DIS - Case Record for 00-0686-EL-BGN Skip to main content

Case Record For:

00-0686-EL-BGN

File a Public Comment
Case Title: DRESDEN ENERGY/MUSKINGUM COUNTY
Status: CL-CLOSED
Industry Code: EL-ELECTRIC
Purpose Code: BGN-Application for a certificate/ generating station
Date Opened: 4/13/2000
Date Closed: 3/24/2015
Printable Docket Card Service List
View per page
Date FiledSummaryPages
03/24/2015Memo closing case with an effective date of 3/24/15.1
02/03/2012Notice of Dresden construction completion electronically filed by Erin C. Miller on behalf of Appalachian Power Company.2
08/30/2011Service Notice3
08/29/2011Entry ordering that the joint application to transfer the certificate from AEGCo to APCo be granted. (OPSB)3
07/26/2011Application for a Certificate of Environmental Compatibility and Public Need to Construct the Dresden Energy Facility Located in Muskingum County, OHio electronically filed by Mr. Matthew J Satterwhite on behalf of AEP Generating Company and Appalachian Power Company14
08/21/2007Service notice.2
08/20/2007Entry granting request to transfer the certificate in this case to AEGCo as set forth in finding (8). (OPSB)3
08/17/2007Letter stating the Dresden Energy will be liable for payment of expenses incurred by the staff prior to the transfer of the assets and property, filed by F. Woods III. 1
08/08/2007Joint application to transfer a certificate of AEP Generating Company filed by S. Nourse and S. Bloomfield on behalf of Dresden Energy LLC. 3
04/02/2007Letter stating the completion milestones for work planned in 2006 filed by B. Clepper on behalf of Dresden Energy LLC. 1
08/08/2005Revised permit to install application package filed by P. Faggert on behalf of Dresden Energy LLC, Dominion.3
03/17/2005Letter stating the contractors will resume work on the cofferdam, bulkhead, and sheet pile wall at the River Intake Area (RIA) as early as April 4, 2005 filed by B. Clepper on behalf of Dominion Energy.2
03/17/2005Letter stating the contractors will begin the geotechnical investigation of the gravel pit area to the northwest of the intersection of Dresden and McGlade School Roads filed by B. Clepper on behalf of Dominion Energy.2
11/02/2004Additional information filed by G. Miller on behalf of Department of the Army.2
08/31/2004Letter stating staff has reviewed the drawings submitted on 8/26/04; the work may proceed as discussed at the preconstruction conference filed by K. Lambeck.1
05/25/2004Attached drawings requested during the July 23, 2003 site meeting of the additional Storage Structure, filed by B. Clepper.7
11/10/2003Letter updating a previous letter dated 10/29/2003 requesting extension until 11/14/2003 to provide a submittal that documents an evaluation of the alternatives, an extension until 11/30/2003 has been granted filed on behalf of applicant by G. Mullins.1
10/07/2003Letter to Martin L. Bowling, Jr., Dominion Energy & Dominion Generation, granting his request for an extension until November 1, 2003, filed on behalf of the Department of the Army by G. Mullins.1
08/20/2003Correspondence letter regarding the application, filed on behalf of the Department of the Army by G. Mullins.2
08/01/2003Letter to Mr. Lambeck and Mr. Winget of the PUCO staff from Dresden Energy Facility by B. Clepper.2
07/24/2003Letter to Mr. Lambeck and Mr. Winget of PUCO staff, with drawings requested during the July 23, 2003 meeting, filed on behalf of Dresden Energy Facility by B. Clepper.1
07/17/2003Letter to Mr. Lambeck and Mr. Winget of the Commission filed on behalf of the Dresden Energy Facility by B. Clepper.1
05/15/2003Correspondence to Mr. Winget and Mr. Lambeck of PUCO staff, filed on behalf of Dresden Energy Facility by B. Clepper.1
04/02/2003Letter to Brian Clepper, Dominion, stating that the tree removal may proceed as requested, filed by K. Lambeck, PUCO staff.1
04/02/2003Investigation report approving the Letter of Notification, filed by L. Winget, PUCO staff.1
03/25/2003Letter stating that the work is scheduled to begin on April 7, 2003 and completed before April 15, 2003, filed on behalf of applicant by B. Clepper.1
02/14/2003Request that a brief preconstruction conference wit the contractor be held with OPSB staff in attendance, filed by K. Lambeck, PUCO staff.1
02/03/2003Letter stating that, once the contractor has been selected to construct the pipeline and ductbank, a preconstruction conference with that contractor be held, filed on behalf of the OPSB staff by K. Lambeck.1
02/03/2003Letter requesting that, once the contractor has been selected, a preconstruction conference with that contractor be held, filed on behalf of the OPSB staff by K. Lambeck.1
01/27/2003Letter with one set of the drawings from Sargent Lundy titled SKME-1, Sheets 1-3, identifying the location of the the intake liens and electrical ductbank; detailed engineering to the electrical ductbank on document E300, Sheets 65-71; and drawings of the intake and discharge line on document M408, Sheets 60-65, filed on behalf of Dresden Energy Facility by S. Bloomfield.17
01/24/2003Letter informing the Commission of the process to move forward with the construction of the discharge pipe from the pretreatment plant to the river, filed on behalf of The Dresden Energy LLC by B. Clepper.1
01/24/2003Letter request a pre-construction meeting between The Dresden Energy, LLC and the PUCO staff, by B. Clepper.1
12/30/2002Letter regarding the Dresden Energy Project filed by B. Clepper.1
11/22/2002NPDES Storm Water Pollution Prevention Plan, Phase II, filed on behalf of applicant.38
11/20/2002Letter informing the Commission that on this same day under separate cover Mr. Winget for the Ohio Power Siting Board was provided three copies of the NPDES Storm Water Pollution Prevention Plan, filed on behalf of applicant by S. Bloomfield.1
10/04/2002Letter regarding the drawings submitted on the water treatment facility, filed by K. Lambeck1
09/11/2002Request for authorization to initiate construction activities on the foundation for the pump station at the Dresden Energy Facility project site, filed on behalf of applicant by S. Bloomfield.2
07/16/2002NPDES Storm water pollution prevention plan for storm water discharges, Phase I, filed.34
06/28/2002Letter regarding the Apache concrete, Dresden Energy Facility off site parking project filed by B. Clepper.1
05/17/2002Additional information filed on behalf of applicant by B. Clepper.1
05/01/2002Blast design submittal filed on behalf of applicant by S. Bloomfield.58
04/24/2002Correspondence regarding the OPSB new laydown area site on the 24th.3
04/18/2002Letter regarding off site laydown of equipment and materials filed by B. Clepper on behalf of Dominion.1
04/18/2002Letter with clarification of pre- construction information filed by B. Clepper on behalf of Dominion.1
04/15/2002Letter informing the Commission that on this same day under separate cover, drawings for the intake and discharge facilities were provided to Mr. Winget, PUCO staff, filed on behalf of applicant by S. Bloomfield.1
04/12/2002Letter regarding the Beaver Construction project on 4/11/02, filed by K. Lambeck.1
04/12/2002Letter regarding the proposed Dresden Energy Facility River Area Work Timeline, by S. Bloomfield.2
04/11/2002Letter regarding the Dresden project site preconstruction meeting relative to the intake/discharge portion of the project, filed by S. Bloomfield. 1
04/09/2002Letter regarding the Power Generations Facility and construction parking, by B. Clepper.1
04/09/2002Letter stating pre-construction meeting for site development project scheduled at 10:00 a.m. on 4/11/02 at the Dresden Energy Site by B. CLepper. 1
04/05/2002Letter regarding the proposed route for the water intake and discharge facilities, filed by K. Lambeck.1
04/03/2002Letter stating that the temporary covered storage area will be constructed on the northeastern corner of the Dresden Energy LLC power generations facility, by B. Clepper.1
04/03/2002Letter stating that the equipment contractor has secured a vacant nonagricultural land, for the storage of four (4) conex containers located on the east side of Dresden Road, by B. Clepper.1
03/28/2002Letter stating that the Dresden Site has received a permit to build the Pump Structure, filed on behalf of applicant by B. Clepper.1
03/25/2002Request for permission for a contractor of Dresden Energy LLC to use additional laydown area to the east of the Power Generations facility on a short-term basis, filed on behalf of applicant by B. Clepper.1
03/25/2002Request for permission to relocate an existing 2-inch steel gas line owned and operated by CGAS Inc., filed on behalf of applicant by B. Clepper.1
03/22/2002Letter informing the Ohio Power Siting Board that Dresden Site has received a Road Crossing and a Driveway Permit from Mr. Loren Camp of the Muskingum County Engineers Office on March 15, and March 11, 2002, respectively, filed on behalf of applicant by B. Clepper.1
03/22/2002Outline of phase 1 of a multi-phase environmental restoration plan, filed on behalf of applicant.2
03/20/2002Additional information filed on behalf of applicant by S. Bloomfield.3
03/19/2002Letter informing the Commission that on this same day under separate cover the NPDES Storm Water Pollution Prevention Plan for Storm Water Discharges Associated with Pretreatment, Intake, and Discharge Construction Activities-Phase I was provided to Mr. Winget of the Ohio Power Siting Board, filed on behalf of applicant by S. Bloomfield.1
03/11/2002Letter stating that on this same day under separate cover drawings pertaining to the Dresden Intake and discharge facilities, the pretreatment area and the pipeline corridor were provided to Mr. Winget for the Ohio Power Siting Board, filed on behalf of applicant by S. Bloomfield.1
02/01/2002Letter stating construction at the Dresden site will officially begin on 2/4/02 filed by S. Bloomfield.1
10/24/2001Final permits provided to Leon Winget, Ohio Power Siting Board, filed on behalf of applicant by S. Bloomfield1
09/21/2001Additional information filed on behalf of applicant by S. Bloomfield.47
09/17/2001Correspondence letter dated September 12, 2001 to Salvatore Minopoli, Dresden Energy, LLC, filed by James M. Richmond, Department of the Army.2
09/12/2001September 12, 2001 letter from the U.S. Army Corps of Engineers to Dresden Energy concerning the 0.38 acre of wetland at the plant site and construction of an outfall and associated intake structure in the Muskingum River, filed on behalf of applicant by S. Bloomfield.3
08/31/2001Letter stating that on August 21, Dominion Energy was issued a draft Ohio EPA permit to discharge to state waters, filed on behalf of applicant by S. Bloomfield.1
08/21/2001Revised NPDES Storm Water Prevention Plan filed on behalf of applicant by S. Bloomfield.34
08/16/2001Letter stating that on this same day under separate cover, a revised NPDES Storm Water Prevention Plan was provided to Mr. Winget and Steve Malone, filed on behalf of applicant by S. Bloomfield.1
08/13/2001Letter stating that on this same day under separate cover, blasting information was provided to Mr. Winget for the Ohio Power Siting Board, filed on behalf of applicant by S. Bloomfield.1
08/13/2001Letter informing the Commission that today under separate cover, Environmental Protection Agency construction drawings incorporating revisions to the silt fence and sedimentation swales were provided to Mr. Winget for the Ohio Siting Board, filed on behalf of applicant by S. Bloomfield.1
08/13/2001Letter stating that the PUCO staff gives its approval of the company's current plans to minimize environmental impacts during the construction phase of the project, filed by J. Bair.1
08/10/2001Clarification to the minutes of August 2, 2001, filed on behalf of applicant by S. Bloomfield.1
08/10/2001Correspondence letter to Sally Bloomfield regarding the August 2, 2001 meeting, filed by J. Bair, PUCO staff.2
08/07/2001Minutes taken of discussions on August 2, 2001 at the Dresden Fire Station and at the project site of the Dresden Energy Facility, filed on behalf of applicant by S. Bloomfield.6
08/07/2001Additional information filed on behalf of applicant by S. Bloomfield.4
07/30/2001Site plans filed on behalf of applicant.2
07/19/2001Undertaking of Dresden Energy, LLC filed by S. Bloomfield.2
07/17/2001Updated River Area Development Plot Plan filed by S. Bloomfield.2
07/16/2001Letter regarding Dresden Energy Facility. Filed by S. Bloomfield.1
07/09/2001Letter stating drawings of the revised general equipment arrangement were presented to Leon Winget filed by S. Bloomfield.1
07/02/2001Letter informing the Commission that on this same day under separate cover, Mr. Winget of the Ohio Power Siting Board was provided the resume of Brian M. Clepper for approval by the OPSB as the environmental specialist on site at all times when construction is being performed in or near the construction site, filed on behalf of applicant by S. Bloomfield.1
06/26/2001Letter informing the Commission that on this same day under separate cover, Mr. Winget for the Ohio Power Siting Board has been provided the Ohio EPA Storm Water General Permit Number OH110349 issued June 14, 2001 to Dominion Energy for construction activity for the Dresden Energy Facility, filed on behalf of applicant by S. Bloomfield.1
06/15/2001Revised Grading and Drainage plans filed on behalf of applicant by B. Reynolds.3
06/15/2001Earthwork construction drawings filed on behalf of applicant.3
06/14/2001Staff report of site visit filed.2
06/08/2001Muskingum County, Ohio General Stormwater Drainage Permit No. 2001-105 filed on behalf of applicant by S. Bloomfield.2
06/05/2001Request that Dominion and all its contractors cease and desist from any further work at the site pending Staff's investigation into this matter, filed on behalf of the PUCO staff by K. Lambeck.1
05/18/2001Letter informing the Commission that on this same day under separate cover, the NPDES Storm Water Pollution Prevention Plan for Storm Water Discharges Associated with Construction Activity, dated May 11, 2001, has been provided to Mr. Winget for the Ohio Power Siting Board, filed on behalf of applicant by S. Bloomfield.1
05/15/2001Letter stating signature pages to the operating agreement were provided to Leon Winget filed by S. Bloomfield.1
05/15/2001Letter stating the River Area Development Plot Plan was delivered to Leon Winget filed by S. Bloomfield.1
05/14/2001Letter informing the Commission that on this same day under separate cover, the May 2001 Phase I Cultural Resource Investigation for the Dresden Energy Facility, have been provided to Mr. Winget for the Ohio Power Siting Board, filed on behalf of applicant by S. Bloomfield.1
05/03/2001Letter informing the Commission that on this same date under separate cover, the Switchyard Agreement has been provided to L. Winget, PUCO staff, filed on behalf of applicant by S. Bloomfield.1
05/02/2001Letter stating that applicant will be utilizing the 821 feet elevation and, thus, only the drawings filed April 20, 2001, for the 821 feet elevation will require review, filed on behalf of applicant by S. Bloomfield.1
04/23/2001Correction to letter and attachments filed on April 20, 2001, filed on behalf of applicant by S. Bloomfield.1
04/20/2001Letter stating that under separate cover, Mr. Winget was provided three sets of two Earthwork Construction Drawings, filed on behalf of applicant by S. Bloomfield.1
03/26/2001Letter stating that 3 copies of the revised work plan for Phase II archaeological investigations were given to Jim O'Dell filed by S. Bloomfield. (copies were not filed in Docketing)1
03/16/2001River intake and discharge line construction drawings filed by S. Bloomfield.1
03/08/2001Construction drawings for the Dresden Energy Facility filed by S. Bloomfield1
02/13/2001Service Notice.5
02/12/2001Opinion ordering that a certificate of Environmental Compatibility and Public Need for the project is issued to Dresden For the construction, operation, and maintenance of the proposed facility at the preferred site. 23
01/09/2001Joint stipulation and recommendation filed on behalf of the Ohio Power Siting Board (PUCO) staff by J. Bair; the Ohio Power Siting Board staff (Environmental Enforcement Section) by M. Malone; and Dresden Energy by S. Bloomfield;12
12/20/2000Facility Environmental Noise Emissions study filed on behalf of applicant by S. Bloomfield.5
12/07/2000Transcript filed for hearing held 11/22/00, (GP), 14 pgs., Submitted. (PUCO-Columbus, OH)26
11/28/2000Transcript filed for hearing held 11/21/00, (GP), 11 pgs., Con't. (Dresden, Ohio)11
11/28/2000Proof of publication filed on behalf of applicant by S. Bloomfield. (Muskingum County)3
11/20/2000Letter confirming that the archeological report dated October, 2000 containing Phase I, was provided to the PUCO staff and the Ohio Power Siting Board staff on November 17, 2000, filed on behalf of applicant by S. Bloomfield.1
11/15/2000Proof of publication filed on behalf of applicant by S. Bloomfield.5
11/07/2000ICN #0015 Letter stating that, based on final analysis, textual changes were necessary that Staff was unable to incorporate in the Staff Report docketed November 6, 2000; therefore, a revision was necessary to the staff report and this issuance of the staff report, docketed November 7, 2000, supersedes the previous report, filed on behalf of the PUCO staff by K. Wissman. (1 pg.)1
11/07/2000ICN #0016 Revised Staff Report filed. (47 pgs.)47
11/06/2000ICN #0014 Staff Report filed. (47 pgs.)47
10/25/2000ICN #0013 Proof of letter mailing to area homeowners and submission of homeowner mailing list to the Board, filed on behalf of applicant by S. Bloomfield. (43 pgs.)43
10/06/2000Dresden Energy, LLC'S Responses to staff's First set of Interrogatories and Request for production of documents. Filed by S. Bloomfield (4 pgs)4
09/29/2000Affidavits of Publication from the Dresden Transcript and the Times Recorder. Filed by C. Edwards (5 pgs)5
09/29/2000Affidavits of publication from the Dresden Transcript and the Times Recorder. Filed by C. Edwards (4 pgs)4
09/15/2000ICN #0009 Entry scheduling a local hearing at 7:00 p.m. on November 21, 2000, at the Dresden Municipal Building, Dresden, Ohio; scheduling an adjudicatory hearing at 10:00 a.m. on November 22, 2000, at the Commission offices. (AE) (2 pgs.)2
08/24/2000ICN#0007 Response letter sent to Sally Bloomfield regarding application, filed on behalf of PUCO staff.2
08/24/2000ICN #0008 Proof of service of certified application on heads of public agencies charged with the duty of pro- tecting the environment, filed on behalf of applicant by C. Edwards. (34 pgs.)34
08/24/2000 ICN #0006 Copy of check for application filed by S. Bloomfield on behalf of applicant.2
06/23/2000Part 2 ICN#0005 Application filed on behalf of applicant by S. Bloomfield391
06/23/2000ICN #0005 Applicaiton filed on behalf of applicant by S. Bloomfield. (391 pgs.)391
05/04/2000ICN #0004 Proofs of Publication filed on behalf of appli- cant by S. Bloomfield. (Muskingum County)5
04/28/2000Entry ordering, that motions for waivers of numerous filing requirements of Duke (in Case No. 00-670-El-BGN) and Dresden (in Case No. 00-686-El-BGN) are granted in part and denied in part, as detailed herein. (AE) (5 pgs)5
04/21/2000ICN #0002 Additional information filed on behalf of appli- cant. (1 pg.)1
04/13/2000ICN #0001 In the matter of the application of Dresden Energy, LLC for a certificate of environmental com- patibility and public need of a Merchant Power Plant in Muskingum County, Ohio. (13 pgs.)13