence regarding the Rockies Express Pipeline LLC case filed by J. Curtis Moffatt.57
10/30/2007Correspondence regarding the Rockies Express Pipeline LLC case filed by J. Curtis Moffatt.54
10/30/2007Correspondence regarding revisions to the application in the Rockies Express Pipeline LLC case filed by J. Curtiss Moffatt.77
10/30/2007Correspondence regarding the modified Agricultural Impact Mitigation Plans pursuant to the Rockies Express Pipeline LLC case, filed by J. Curtiss Moffatt.54
10/30/2007Correspondence regarding the Rockies Express Pipeline LLC case filed by S. Howe.2
10/30/2007Correspondence regarding the Rockies Express Pipeline LLC case filed by S. Howe.2
10/30/2007Correspondence regarding the Rockies Express Pipeline LLC case filed by James A. Glass.4
10/30/2007Correspondence regarding the Rockies Express Pipeline LLC case filed by K. J. Neises.8
10/30/2007Correspondence regarding Rockies Express Pipeline LLC case filed by K. J. Neises.7
10/30/2007Response letter to Ms. Bose regarding Rockies Express Pipeline LLC, filed by J. Curtis Moffett.2
10/30/2007Response letter to Mr. Hoffman regarding Rockies Express Pipeline LLC, filed by J. S. Jones.3
10/30/2007Response letter to K. Bose regarding Rockies Express Pipeline LLC, filed by J. Curtis Moffatt.2
10/30/2007Letter regarding Rockies Express Pipeline, LLC, filed by Susan A. Rust.8
10/30/2007Letter regarding Rockies Express Pipeline, LLC, filed by Nancy R. Mowrey.2
10/30/2007Letter regarding Rockies Express Pipeline, LLC, filed by Susan A. Rust.8
10/30/2007Letter regarding Rockies Express Pipeline, LLC, filed by James S. Parks.3
10/30/2007Letter regarding Rockies Express Pipeline, LLC, filed by D. Mowrey.2
10/26/2007Letter regarding Rockies Express Pipeline filed by R. Naber.5
10/26/2007Letter regarding Rockies Express Pipeline LLC, filed by S. Howe.2
10/26/2007Correspondence concerning Rockies Express Pipeline, LLC to K. Bose from S. Howe.14
10/24/2007Correspondence regarding Rockies Express Pipeline filed by L. Turner.2
10/24/2007Correspondence regarding Rockies Express Pipeline filed by J. Moffatt.101
10/22/2007Correspondence regarding Rockies Express Pipeline filed by J. Smith.2
10/22/2007Correspondence regarding Rockies Express Pipeline filed by J. Smith.2
10/19/2007Letter regarding the Rockies Express Pipeline filed by H. Floyd Gilzow.2
10/19/2007Letter regarding the Rockies Express Pipeline filed by L. Turner.3
10/19/2007Letter regarding the Rockies Express Pipeline filed by D. Shaffer (Steele).5
10/19/2007Letter regarding the Rockies Express Pipeline filed by N. Mowrey.2
10/19/2007Letter regarding the Rockies Express Pipeline filed by N. Mowrey.1
10/19/2007Letter regarding the Rockies Express Pipeline Project filed by N. Mowrey.2
10/19/2007Letter regarding the Rockies Express Pipeline Project, filed by H. Floyd Gilzow on behalf of the Missouri Department of Natural Resources.3
10/17/2007Correspondence regarding Rockies Express Pipeline.3
09/28/2007Meeting minutes regarding Rockies Express Pipeline LLC.2
09/27/2007Comments on Rockies East Project filed by Harry and Barbara Schulte5
09/27/2007Correspondence regarding Rockies Express Pipeline filed by C. Moffatt.5
09/27/2007Teleconference to discuss agency concerns with Rockies Express Pipeline.3
09/27/2007Correspondence regarding Rockies Express Pipeline filed by C. Moffatt.2
09/27/2007Correspondence regarding Rockies Express Pipeline.4
09/27/2007Correspondence regarding Rockies Express Pipeline.2
09/27/2007Correspondence regarding Rockies Express Pipeline filed by David and Ronald Kile. 3
09/27/2007Correspondence regarding Rockies Express Pipeline.2
09/27/2007Correspondence regarding Rockies Express Pipeline.2
09/27/2007Correspondence regarding Rockies Express Pipeline filed by K. Mason.3
09/27/2007Correspondence regarding Rockies Express Pipeline filed by N. Mowrey.2
09/27/2007Correspondence continued. (Part 2 of 2)104
09/27/2007Correspondence regarding Rockies Express Pipeline filed by J. Moffatt. (Part 1 of 2)200
09/27/2007Response of Rockies Express Pipeline, LLC filed by R. Harrington.16
09/27/2007Correspondence regarding Rockies Express Pipeline filed by M. Detcher.10
09/27/2007Correspondence regarding Rockies Express Pipeline filed by J. Jackson.2
09/27/2007Correspondence regarding Rockies Express Pipeline filed by R. Hoffmann.2
09/27/2007Correspondence regarding Rockies Express Pipeline filed by R. Hoffmann.2
09/27/2007Correspondence regarding Rockies Express Pipeline filed by N. Campbell.1
09/27/2007Correspondence regarding Rockies Express Pipeline filed by H. Stahl.1
09/27/2007Correspondence regarding Rockies Express Pipeline.1
09/27/2007Correspondence regarding Rockies Express Pipeline filed by Mrs. Tysinger.4
09/27/2007Correspondence regarding Rockies Express Pipeline.1
09/27/2007Correspondence regarding Rockies Express Pipeline filed by K. Bose.1
09/25/2007Correspondence regarding Rockies Express Pipeline D. Parker.1
09/25/2007Correspondence regarding Rockies Express Pipeline.1
09/25/2007Correspondence regarding Rockies Express Pipeline filed by D. Von Meulen.1
09/25/2007Correspondence regarding Rockies Express Pipeline filed by S. Rust.4
09/25/2007Correspondence regarding Rockies Express Pipeline B. Lecher.1
09/25/2007Correspondence regarding Rockies Express Pipeline filed by K. Walmsley.1
09/25/2007Correspondence regarding Rockies Express Pipeline filed by M. Yane.1
09/25/2007Correspondence regarding Rockies Express Pipeline filed by D. Graves.2
09/25/2007Correspondence regarding Rockies Express Pipeline filed by J. Rust.2
09/25/2007Correspondence regarding Rockies Express Pipeline filed by C. Wilson.2
09/25/2007Correspondence regarding Rockies Express Pipeline filed by C. Morgan.2
09/25/2007Correspondence regarding Rockies Express Pipeline.4
09/25/2007Correspondence regarding Rockies Express Pipeline filed by FERC.3
09/25/2007Correspondence regarding Rockies Express Pipeline filed by D. Mowrey.2
09/25/2007Correspondence regarding Rockies Express Pipeline filed by Kevin and Debbie Williams.2
09/25/2007Correspondence regarding Rockies Express Pipeline filed by FERC, R. Deal.20
09/25/2007Motion for leave to answer and answer to Mogas Pipeline LLC filed by J. McManus.9
09/25/2007Correspondence regarding Rockies Express Pipeline .21
09/25/2007Correspondence regarding Rockies Express Pipeline filed by R. Clark.12
09/25/2007Correspondence regarding Rockies Express Pipeline filed by N. Mowrey.3
09/25/2007Correspondence regarding Rockies Express Pipeline J. Potts.3
09/25/2007Correspondence regarding Rockies Express Pipeline.2
09/25/2007Correspondence regarding Rockies Express Pipeline.2
09/25/2007Correspondence regarding Rockies Express Pipeline filed by Dave, Susan, and Heather Noll.2
09/25/2007Correspondence regarding Rockies Express Pipeline.2
09/25/2007Correspondence regarding Rockies Express Pipeline filed by N. Mowrey.12
09/25/2007Correspondence regarding Rockies Express Pipeline filed by R. Ripperger.3
09/25/2007Correspondence regarding Rockies Express Pipeline filed by M. Ripperger.3
09/25/2007Correspondence regarding Rockies Express Pipeline .2
09/25/2007Correspondence regarding Rockies Express Pipeline filed by C. Haviland and K. Belcredi..12
09/25/2007Correspondence regarding Rockies Express Pipeline filed by J. Smith.2
09/25/2007Correspondence regarding Rockies Express Pipeline filed by N. Mowrey.2
09/25/2007Answer of Rockies Express Pipeline LLC filed by B. Deathe.9
09/25/2007Motion for leave to intervene out of time and comments of Mogas Pipeline LLC filed by J. McManns .9
09/25/2007Correspondence regarding Rockies Express Pipeline filed by K. Bose.3
09/25/2007Correspondence regarding Rockies Express Pipeline filed by FERC.4
09/25/2007Correspondence regarding Rockies Express Pipeline filed by J. Kelliher.2
09/25/2007Correspondence regarding Rockies Express Pipeline filed by R. Clark.13
09/25/2007Correspondence regarding Rockies Express Pipeline filed by concerned consumers.1
09/25/2007Correspondence regarding Rockies Express Pipeline filed by R. Kemp.1
09/25/2007Correspondence regarding Rockies Express Pipeline filed by J. Smith.3
09/25/2007Correspondence regarding Rockies Express Pipeline filed by FERC.1
09/25/2007Correspondence regarding Rockies Express Pipeline filed by FERC.2
09/25/2007Correspondence regarding Rockies Express Pipeline.4
09/25/2007Correspondence regarding Rockies Express Pipeline filed by FERC.2
09/25/2007Correspondence regarding Rockies Express Pipeline filed by J. Smith.2
09/25/2007Correspondence regarding Rockies Express Pipeline filed by J. Kelliher.2
09/25/2007Correspondence regarding Rockies Express Pipeline filed by FERC.2
09/25/2007Correspondence regarding Rockies Express Pipeline filed by J. Smith.3
09/25/2007Correspondence regarding Rockies Express Pipeline filed by J. Kelliher.4
09/25/2007Correspondence regarding Rockies Express Pipeline filed by G. Alford.2
09/25/2007Correspondence regarding Rockies Express Pipeline filed by J. Donaho.3
09/25/2007Correspondence regarding Rockies Express Pipeline filed by A. Lykens.11
09/25/2007Correspondence regarding Rockies Express Pipeline filed by S. Howe..2
09/25/2007Correspondence regarding Rockies Express Pipeline filed by J. Kelliher.1
07/19/2007Letter protesting the proposed plan for installation of the natural gas pipeline by Rockies Express East filed by consumer W. Knau.2
07/19/2007Correspondence concerning Rockies Express Pipeline, LLC East project filed by D. Hanselmann, Ohio Department of Natural Resources.3
07/19/2007Correspondence notice of overflight and limited site visit for the proposed Rockies Express East Pipeline Project.2
07/19/2007Correspondence of concern to Rockies Express Pipeline project filed by J. Thornley.16
07/19/2007FERC news release dated July 19, 2007, regarding licensing pilot projects for ocean energy hydro technologies to discuss a staff proposal for a process that could complete licensing in as few as six months.2
07/19/2007Correspondence concerning Rockies Express Pipeline East project filed by J. Moffatt.2
07/19/2007Letter of concern from consumers regarding REX Pipeline.27
07/19/2007Correspondence letter concerning Rockies Express Pipeline LLC , filing with the FERC an application to Section 7(c) of the Natural Gas Act and part 157 requesting a certificate of public convenience and necessity authorizing the construction and operation project by consumer.87
07/19/2007Correspondence concerning Rockies Express Pipeline, LLC. REX-East project filed by J. Vann199
06/29/2007Correspondence concerning an updated list of affected property owners for the Rockies Express Pipeline project filed by R. Harrington.2
06/29/2007Correspondence concerning a response to proposed Rockies Express Pipeline, LLC project filed by J. Kelliher.2
06/29/2007Correspondence concerning Rockies Express Pipeline project filed by J. Thornley, Division of Natural Resources.1
06/29/2007Joint motion for leave to intervene out of time of the Indiana Utility Regulatory Commission and the Indiana Office of the Utility Consumer Counselor filed by W. Divine and E. Eisen.5
06/29/2007Meeting minutes from FERC Staff concerning Rockies Express Pipeline, LLC.7
06/29/2007Correspondence concerning Rockies Express Pipeline, LLC East project.2
06/29/2007Correspondence concerning Rockies Express Pipeline, LLC East project.2
06/29/2007Correspondence concerning Rockies Express Pipeline, LLC. filed by concerned property owner, N. Mowrey.1
06/29/2007FERC News release approving two settlements totaling more than $84 million that stem from the Commission's investigations into wholesale power markets during the Western energy crisis of 2000-2001.1
06/29/2007FERC News release rejecting a challenge to the Federal Energy Regulatory Commissions ability to set rules to prevent market manipulation in wholesale power markets.1
06/29/2007FERC News release dated 6/22/07 regarding a federal appellate court rejecting a challenge to FERC's ability to set rules to prevent market manipulation in wholesale power markets.1
06/29/2007FERC News release dated 6/21/07 regarding the finalized new market-based rate reforms to prevent exercise of market power.2
06/29/2007Letter of concern to Rockies Express East filed by consumer D. Keith.2
06/29/2007FERC News release dated 6/21/07 seeking public comment on potential reforms to improve operations in the wholesale power market. 2
06/29/2007Letter of concern from consumer C. Morgan to M. Salas regarding REX Pipeline.2
06/29/2007Response letter from FERC to Sen.Bob Jackman filed by A. Black.2
06/28/2007Motion for leave to intervene and comments filed by parties of interest. 57
06/28/2007Motion for leave to intervene out of time of El Paso Marketing, L.P. filed by K. Irvin. 5
06/28/2007Letter of approved stipulation and consent agreement requiring the payment of accessed civil penalty filed by the Federal Energy Regulatory Commission. 2
06/28/2007Motion of BP America Production Company and BP Energy Company for leave to intervene in support of project filed by F. Kolb and J. Brunenkant; Concerns of the Illinois Farm Bureau file by M. Jontry; Motion for leave to intervene out of time of Texas Eastern Transmission, LP filed by M. Collins; Motion of Chevron Natural Gas for leave to intervene filed by J. Brunenkant.17
06/28/2007Letters expressing concern over the REX-East pipeline project filed by Congressman Charles A. Wilson. 3
06/28/2007Motion to intervene out-of-time of Dave McCarroll filed by R. Clark. 4
06/28/2007Letter expressing concern over the National Gas Line Project filed by J. Little on behalf of McGowin Properties, Ltd. 2
06/28/2007Letter expressing concern over the Rockies Express Pipeline project filed by Sheldon Alverson Trust c/o V. Howard1
06/28/2007Environmental information request for the Rockies Express-East project filed by A. Lykens on behalf of the Federal Energy Regulatory Commission. 15
06/28/2007Notice of FERC staff attendance filed by K. Bose on behalf of Commission's Office of External Affairs.1
06/28/2007Response to an informal data request of the staff of the Federal Energy Regulatory Commission with regard to the pipeline route filed by S. Howe on behalf of Rockies Express Pipeline LLC.3
06/28/2007Notice of intervention of Dean E. Mowrey and Nancy R. Mowrey filed by Dean and Nancy Mowrey. 5
06/28/2007Letter expressing concerning over the REX Pipeline project filed by C. Morgan. 2
06/28/2007Motion to intervene out-of-time of Laclede Gas Company filed by K. Neises.6
06/25/2007Letter and photos identifying areas with potential roost trees along the REX-East pipeline route filed by J. Thommes. 3
06/25/2007Letter describing the proposed mussel survey protocol for waterbodies along the proposed project route filed by J. Thommes Rockies Express. 8
06/25/2007Letter concerning Big Darby mussel survey is double impact to the stream filed by A. Zimmerman on behalf of U.S. Fish and Wildlife Services. 3
06/25/2007Letter expressing concerning Rockies Express Pipeline Project. 1
06/25/2007Letter expressing concern over the Rockies Express Pipeline Project.1
06/25/2007Letter expressing concern over a bald eagles nest in close proximity to the proposed route of the project filed by A. Zimmerman on behalf of U.S. Fish and Wildlife Service. 3
06/25/2007Letter to Becky Jenkins concerning the mussel survey protocol filed by C. Howard on behalf of Ecological Specialists, Inc.10
06/25/2007Letter summarizing Rockies Express proposed construction and restoration methods through the COA's potentially affected by the project filed by J. Thommes on behalf of Natural Resource Specialist. 4
06/25/2007Agency Correspondence Index of Rockies Express-East Project. 1
06/25/2007Letter concerning the Rockies Express Pipeline Project.1
06/25/2007Proposed crossing methods for the Mississippi River filed by J. Thommes on behalf of Natural Resource Group Inc. 5
06/25/2007Letter describing proposed aquatic resource survey protocol for Sugar and Salt Creeks in Indiana filed by J. Thommes. 3
06/25/2007Letter offering comments for information in accordance with the National Environmental Polity Act of 1969 filed by L Petercheff on behalf of Indiana Department of Natural Resources. 9
06/25/2007Recommendation mist-net surreys be conducted filed by A. Zimmerman on behalf of U.S. Fish and Wildlife Service. 2
06/25/2007Letter recommending mist-net surveys be conducted at each site filed by J. Collins on behalf of U.S. Fish and Wildlife Service Marion Illinois Sub-Office.2
06/25/2007Response to FERC comments dated April 26, 2007 on behalf of Rockies Express Pipeline-East Project filed by R. Childs 186
06/25/2007Resource Report 4 & Data Request #3 for Rockies Express Pipeline-East Project filed by M. Miles.48
06/25/2007Letter explaining the Department has been working with REX and NRG to evaluate environmental impacts filed by D. Brown.3
06/25/2007Comments to Jeff Thommes from Mindy Bankey in regards to the REX Pipeline Project.3
06/25/2007Letter summarizing the Rockies Express' proposed construction and restoration methods thought the COA's potentially affected by the project filed by J. Thommes on behalf of Natural Resource Specialist. 4
06/25/2007Diagram of the typical right of way cross section lateral. 1
06/25/2007Diagram of the typical right of way cross section and Greenfield proposed wetland easement.1
06/08/2007Correspondence of motion to intervene and comments of Panhandle Eastern Pipe Line Company, LP in regard to Rockies Express Pipeline, LLC filed by W. Grygar.4
06/08/2007Correspondence of motion to intervene and comments in support of EnCana Corporation in regard to Rockies Express Pipeline, LLC filed by C. Piczak.4
06/08/2007Correspondence filed by Mr. and Mrs. Lecher.5
06/08/2007Correspondence filed by J. Schneider.5
06/08/2007Correspondence filed by J. Smith, PhD.10
06/08/2007Correspondence filed by J. Smith, PhD.2
06/08/2007Correspondence of response letter filed by C. Moffatt.2
06/08/2007Correspondence of response letter filed by J. Kelliher1
06/08/2007Correspondence to the Honorable Phil Hare filed by J. Kelliher.2
06/08/2007Correspondence to Alice Weekly concerning Rockies ExpressPipeline, LLC filed by M. Robinson.2
06/08/2007Correspondence and request for modifications of Rockies Express Pipeline, LLC filed by R. Harrington.2
06/08/2007Teleconference on agency concerns with Rockies Express Eastern Phase Project.2
06/08/2007Correspondence and motion to intervene submitted on behalf of The Ohio Power Siting Board by W. Wright.3
06/08/2007Correspondence to Kimberly Bose in regards to Rockies Express Pipeline, LLC filed by E. Biro, Assistant General Counsel of Rockies Express Pipeline, LLC.3
06/08/2007Correspondence and motion of Yates Petroleum Corporation for leave to intervene in support concerning Rockies Express Pipeline, LLC filed by D. John. 3
06/08/2007Correspondence and motion for leave to intervene of the City of Hamilton, Ohio concerning Rockies Express Pipeline, LLC filed by J. Greene. 3
06/08/2007Correspondence and notice of intervention of the Missouri Public Service Commission concerning Rockies Express Pipeline, LLC filed by L. Shemwell.4
05/18/2007Information of Rockies Express Pipeline, LLC's; application for a certificate of public convenience and necessity filed by R. Harrington. 3
05/18/2007Information of Rockies Express Pipeline, LLC's; news release regarding the Commission's approval of NERC's assignment of violation risk factors associated with approved reliability standards, filed on behalf of the Federal Energy Regulatory Commission.2
05/18/2007Information of Rockies Express Pipeline, LLC's; news release regarding the Commission's acts on long-term transmission rights in Midwest ISO and PJM territories, filed on behalf of the Federal Energy Regulatory Commission.2
05/18/2007Information of Rockies Express Pipeline, LLC's; record of communication between third party consultants and outside parties.4
05/18/2007Information of Rockies Express Pipeline, LLC's; news release regarding the Commission's denial of stay in New England of forward capacity market proceeding filed on behalf of the Federal Energy Regulatory Commission.1
05/18/2007Information of Rockies Express Pipeline, LLC's; 9 records of communication between third party consultants and outside parties; M. Moser-ICF International (2), J. Hansel-ICF International (5), J. Thomas-ICF-International (2). 11
05/18/2007Information of Rockies Express Pipeline, LLC's; Motion to intervene filed on behalf of Tennessee Gas Pipeline Company by K. Erwin.5
05/18/2007Information of Rockies Express Pipeline, LLC's; news release regarding the Commission's reduction of termination fees required by the Town of Norwood, Massachusetts by $30 million filed on behalf of the Federal Energy Regulatory Commission. 1
05/15/2007Letter concerning Rockies Express-East Pipeline project filed by J. Forman. 3
05/11/2007Correspondence letter regarding the construction of Rockies Pipeline East filed by J. Whitacre.1
05/11/2007Letter requesting consideration over the Sny Island Levee Drainage District and addressing the concern in a reasonable matter before approving the REX East pipeline filed by Phil Hare, Member of Congress.3
05/11/2007Letter to the Federal Energy Regulatory Commission indicating that the Senate Bill 529 has passed Indiana General Assembly and is waiting to be signed by the Governor and also requesting time needed to comply with the new statute on pipeline construction standards and not approve the REX EAST application until that time, filed by Bob Jackman, Senator of Indiana.35
05/10/2007Information of Rockies Express Pipeline, LLC's notice of application filed by K. Bose.137
05/10/2007Information of Rockies Express Pipeline, LLC's application for a certificate of Public Convenience and necessity filed with Federal Energy Regulatory Commission filed by R. Harrington.140
05/08/2007Response letter to Peter Yackle requesting consideration of attached letter filed by G. Voinovich, U. S. Senator of Ohio.5
05/08/2007Correspondence letter expressing opposition and concern regarding the Rockies Express Pipeline Project filed by D. Reynolds.3
05/02/2007Correspondence enclosing Staff's comments on second draft environmental resources reports for the Rockies Express Pipeline-East Project filed by L. Turner.16
05/02/2007Correspondence concerning the Rockies Express Pipeline Project-East filed by A. Black.2
05/02/2007Correspondence concerning the Rockies Express Pipeline filed by H. Tate.2
05/02/2007Minutes from meeting held on April 17, 2007 for the Rockies Express Pipeline-East Project.1
05/02/2007Teleconference schedule for April 12, 2007 at 10:00 a.m. EST to discuss agency concerns with Rockies Express Pipeline-East (REX) Project.2
05/02/2007Letter with concerns and questions of negotiations regarding the proposed route of the Rockies Express Pipeline for Indiana Senate District 42, filed by Senator Bob Jackman.3
04/24/2007Weekly status report of Rockies Express Pipeline, LLC by S. Howe.5
04/19/2007Correspondence concerning Rockies Express Pipeline Project filed by R. and S. Tilford.3
04/19/2007Correspondence concerning Rockies Express Pipeline Project filed by M. Harper.4
04/19/2007Correspondence concerning Rockies Express Pipeline Project filed by A. Black.2
04/19/2007Correspondence concerning Rockies Express Pipeline Project filed by J. Ludwig.1
04/19/2007Correspondence concerning Rockies Express Pipeline-East Project.2
04/19/2007Correspondence concerning Rockies Express Pipeline LLC filed by S. Howe.23
04/18/2007Correspondence concerning Rockies Mountain Express, LLC filed by Mr. & Mrs. M. Yarmuth.1
04/13/2007Information on teleconference to discuss agency concerns with Rockies Express Pipeline-East (REX East) Project.2
04/13/2007Correspondence concerning revisions by Rockies Express Pipeline, LLC filed by R. Christin.1
04/13/2007Correspondence concerning Rockies Express Pipeline filed by M. Fain.1
04/13/2007Weekly status report of Rockies Express Pipeline by S. Howe.5
04/13/2007Weekly status report of Rockies Express Pipeline, LLC filed by R. Christin.6
04/13/2007Correspondence concerning REX Pipeline filed by Evelyn and Jane Maguire.2
04/13/2007Correspondence concerning REX Pipeline filed by Bob and Myra Ripperger.2
04/03/2007Letter concerning Rockies East Pipeline Project filed by J. McKamey2
04/03/2007Letter concerning Rex Pipeline Project filed by L. White.2
04/03/2007Letter concerning Rockies East Pipeline Project filed by R. Sager.2
03/30/2007Correspondence letter filed by S. Rust, consumer.3
03/30/2007Weekly status report of Rockies Express Pipeline, LLC filed by R. Christin.6
03/29/2007Revisions by Rockies Express Pipeline LLC to draft Resource Report Nos. 6 and 7 of the REX-East project, filed by S. Howe. (Part 1 of 3)101
03/29/2007Report continued. (Part 2 of 3)101
03/29/2007Revisions by Rockies Express Pipeline LLC to draft Resource Report Nos. 4 and 5 of the REX-East project, filed by S. Howe.168
03/29/2007Correspondence letter concerning FERC conference call and meeting memo's discussing current projects. 3
03/29/2007Report Cont'd. (PART 3 of 3)83
03/29/2007Letter with concerns over the Rocky Express Pipeline and the treatment that the company has given to landowner filed by D. Parker.1
03/29/2007Correspondence opposing Rockies Pipeline Express Project filed by affected consumer, B. Lecher and R. Lecher.1
03/29/2007Letter with concerns over the Rocky Express Pipeline and the treatment that the company has given to landowner filed by R. Hughes. 4
03/29/2007Correspondence in opposition of REX Pipeline filed by affected consumer, M. Yane.2
03/29/2007Correspondence in opposition of Rex pipeline filed by affected consumer, C. Morgan.2
03/27/2007Monthly status report of Rockies Express Pipeline Project, REX-East filed by S. Howe.92
03/27/2007Weekly status report filed by S. Howe on behalf of the Rockies Express Pipeline LLC.5
03/27/2007Correspondence letters filed by various consumers.14
03/27/2007Letter with concerns of negotiation without the input of landowners regarding the proposed route of the Rockies Express Pipeline for Indiana Senate District 42, filed by Senator Bob Jackman.38
03/12/2007Letter with concerns over the Rocky Express Pipeline and the treatment that the company has given them so far, filed by consumers Carl and Wilma Messerly. 3
02/28/2007Draft Resource Reports 2, 3, and 10 on the Rockies Express-East Project filed by L. Turner on behalf of the Office of Energy Projects.9
02/28/2007Correspondence letter filed.2
02/27/2007Letter concerning the Rockie Express Pipeline, LLC project filed by R. Strom, PUCO staff.1
02/16/2007Pre-filing monthly activity report for Rockies Express Pipeline-East Project filed by S. Howe.3
02/15/2007Letters concerning the Rockies Express Pipeline project filed by various consumers. 9
02/12/2007Letter of notification to Property owners from Rockies Express Pipeline, filed by J. McGee.43
02/06/2007Letter concerning Rockies Express Pipeline project filed by E & S Ripperger.1
02/06/2007Letter concerning some of the negative implications associated with the REX-east pipeline project filed by T. Althauser on behalf of Perry Soil and Water Conservation District Board of Supervisors.2
02/05/2007Letter concerning the Rockies Express Pipeline Project filed by D. Abney. 8
02/01/2007Correspondence of the Federal Energy Regulatory Commission filed by L. Turner. 8
02/01/2007Correspondence of L. Turner on behalf of Federal Energy Regulatory Commission.13
02/01/2007Correspondence of the Federal Energy Regulatory Commission filed by J. Kelliher.4
02/01/2007Correspondence of United States Department of the Interior filed by E. Quintana.3
02/01/2007Correspondence of Re Route Rex, Inc.4
02/01/2007Correspondence of Rockies Express Pipeline.1
02/01/2007Correspondence of the United States Department of the Interior filed by E. Quintana.3
02/01/2007Additional information of Rockie Express Pipeline.1
02/01/2007Correspondence regarding Rockies Express Pipeline.1
02/01/2007Correspondence regarding Rockies Express Pipeline..1
01/24/2007Letter expressing opposition regarding the Rockies Express Pipeline Project, Eastern phase filed by Randy L. Miller. 1
01/19/2007Correspondence filed by R. D. Craven.3
01/18/2007Monthly activity report of Rockies Express Pipeline-East project filed by S. Howe.3
01/16/2007Correspondence filed by R. Crawford.1
01/16/2007Correspondence letter filed by S. Buyer on behalf of Congress of The United States.1
01/12/2007Upland construction plan of Rockies Express Pipeline-East project filed on behalf of Rockies Express Pipeline, LLC.16
01/12/2007Information of Rockies Express Pipeline-East on pipeline construction standards and policies filed on behalf of Rockies Express Pipeline, LLC. 9
01/12/2007Draft of Rockies Express Pipeline-East project of resource report 12, PCB contamination.2
01/12/2007Draft of Rockies Express Pipeline-East project of resource report 11, reliability and safety.10
01/12/2007Draft of Rockies Express Pipeline-East project of resource report 8, land use, recreation and aesthetics.157
01/12/2007Draft of Rockies Express Pipeline-East project of resource report 7, of soil resources.135
01/12/2007Draft of Rockies Express Pipeline-East project of resource report 10, alternatives.29
01/12/2007Draft of Rockies Express Pipeline-East project of resources report 5, socioeconomics.22
01/12/2007Draft of Rockies Express Pipeline-East project of resource report 3, fish, wildlife and vegetation.179
01/12/2007Draft of Rockies Express Pipeline-East project for resource report 1 filed on behalf of Rockies Express Pipeline, LLC.112
01/12/2007Draft resource reports of Rockies Express Pipeline-East project, volume 1 public information filed on behalf of Rockies Express Pipeline, LLC.1
01/12/2007Draft resource report No. 9 filed on behalf of Rockies Express Pipeline, LLC.49
01/12/2007Draft resource report 6 filed on behalf of Rockies Express Pipeline, LLC.34
01/12/2007Procedures of Rockies Express Pipeline-East project of wetland and waterbody construction and mitigation. 19
01/12/2007Resource report 2 of water use and quality of Rockies Express Pipeline-East project. 72
01/12/2007 Material relating to the drafts of all resource reports that it is intended to file with its application etc regarding the REX-East project under PF06-30 submitted on behalf of Rockies Express Pipeline, LLC.3
01/12/2007Correspondence filed by S. Howe on behalf of Rockies Express Pipeline LLC.2
01/11/2007Resource Report 4 continued. (Part 3 of 3)50
01/11/2007Resource Report 4 continued. (Part 2 of 3) 186
01/11/2007Resource Report 4, Cultural Resources filed on behalf of Rockies Express Pipeline-East Project. (Part 1 of 3) 200
01/09/2007Correspondence letter filed by S. Howe.1
01/05/2007Comments filed by Butler County, Ohio Engineer's office regarding the Rockies Express Pipeline Project-East. (FERC No. PF06-30-000), filed by G. Wilkens.2
01/02/2007Pre-filing monthly activity report for Rockies Express Pipeline-East Project, filed by S. Howe.4
01/02/2007Addition to the August 20th letter on the environmental Impact of Rockies Express Pipeline-East project, filed by consumer D. J. Noll.4
12/27/2006Comments submitted to FERC by the Butler County (Ohio) Engineer's Office regarding the Rockies Express Pipeline Project, filed by G. Wilkens.2
12/14/2006Correspondence letter regarding Rockies Express Pipeline filed by the Morgan County Board of Commissioners with attached FERC response. 4
12/14/2006Correspondence letters regarding the Rockies Express Pipeline filed by various consumers.7
12/14/2006Supplemental submission, impact agreement filed by W. Wright, PUCO Attorney General Section on behalf of OPSB.34
12/14/2006FERC conference call minutes for 11/21/06.1
12/14/2006Monthly activity report for Rockies Express Pipeline - East Project (REX-East). filed by S. Howe.3
12/12/2006Letter regarding conference calls by FERC regarding the location of maps to be obtained by consumers from Rockies Express Pipeline.3
12/12/2006Correspondence letters to FERC regarding the Rockies Express Pipeline project filed by various consumers.9
12/12/2006Letter to Mr. Whitenton of FERC requesting consideration of attached letters and response filed by R. Lugar-Senator.16
12/12/2006Response Letter to Representative Pence regarding the Rockies Express Pipeline Project-East, filed by J. Kelliher.2
12/12/2006Correspondence to Senator Bray responding to recent letter regarding the Rockies Express Pipeline Project, filed by B. Lee.2
12/12/2006Copy of letter mailed to party addressed/current resident on the Rockies Express Pipeline Project regarding comments or questions with contact information attached, filed by A. Lykens-Office of Energy Projects.2
12/07/2006Letter expressing concern over the Rockies Express Pipeline Project filed by A. Lykens.1
12/07/2006Letter expressing concern over Rockies Express Pipeline Project filed by M. Pence.1
12/07/2006Letter expressing concern over Rockies Express Pipeline Project filed by M. Pence.1
12/07/2006Letter expressing concern over Rockies Express Pipeline Project filed by R. Bray.1
12/07/2006Letter expressing concern over Rockies Express Pipeline Project filed by K. Westlake.7
12/07/2006Letter expressing concern over Rockies Express Pipeline Project filed by C. Hardaman.2
12/07/2006Letter expressing concern over Rockies Express Pipeline Project filed by P. Reynolds.2
12/07/2006Letter expressing strong opposition to the proposed pipeline and compressor station filed by Terry and Linda Cox.1
12/07/2006Addendum to Potential Environment Effects letter filed by Muriel and Paul Schoenharl.1
12/04/2006Transcript for hearing held September 13, 2006 in connection with Rockies Pipeline Eastern Phase Project.69
12/04/2006Transcript for hearing held September 11, 2006 in connection with Rockies Pipeline Eastern Phase Project.39
12/04/2006Transcript for hearing held September 15, 2006 in connection with Rockies Pipeline Eastern Phase Project.37
12/04/2006Transcript for proceeding held September 14, 2006 in connection with Rockies Express Pipeline Eastern- Phase Project.41
12/04/2006Transcripts for proceedings held September 14, 2006 in connection with the Rockies Express Pipeline Project- Eastern Phase.79
12/04/2006Final rule revises purpa mandatory purchase obligation for electric utilities as mandated by Energy Policy Act filed by B. Connors.3
12/04/2006Acts to strengthen Natural Gas infrastructure by Expanding eligibility of blanket certificate activities filed by T. Young-Allen.2
12/04/2006Transcripts for proceedings for public hearing held Tuesday, September 12, 2006, filed in connection with the Rockies Express Pipeline Eastern Phase Project.83
12/04/2006New finalized accounting rules by the Commission designed to increase accounting transparency filed by C. Miller. 2
12/04/2006Proposed rule would approve 83 NERC reliability standards funding for statutory activities through ERO approved filed by B. Lee.3
12/04/2006Transcript for proceedings held 9/11/06 at the Illinois State Fairgrounds in connection with the Rockies Express Pipeline Project, Eastern Phase held before D. Sipe, of FERC.48
12/04/2006Letter approving the mergers of National Grid and Keyspan and Northwestern Corp., Babcock and Brown filed by B. Connors.3
12/04/2006Letter concerning Rockies Pipeline Project filed by G. Johnson1
12/04/2006Public hearing held Monday, September 11, 2006, at 7:00 p.m. to 9:00 p.m., at the Greensburg High School Auditorium, 1000 East Central Avenue, Greenburg, Indiana filed in connection with the Rockies Express Pipeline Eastern Phase Project.69
12/04/2006Letter concerning Rockies Pipeline Project filed by R. Bischoff.1
12/04/2006Letter concerning Rockies Pipeline Project filed by L. Lowe.1
12/04/2006Letter concerning Rockies Pipeline Project filed by C. Kawamota2
12/04/2006Scoping meeting proceedings held September 13, 2006 for the matter of Rockies Express Pipeline Project (Eastern Phase) before D. Sipe, FERC.35
12/04/2006Letter concerning Rockies Express project filed by Concerned Citizen.1
12/01/2006Corrected addresses for mailing labels for the Rockies Express Pipeline LLC,. project filed by S. Howe.8
12/01/2006Monthly activity report for Rockies Express Pipeline - East Project (REX-East) filed by S. Howe.4
12/01/2006Response to issues raised during the scoping comment period addressing the proposed Rockies Express Pipeline - East Project (REX-East) filed by S. Howe.30
12/01/2006Letter expressing concerning with The Rockies Pipeline (REX) project Marion County filed by Andra and Ralph Poehls.1
12/01/2006Comments of The Staff of The Ohio Power Siting Board filed by W. Wright.31
12/01/2006Corrected addresses for the mailing label on the Rockies Express Pipeline LLC. filed by S. Howe.71
11/07/2006Comments concerning FERC's Notice of Intent to prepare an EIS for the Rockies Express Pipeline Project, Eastern Phase in Missouri, Illinois, Indiana, and Ohio, filed by K. Westlake.14
11/07/2006Federal Energy Regulatory Commission Chairman Joseph T. Kelliher has announced the appointment of Judge Lawrence Brenner as Deputy Chief Administrative Law Judge.2
11/03/2006Letter opposing the Rockies Express Pipeline project, filed by G. Dorman.2
11/03/2006Letter opposing the Rockies Express Pipeline project, filed by A. Ballard.1
11/03/2006Letter opposing the Rockies Express Pipeline project .6
11/03/2006Letter opposing the Rockies Express Pipeline project, filed by May and Dave Delaney.45
11/03/2006Letter opposing the Rockies Express Pipeline project, filed by William and Michelle Pelham.4
11/03/2006Letter opposing the Rockies Express Pipeline project, filed by Anna Vonderhaar.1
11/03/2006Letter opposing the Rockies Express Pipeline project, filed by William and Teresa Shobe.1
11/03/2006Environmental impact statement of the Revae and Eugene Morris family.18
11/03/2006Letter opposing the Rockies Express Pipeline project, filed by Ray and Joann Esteb.1
11/03/2006Letter opposing the Rockies Express Pipeline project, filed by H. Profitt.7
11/03/2006Letter opposing the Rockies Express Pipeline project, filed by Odell and Geneva Lundy.2
11/03/2006Letter opposing the Rockies Express Pipeline project, filed by D. Riedel.2
11/03/2006Letter opposing the Rockies Express Pipeline project, filed by D. Noll.17
11/03/2006Letter opposing the Rockies Express Pipeline project, filed by J. Planker.2
11/03/2006Letter opposing the Rockies Express Pipeline project, filed by L. Atkinson.1
11/03/2006Letter opposing the Rockies Express Pipeline project, filed by Dennis and Barbara Atley.1
11/03/2006Letter opposing the Rockies Express Pipeline project, filed by K. Beckman and P. Benoit.1
11/03/2006Letter opposing the Rockies Express Pipeline project, filed by Betty and G.L. Barger.2
11/03/2006Letter opposing the Rockies Express Pipeline project, filed by R. Thomas.2
11/03/2006Letter opposing the Rockies Express Pipeline project, filed by M. Canfield-Schoeharl and P. Schoenharl.1
11/03/2006Letter opposing the Rockies Express Pipeline project, filed by Amy Jo Kunkel.5
11/03/2006Letter opposing the Rockies Express Pipeline project, filed by Senator B. Jackman.1
11/03/2006Letter opposing the Rockies Express Pipeline project, filed by P. Benoit and K. Beckman.2
11/03/2006Letter opposing the Rockies Express East pipeline project, filed by J. Brewster.2
11/03/2006Letter opposing the Rockies Express East pipeline project, filed by Michael & Bethany Mortashed.1
11/03/2006Letter opposing the Rockies Express East pipeline project, filed by N. Dorman.2
11/03/2006Letter opposing the Rockies Express East pipeline project, filed by M. Chapman.1
11/03/2006Letter opposing the Rockies Express East pipeline project, filed by Robert and Beverly Scellato.2
11/03/2006Map filed.1
11/03/2006Notice of intent to prepare an environmental impact statement for the proposed Rockies Express Pipeline Project, Eastern Phase filed on behalf of Ohio Farm Bureau by D. Arnold.27
11/03/2006Map filed.1
10/31/2006Letter to FCC regarding the Rockies Express Pipeline Projects, filed on behalf of Rockies Express Pipeline, LLC by J. Moffatt.2
10/31/2006Letter regarding the Rockies Express Pipeline, Clearcreek Township, Warren County filed by J. Thorman.2
10/31/2006Letter regarding Rockies Express Pipeline, Belmont County filed by J. Morgan.3
10/31/2006Letter regarding comments on the flawed process of Rockies Express Pipeline Project, filed by Joseph and Susan Rust.2
10/31/2006Letter opposing the Rockies Express Pipeline project, filed by Pat & Deana Hadnell.1
10/31/2006Letter regarding the Rockies Express Pipeline, Clearcreek Township filed by J. Thorman.4
10/31/2006Letter requesting that the process for obtaining formal comments be extended by FERC and notification be undertaken again and more thoroughly by REX, filed by J. Rowe.2
10/31/2006Letter regarding the proposed route for the Rockies Express Pipeline in Belmont County, Ohio, filed by J. Morgan.2
10/31/2006Letter regarding Rockies Express Pipeline crossing his property, filed by L. Minges.1
10/31/2006Letter with concerns about the proposed route of the Rockies Express Pipeline in Belmont County, Ohio, filed by j. Morgan.3
10/31/2006Letter with concerns and questions regarding Rockies Express Pipeline project, filed by M. Shaffer.2
10/31/2006Letter to M. Salas of FCC regarding the proposed pipeline project, filed by J. Thorman.4
10/17/2006Notice of Intent to prepare an environmental impact statement for the proposed Rockies Express Pipeline Project filed by E. Quintana.5
10/16/2006Letters expressing concerns on the construction of Rockies Express Pipeline filed on behalf of Indiana Farm Bureau Inc.22
10/16/2006Pipeline construction standards and policies for Agricultural Impact Mitigation recommended by the Illinois Department of Agriculture.16
10/16/2006Additional sheet for comments concerning pipeline project filed by S. Brown.2
10/16/2006Letters concerning pipeline project filed by M. Duke.10
10/16/2006Pipeline construction standards and policies for Agricultural Impact Mitigation recommend by the Illinois Department of Agriculture.16
10/12/2006Analysis of the material received on August 16, 2006, filed by R. McAhron on behalf of DNR.2
10/12/2006New natural gas pipeline through central Indiana from Missouri to Ohio filed by J. Egge.4
10/11/2006Letter concerning pipeline project filed by M. Hardamon.2
10/11/2006Letter concerning pipeline project filed by W. Murray.2
10/11/2006Letter concerning pipeline project filed by L. Orschell.2
10/11/2006Letter concerning pipeline project filed by E. Sharp.3
10/11/2006Letter concerning pipeline project filed by R. and A. Huffine.3
10/11/2006Letter concerning pipeline project filed by D. Hewitt, Sr.4
10/11/2006Letter concerning pipeline project filed by M. Hartley.1
10/11/2006Letter concerning pipeline project filed by J. Beck.1
10/11/2006Letter concerning pipeline project filed by J. Planker.2
10/11/2006Letter concerning pipeline project filed by M. Dietel.1
10/11/2006Letter concerning pipeline project filed by C. Reedy.3
10/11/2006Letter concerning pipeline project filed by M. McCarthy, Town Manager of Bargersville.2
10/11/2006Letter concerning pipeline project filed by M.and K. Taylor.7
10/11/2006Letter concerning pipeline project filed by Scott and Beverly Stout.2
10/11/2006Letter concerning pipeline project filed by A. Lykens.1
10/11/2006Letter concerning pipeline project filed by S. Marley.3
10/11/2006Summary of Eastern Phase public scoping meeting filed by Rockies Express Pipeline.11
10/11/2006Guideline for installation of utilities beneath Corps of Engineers levees using horizontal directional drilling filed by C. Latorre and L. Wakeley on behalf of US Army Corps of Engineers.29
10/10/2006Letter expressing concern over pipeline project filed by M. Yane.2
10/10/2006Letter opposing pipeline project filed by consumer M. Oster.3
10/10/2006Letter expressing concern over pipeline project filed by Customer.3
10/10/2006Letter expressing concern over pipeline project filed by C. Kawamoto.2
10/10/2006Letter expressing concern over pipeline project filed by Betty and Robert Lecher.3
10/10/2006Letter expressing concern over pipeline project filed by Eric and Brenda Acker.3
10/10/2006Letter expressing concern over pipeline project filed by E. Jacobs.3
10/10/2006Letter expressing concern over pipeline project filed by J. Meal.3
10/10/2006Letter expressing concern over pipeline project filed by M. Salas.2
10/10/2006Letter expressing concern over pipeline project filed by Eric and Brenda Acker.4
10/10/2006Letter expressing concern over pipeline project filed by J. Whitacre.2
10/10/2006Letter expressing concern over pipeline project filed by C. Carmichael2
10/10/2006Letter expressing concern over pipeline project filed by R. Filder.3
10/10/2006Letter expressing concern over pipeline project filed by Jerry and Tami Reamer.3
10/10/2006Letter asking that state senators be added to the mailing list filed by J. Wisco.1
10/10/2006Letter expressing concern over pipeline project filed by H. Daily.2
10/10/2006Letter expressing concern over pipeline project filed by Customer.2
10/10/2006Letter expressing concern over pipeline project filed by Consumer.2
10/10/2006Letter expressing concern over pipeline project C. Redeker.1
10/06/2006Letter concerning pipeline project filed by J. Primark and D. Bath.2
10/06/2006Letter concerning pipeline project filed by John and Catherine Rowe.3
10/06/2006Letter concerning pipeline project filed by H. Deckard.6
10/06/2006Letter concerning pipeline project filed by W. Murray.3
10/06/2006Letter concerning pipeline project filed by R. Mannix.3
10/06/2006Letter concerning pipeline project filed by D. Bahr.1
10/06/2006Letter concerning pipeline project filed by Charles Thomas and Kim Reedy.3
10/06/2006Letter concerning pipeline project filed by Joyce and Tom Davis II.1
10/06/2006Letter concerning pipeline project filed by S. Ballard.1
10/06/2006Letter concerning pipeline project filed by David and Karen Morrison.1
10/06/2006Letter concerning pipeline project filed by R. Meal.1
10/06/2006Letter concerning pipeline project filed by J. Hartung.1
10/06/2006Letter concerning pipeline project filed by Robert and Myra Ripperger.2
10/06/2006Letter concerning pipeline project filed by Steve, Alma Shaul and family.3
10/06/2006Letter concerning pipeline project filed by B. Ballard.2
10/06/2006Letter concerning pipeline project filed by K. Roiush.2
10/06/2006Letter concerning pipeline project filed by S. Howe.2
10/06/2006Letter concerning pipeline project filed by D. Robinson.1
10/06/2006Letter concerning pipeline project filed by B. Jacobs.1
10/04/2006Letter concerning the pipeline project filed by B. Bane.1
10/04/2006Letter concerning the pipeline project filed by Mrs. D. Earnhart.4
10/04/2006Letters concerning the pipeline project filed by S. Potter P.E. and R. Miller.4
10/04/2006Letter expressing concern over the pipeline project filed by Senator Bob Jackman D.V.M.3
10/04/2006Letter opposing the pipeline project L. Orschel.2
10/04/2006Letter opposing the pipeline project filed by L. Walmsley.6
10/03/2006Letter stating that the proposed pipeline will interrupt a water source filed by E. Frey.1
10/03/2006Letter asking FERC to reconsider the pipeline project on the land of Wampum Hardware filed by B. Strittmatter, P.E.2
10/03/2006Letters stating that Rockies Express Pipeline is not wanted on their land by M. Hartley.2
10/03/2006Trustee Eugene H. Doebelin asking to stay on the mailing list for the Rockies Express Pipeline-East Project.1
10/03/2006Letter to FERC concerning the running of pipeline through City of Franklin city limits, filed by Mayor B. Jones-Matthews and M. Buening, P.E, City Engineer.1
10/03/2006Comments regarding the Rockies Express Pipeline- East Project filed by L. Orschell.2
10/03/2006Comments concerning the Rockies Express Pipeline - East Project filed by S. Brown.2
10/02/2006Letter to FERC regarding proposed construction by Rockies Express Pipeline filed on behalf of Eastern Shawnee Tribe of Oklahoma by D. McCormick.1
10/02/2006Letter to FERC opposing route of the Rockies Express Pipeline filed by C. Redeker.1
10/02/2006Letter of concern regarding proposed construction by Rockies Express and its anticipated impact upon water resources filed on behalf of D. Frye and B. Frye by M. Foley.1
10/02/2006Letter opposing the route of the Rockies Express Pipeline, filed by consumer J. L. Bearden.1
10/02/2006Letter on behalf of FERC to Rockies Express Pipeline, LLC regarding mailing addresses of property owners filed by A. Lykens.2
10/02/2006Letter to FERC opposing the route of the Rocky Express Pipeline Project, filed by consumers Bob and Kathy Whitney.1
10/02/2006Pre-filing monthly activity report to FERC for Rockies Express Pipeline - East Project (REX-East), filed by S. Howe.4
10/02/2006Letter to FERC regarding the Proposed Rockies Express Pipeline Project, filed on behalf of Wyandotte Nation by J. Wilson.3
10/02/2006Letter opposing Rockies Express Pipeline Project filed on behalf of W. B. Scott by M. Stout.1
10/02/2006Letter proposing the potential conflict existing with the REX East project filed by B. Bird on behalf of Macon County Highway Department.1
09/28/2006Letter proposing an alternative route based on the historical value of the land filed by W. Smith.6
09/28/2006Letter strongly opposing the construction of the Rockies Express Pipeline filed by R. Breneman.1
09/28/2006Letter informing the potentially affected landowners on how to participate in the routing of the pipeline filed by M. Boyle, FERC.2
09/28/2006Letter opposing the construction of the Rockies Express Pipeline filed by J. Rust.2
09/28/2006Letter indicating the need to use a different route for the construction of the pipeline filed by K. Norman1
09/28/2006Letter opposing the approval of the project filed by C. Luers.1
09/27/2006Letter expressing concerns on how to participate in the ultimate routing of the pipeline filed by R. Lugar. (filed 9/26/06)2
09/27/2006Monthly activity report for the Rockies Express Pipeline LLC filed by S. Moore. (filed 9/26/06)3
09/27/2006Letter voicing concerns for the construction of Rockies Express Pipeline filed by J. Eggers on behalf of the Johnson County Board of Commissioners. (filed 9/26/06)2
09/27/2006Response letter stating that scheduled public scoping meetings for the construction of Rockies Express Pipeline will be announced in upcoming notices filed by J. Kelliher, FERC. (filed 9/26/06)2
09/27/2006Response letter stating that scheduled public scoping meetings for the construction of Rockies Express Pipeline will be announced in upcoming notices filed by J. Kelliher, FERC. (filed 9/26/06)2
09/27/2006Notice of intent to prepare an environmental impact statement for the proposed construction of Rockies Express Pipeline Project, Eastern Phase and request for comments on environmental issues and notice of public scoping meetings filed by M. Salas, FERC. (filed 9/26/06).10
09/27/2006Letter encouraging stakeholders to attend and identify their concerns and alternatives in regard to the construction of Rockies Express Pipeline filed by J. Rowe.2
09/27/2006Letter voicing the concern for Rockies Express Pipeline proposal filed by A. Lykens6
09/27/2006Letter of Indiana Department of Natural Resource expressing concerns for the construction of Rockies Express Pipeline LLC filed by M. Widenhofer.16
09/27/2006Letter voicing concerns of consumer on laying pipeline in their area, filed by E. Bayh. (filed 9/26/06).9
09/27/2006Letter expressing concerns on the construction of Rockies Express Pipeline filed by M. Mettler on behalf of the Indiana Department of Environmental Management.3
09/25/2006Monthly status report of Rockies Express Pipeline, LLC filed by S. Howe69
09/25/2006Correspondence letter in regard to the construction of the pipeline filed by J. and C. Costello.10
09/25/2006Correspondence letter concerning the construction of the pipeline filed by C. Costello.2
09/21/2006Letter voicing concerns of laying pipeline in their area, filed by consumers.2
09/21/2006Letter from consumer opposing the laying of pipeline across their property, filed by Jim & Carol Ostello.9
09/21/2006Letter voicing concerns about pipeline being laid across his property, filed by W. Burtle (consumer)2
09/21/2006 Transmittal No. PF06-30-000, copy of FERC letter sent to R. Christin.2
09/20/2006Letter and attachment requesting the Federal Energy Regulatory Commission (FERC) Staff commence the National Environmental Policy Act (NEPA) pre-filing process for the proposed Rockies Express-East(REX-East) Pipeline project filed by R. Christin.53
09/19/2006In the matter of Board Investigation of the pre-filing process and application to FERC by Rockies Express Pipeline, LLC, for the Rockies Express-East Interstate Natural Gas Pipeline.1